    "tag": [
        "compiled"
    ],
    "id": "ocds-h6vhtk-02d884-2022-04-11T14:34:07+01:00",
    "date": "2022-04-11T14:34:07+01:00",
    "ocid": "ocds-h6vhtk-02d884",
    "description": "This procurement relates to a subsidised contract under Regulation 13 of the PCR and has therefore been carried out in accordance with Part 2 of the PCR.",
    "initiationType": "tender",
    "tender": {
        "id": "PCR1/2021/MD",
        "legalBasis": {
            "id": "32014L0024",
            "scheme": "CELEX"
        },
        "title": "Environmental Planning for Nuclear Decommissioning at Hartlepool, Heysham 1 and Dungeness B Power Stations",
        "status": "complete",
        "classification": {
            "scheme": "CPV",
            "id": "90712000",
            "description": "Environmental planning"
        },
        "mainProcurementCategory": "services",
        "description": "The provision of professional services to prepare and submit Environmental Impact Assessment for Decommissioning Regulations (EIADR) and Town and Country Planning Act (TCPA) planning applications, as well as other supporting assessments and documents, for the new waste management facilities at Heysham 1 Power Station, Hartlepool Power Station and Dungeness B Power Station. A summary of the key scope elements requirements of this Service is comprised of the following key elements set out below: 1. Planning 2. Consultation and Engagement 3. Environmental Impact Assessment (EIA) 4. Marine Licence Applications",
        "value": {
            "amount": 4200000,
            "currency": "GBP"
        },
        "lotDetails": {
            "maximumLotsAwardedPerSupplier": 3,
            "awardCriteriaDetails": "There is no limit on the number of lots a tenderer may bid for and be awarded if successful. At all stages throughout the procurement process tenderers will be required to demonstrate their capability and capacity for delivering the number of Lots they are bidding for and the response will be assessed accordingly. Where tenderers are bidding for multiple lots but cannot demonstrate the capacity/ capability to deliver multiple Lots in its tender response, EDF reserves the right to award Contracts to more than one Tenderer. In accordance with Regulation 46(6) of the Public Contracts Regulations 2015 (PCR), EDF reserves the right to award contracts combining several lots where multiple lots are awarded to the same tenderer. For the avoidance of doubt, any of the lots awarded to the same tenderer may be combined. Alternatively EDF may decide to award separate contracts to the same tenderer if successful across multiple lots."
        },
        "lots": [
            {
                "id": "1",
                "title": "Environmental Planning for Nuclear Decommissioning at Heysham 1 Power Station",
                "description": "The provision of professional services to prepare and submit planning applications, as well as other supporting assessments and documents, for the new waste management facilities at Heysham 1 Power Station. The scope of professional services also includes the preparation of an environmental statement for the decommissioning project under the Environmental Impact Assessment for Decommissioning Regulations (EIADR). A summary of the key scope elements requirements of this Service is comprised of the following key elements set out below: Planning: Planning permission is required from each relevant Local Planning Authority (LPA) under the TCPA to enable the construction and commission of each of the three waste management facilities. As part of this, planning advice on the scope of civil works, preparation of the planning application (including the planning statement and design and access statements), support during the application determination and post determination in discharging planning conditions will be required. Consultation and Engagement: Support is required in consultation and event management to support both TCPA and EIADR applications, including preparing consultation material, online and virtual engagement platforms, and data management in accordance with the General Data Protection Regulation requirements. The preparation of Consultation Plans and Consultation Reports is also required. Environmental Impact Assessment (EIA): The potential environmental impacts of the decommissioning work has to be assessed through the EIA process, with appropriate Environmental Statements (ES) being submitted with each application for permission, as required by the TCPA EIA Regulations and the EIADR. Marine Licence Applications: Some civil works associated with the waste management facilities and decommissioning works in the marine environment may also require a Marine Licence under the Marine and Coastal Access Act.",
                "value": {
                    "amount": 1400000,
                    "currency": "GBP"
                },
                "contractPeriod": {
                    "durationInDays": 2520
                },
                "hasRenewal": false,
                "secondStage": {
                    "minimumCandidates": 5,
                    "maximumCandidates": 5
                },
                "selectionCriteria": {
                    "description": "As set out in the procurement documents"
                },
                "submissionTerms": {
                    "variantPolicy": "notAllowed"
                },
                "hasOptions": false,
                "status": "cancelled",
                "awardCriteria": {
                    "criteria": [
                        {
                            "name": "Quality",
                            "type": "quality",
                            "description": "70%"
                        },
                        {
                            "name": "Commercial",
                            "type": "cost",
