-
Contract Timeline
- Publication Date
-
9th January 2025 13:10:02 PM
-
Contract Summary
The work is to be broken down into 4 parts. • The existing pool filters are to be removed and be replaced with new ones. This is to be design by a pool specialist. A section of the flat roof will require removal and reinstating to allow for the supply of the new filters. • The existing boilers are to be removed and replaced with new boilers, flues, control modifications and shunt pumps. • The main pool hall air handling unit is to be removed and replaced with new. The air handling units are currently screened off with a louvre. This is to be replaced with new and the flat roofs and wall replaced/repaired. • The male and female changing rooms are to be refreshed. (ie in principle items stay in same location but are replaced with new) Works includes white rock to some walls, new locker doors, new toilets, showers, wash hand basins, cubicles, suspended ceiling and lighting. As a guide a changing room includes 6 changing cubicles, 3 wc
-
Contract Details
- Open Contracting ID
-
ocds-b5fd17-830c83a9-53ee-47ec-817f-cb2338d383ff
- Publication Source
-
Contracts Finder
- Procurement Stage
-
Award
- Procurement Method
-
Selective
- Procurement Method Details
-
Restricted Procedure
- Procurement Category
-
Works
- Tender Suitability
-
- Framework / DPS
-
Contract Classification
- CPV Code(s)
-
45350000
45351000
71333000
71334000 - CPV Division(s)
-
45 - Construction work
71 - Architectural, construction, engineering and inspection services
-
Awarding Authority
- Buyer Name
-
David Sanderson
- Buyer Email
-
david.sanderson@kirklees.gov.uk
- Buyer Phone
-
+44 1484221000
- Buyer Address
-
PO Box 1720
Huddersfield
HD1 2TA
ENG
-
Awarded Supplier(s)