{
    "tag": [
        "compiled"
    ],
    "id": "ocds-b5fd17-214583c7-7fc4-4816-a79a-db062549675f-2021-12-17T07:10:03Z",
    "date": "2021-12-17T07:10:03Z",
    "ocid": "ocds-b5fd17-214583c7-7fc4-4816-a79a-db062549675f",
    "language": "en",
    "initiationType": "tender",
    "title": "STEELWORK AND EXTERNAL ENVELOPE Reference number: PPP/MPPKDP2/6",
    "planning": {
        "milestones": [
            {
                "id": "1",
                "title": "Engagement end date",
                "type": "engagement",
                "dueDate": "2022-01-05T23:59:59Z"
            }
        ],
        "documents": [
            {
                "id": "1",
                "documentType": "marketEngagementNotice",
                "description": "Early engagement notice on Contracts Finder",
                "url": "https://www.contractsfinder.service.gov.uk/Notice/8d6e2541-abef-4891-b072-b449e7407e54",
                "datePublished": "2021-12-17T07:10:03Z",
                "format": "text/html",
                "language": "en"
            }
        ]
    },
    "tender": {
        "id": "CTM RFT 14954",
        "title": "STEELWORK AND EXTERNAL ENVELOPE Reference number: PPP/MPPKDP2/6",
        "description": "This package of work consists of Steelwork - known as KDP2 and External Envelope - known as KDP6. The scope includes all the typical elements of work usually associated with the delivery of steelwork, both structural and other, and the cladding of industrial buildings. It is intended that the scope includes the following general classifications of work. Please note that this list is non-exhaustive. Early Contractor Involvement, Final Design, Temporary Works, Structural Steelwork, Steel Frames, General Steelwork, Structural Metalwork, General Metalwork, Metal Decking, Metal Walkways, Edge Protection, Cladding and Roofing. All works to include supply and erect services. Early Contractor Involvement (ECI) is seen as one of the PPP's key drivers to procure in this way, as it will enable the supply chain to have a long-term influence on the way in which projects are designed and delivered. This is a 18 year framework Additional information: The Programme and Project Partners (PPP) at Sellafield are undertaking a procurement exercise to engage with Key Delivery Partner's (KDP's) via a Multi Project Procurement (MPP) process. The PPP model has been established to deliver approximately 25 projects consisting of new build, as well as some upgrade and refurbishment of existing buildings This package of work consists of Steelwork - known as KDP2 and External Envelope - known as KDP6. The scope includes all the typical elements of work usually associated with the delivery of steelwork, both structural and other, and the cladding of industrial buildings. It is intended that the scope includes the following general classifications of work. Please note that this list is non-exhaustive. Early Contractor Involvement, Final Design, Temporary Works, Structural Steelwork, Steel Frames, General Steelwork, Structural Metalwork, General Metalwork, Metal Decking, Metal Walkways, Edge Protection, Cladding and Roofing. All works to include supply and erect services. Early Contractor Involvement (ECI) is seen as one of the PPP's key drivers to procure in this way, as it will enable the supply chain to have a long-term influence on the way in which projects are designed and delivered. The outcomes being projects that are delivered more safely, are better designed (innovative), of a higher quality, whilst being environmentally sympathetic, easier to maintain, delivered on time and within budget. The 18-year framework provides an unparalleled opportunity for the PPP and supply chain to develop long-term relationships that can grow and adapt organically over time, to create a world class legacy of excellence for the design and construction of nuclear facilities.",
        "status": "planning",
        "classification": {
            "scheme": "CPV",
            "id": "45000000",
            "description": "Construction work"
        },
        "items": [
            {
                "id": "1",
                "deliveryAddresses": [
                    {
                        "postalCode": "WA3 6AU"
                    }
                ]
            }
        ],
        "suitability": {
            "sme": false,
            "vcse": false
        }
    },
    "parties": [
        {
            "id": "GB-SRS-sid4gov.cabinetoffice.gov.uk/V46d8W3T",
            "name": "Sellafield",
            "identifier": {
                "legalName": "Sellafield",
                "scheme": "GB-SRS",
                "id": "sid4gov.cabinetoffice.gov.uk/V46d8W3T"
            },
            "address": {
                "streetAddress": "Morgan Sindall Construction and Infrastucture, Allday House / Warrington Road, Birchwood",
                "locality": "Warrington",
                "postalCode": "WA3 6AU",
                "countryName": "England"
            },
            "contactPoint": {
                "name": "Dawn Keenan",
                "email": "Dawn.keenan@sl-ppp.co.uk"
            },
            "details": {
                "url": "https://sharedsystems.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=15333&B=SELLAFIELD"
            },
            "roles": [
                "buyer"
            ]
        }
    ],
    "buyer": {
        "id": "GB-SRS-sid4gov.cabinetoffice.gov.uk/V46d8W3T",
        "name": "Sellafield"
    }
}