                            "description": "30%"
                        }
                    ]
                }
            },
            {
                "id": "2",
                "title": "Environmental Planning for Nuclear Decommissioning at Hartlepool Power Stations",
                "description": "The provision of professional services to prepare and submit planning applications, as well as other supporting assessments and documents, for the new waste management facilities at Hartlepool Power Station. The scope of professional services also includes the preparation of an environmental statement for the decommissioning project under the Environmental Impact Assessment for Decommissioning Regulations (EIADR). A summary of the key scope elements requirements of this Service is comprised of the following key elements set out below: Planning: Planning permission is required from each relevant Local Planning Authority (LPA) under the TCPA to enable the construction and commission of each of the three waste management facilities. As part of this, planning advice on the scope of civil works, preparation of the planning application (including the planning statement and design and access statements), support during the application determination and post determination in discharging planning conditions will be required. Consultation and Engagement: Support is required in consultation and event management to support both TCPA and EIADR applications, including preparing consultation material, online and virtual engagement platforms, and data management in accordance with the General Data Protection Regulation requirements. The preparation of Consultation Plans and Consultation Reports is also required. Environmental Impact Assessment (EIA): The potential environmental impacts of the decommissioning work has to be assessed through the EIA process, with appropriate Environmental Statements (ES) being submitted with each application for permission, as required by the TCPA EIA Regulations and the EIADR. Marine Licence Applications: Some civil works associated with the waste management facilities and decommissioning works in the marine environment may also require a Marine Licence under the Marine and Coastal Access Act.",
                "value": {
                    "amount": 1400000,
                    "currency": "GBP"
                },
                "contractPeriod": {
                    "durationInDays": 2520
                },
                "hasRenewal": false,
                "secondStage": {
                    "minimumCandidates": 5,
                    "maximumCandidates": 5
                },
                "selectionCriteria": {
                    "description": "As set out in the procurement documents"
                },
                "submissionTerms": {
                    "variantPolicy": "notAllowed"
                },
                "hasOptions": false,
                "status": "cancelled",
                "awardCriteria": {
                    "criteria": [
                        {
                            "name": "Quality",
                            "type": "quality",
                            "description": "70%"
                        },
                        {
                            "name": "Commercial",
                            "type": "cost",
                            "description": "30%"
                        }
                    ]
                }
            },
            {
                "id": "3",
                "title": "Environmental Planning for Nuclear Decommissioning at Dungeness B Power Station",
                "description": "The provision of professional services to prepare and submit planning applications, as well as other supporting assessments and documents, for the new waste management facilities at Dungeness B Power Station. The scope of professional services also includes the preparation of an environmental statement for the decommissioning project under the Environmental Impact Assessment for Decommissioning Regulations (EIADR). A summary of the key scope elements requirements of this Service is comprised of the following key elements set out below: Planning: Planning permission is required from each relevant Local Planning Authority (LPA) under the TCPA to enable the construction and commission of each of the three waste management facilities. As part of this, planning advice on the scope of civil works, preparation of the planning application (including the planning statement and design and access statements), support during the application determination and post determination in discharging planning conditions will be required. Consultation and Engagement: Support is required in consultation and event management to support both TCPA and EIADR applications, including preparing consultation material, online and virtual engagement platforms, and data management in accordance with the General Data Protection Regulation requirements. The preparation of Consultation Plans and Consultation Reports is also required. Environmental Impact Assessment (EIA): The potential environmental impacts of the decommissioning work has to be assessed through the EIA process, with appropriate Environmental Statements (ES) being submitted with each application for permission, as required by the TCPA EIA Regulations and the EIADR. Marine Licence Applications: Some civil works associated with the waste management facilities and decommissioning works in the marine environment may also require a Marine Licence under the Marine and Coastal Access Act.",
                "value": {
                    "amount": 1400000,
                    "currency": "GBP"
                },
                "contractPeriod": {
                    "durationInDays": 2520
                },
                "hasRenewal": false,
                "secondStage": {
                    "minimumCandidates": 5,
                    "maximumCandidates": 5
                },
                "selectionCriteria": {
                    "description": "As set out in the procurement documents"
                },
                "submissionTerms": {
                    "variantPolicy": "notAllowed"
                },
                "hasOptions": false,
                "status": "cancelled",
                "awardCriteria": {
                    "criteria": [
                        {
                            "name": "Quality",
                            "type": "quality",
                            "description": "70%"
                        },
                        {
                            "name": "Commercial",
                            "type": "cost",
                            "description": "30%"
                        }
                    ]
                }
            }
        ],
        "items": [
            {
                "id": "1",
                "additionalClassifications": [
                    {
                        "scheme": "CPV",
                        "id": "71313440",
                        "description": "Environmental Impact Assessment (EIA) services for construction"
                    },
                    {
                        "scheme": "CPV",
                        "id": "79416200",
                        "description": "Public relations consultancy services"
                    },
                    {
                        "scheme": "CPV",
                        "id": "90711400",
                        "description": "Environmental Impact Assessment (EIA) services other than for construction"
                    }
                ],
                "deliveryAddresses": [
                    {
                        "region": "UKD4"
                    },
                    {
                        "region": "UKD4"
                    }
                ],
                "deliveryLocation": {
                    "description": "Heysham 1 Power Station Morecambe Lancashire LA3 2XH"
                },
                "relatedLot": "1"
            },
            {
                "id": "2",
                "additionalClassifications": [
                    {
                        "scheme": "CPV",
                        "id": "71313440",
                        "description": "Environmental Impact Assessment (EIA) services for construction"
                    },
                    {
                        "scheme": "CPV",
                        "id": "79416200",
                        "description": "Public relations consultancy services"
                    },
                    {
                        "scheme": "CPV",
                        "id": "90711400",
                        "description": "Environmental Impact Assessment (EIA) services other than for construction"
                    }
                ],
                "deliveryAddresses": [
                    {
                        "region": "UKC11"
                    },
                    {
                        "region": "UKC11"
                    }
                ],
                "deliveryLocation": {
                    "description": "Hartlepool Power Station Tees Road Hartlepool TS25 2BZ"
                },
                "relatedLot": "2"
            },
            {
                "id": "3",
                "additionalClassifications": [
                    {
                        "scheme": "CPV",
                        "id": "71313440",
                        "description": "Environmental Impact Assessment (EIA) services for construction"
                    },
                    {
                        "scheme": "CPV",
                        "id": "79416200",
                        "description": "Public relations consultancy services"
                    },
                    {
                        "scheme": "CPV",
                        "id": "90711400",
                        "description": "Environmental Impact Assessment (EIA) services other than for construction"
                    }
                ],
                "deliveryAddresses": [
                    {
                        "region": "UKJ4"
                    },
                    {
                        "region": "UKJ4"
                    }
                ],
                "deliveryLocation": {
                    "description": "Dungeness B Power Station Romney Marsh Kent TN29 9PX"
                },
                "relatedLot": "3"
            }
        ],
        "participationFees": [
            {
                "id": "1",
                "type": [
                    "document"
                ]
            }
        ],
        "submissionMethod": [
            "electronicSubmission"
        ],
        "submissionMethodDetails": "https://pha.edf.com/page.aspx/en/usr/login",
        "selectionCriteria": {
            "criteria": [
                {
                    "type": "suitability",
                    "description": "Conditions for participation and selection criteria as set out in the procurement documents",
                    "appliesTo": [
                        "supplier"
                    ]
                }
            ]
        },
        "documents": [
            {
                "id": "economic",
                "documentType": "economicSelectionCriteria"
            },
            {
                "id": "technical",
                "documentType": "technicalSelectionCriteria"
            }
        ],
        "otherRequirements": {
            "requiresStaffNamesAndQualifications": true
        },
        "procurementMethod": "selective",
        "procurementMethodDetails": "Restricted procedure",
        "tenderPeriod": {
            "endDate": "2021-09-23T12:00:00+01:00"
        },
        "secondStage": {
            "invitationDate": "2021-10-25T00:00:00+01:00"
        },
        "submissionTerms": {
            "languages": [
                "en"
            ],
            "bidValidityPeriod": {
                "durationInDays": 180
            }
        },
        "hasRecurrence": false
    },
    "parties": [
        {
            "id": "GB-FTS-26398",
            "name": "EDF Energy Nuclear Generation Limited (\"EDF\")",
            "identifier": {
                "legalName": "EDF Energy Nuclear Generation Limited (\"EDF\")"
            },
            "address": {
                "streetAddress": "Barnett Way, Barnwood",
                "locality": "GLOUCESTER",
                "region": "UK",
                "postalCode": "GL43RS",
                "countryName": "United Kingdom"
            },
            "contactPoint": {
                "name": "Matthew Dally",
                "email": "contactus.procurement@edf-energy.com",
                "url": "https://pha.edf.com/page.aspx/en/usr/login"
            },
            "roles": [
                "buyer"
            ],
            "details": {
                "url": "http://www.edfenergy.com",
                "buyerProfile": "https://pha.edf.com/page.aspx/en/usr/login",
                "classifications": [
                    {
                        "scheme": "TED_CA_TYPE",
                        "description": "Private company subsidised by the Nuclear Liabilities Fund (NLF) - see VI.3"
                    },
                    {
                        "scheme": "COFOG",
                        "description": "Nuclear Decommissioning"
                    }
                ]
            }
        },
        {
            "id": "GB-FTS-935",
            "name": "High Court of England and Wales",
            "identifier": {
                "legalName": "High Court of England and Wales"
            },
            "address": {
                "streetAddress": "Royal Courts of Justice, Strand",
                "locality": "London",
                "postalCode": "WC2A 2LL",
                "countryName": "United Kingdom"
            },
            "roles": [
                "reviewBody"
            ],
            "details": {
                "url": "http://www.justice.gov.uk"
            }
        },
        {
            "id": "GB-FTS-49543",
            "name": "E D F Energy",
            "identifier": {
                "legalName": "E D F Energy"
            },
            "address": {
                "streetAddress": "Barnett Way, Barnwood",
                "locality": "GLOUCESTER",
                "region": "UK",
                "postalCode": "GL43RS",
                "countryName": "United Kingdom"
            },
            "contactPoint": {
                "name": "Matthew Dally",
                "email": "matthew.dally@edf-energy.com"
            },
            "roles": [
                "buyer"
            ],
            "details": {
                "url": "http://www.edfenergy.com",
                "classifications": [
                    {
                        "scheme": "TED_CA_TYPE",
                        "description": "Private company subsidised by the Nuclear Liabilities Fund (NLF) - see VI.3"
                    },
                    {
                        "scheme": "COFOG",
                        "description": "Nuclear Decommissioning"
                    }
                ]
            }
        },
        {
            "id": "GB-FTS-15359",
            "name": "AECOM Limited",
            "identifier": {
                "legalName": "AECOM Limited"
            },
            "address": {
                "locality": "London",
                "region": "UK",
                "countryName": "United Kingdom"
            },
            "roles": [
                "supplier"
            ],
            "details": {
                "scale": "large"
            }
        }
    ],
    "buyer": {
        "id": "GB-FTS-49543",
        "name": "E D F Energy"
    },
    "language": "en",
    "awards": [
        {
            "id": "009621-2022-1",
            "relatedLots": [
                "1"
            ],
            "title": "Environmental Planning for Nuclear Decommissioning at Heysham 1 Power Station",
            "status": "active",
            "suppliers": [
                {
                    "id": "GB-FTS-15359",
                    "name": "AECOM Limited"
                }
            ]
        },
        {
            "id": "009621-2022-2",
            "relatedLots": [
                "2"
            ],
            "title": "Environmental Planning for Nuclear Decommissioning at Hartlepool Power Station",
            "status": "active",
            "suppliers": [
                {
                    "id": "GB-FTS-15359",
                    "name": "AECOM Limited"
                }
            ]
        },
        {
            "id": "009621-2022-3",
            "relatedLots": [
                "3"
            ],
            "title": "Environmental Planning for Nuclear Decommissioning at Dungeness B Power Station",
            "status": "active",
            "suppliers": [
                {
                    "id": "GB-FTS-15359",
                    "name": "AECOM Limited"
                }
            ]
        }
    ],
    "contracts": [
        {
            "id": "009621-2022-1",
            "awardID": "009621-2022-1",
            "title": "Environmental Planning for Nuclear Decommissioning at Heysham 1 Power Station",
            "status": "active",
            "dateSigned": "2022-03-28T00:00:00+01:00"
        },
        {
            "id": "009621-2022-2",
            "awardID": "009621-2022-2",
            "title": "Environmental Planning for Nuclear Decommissioning at Hartlepool Power Station",
            "status": "active",
            "dateSigned": "2022-03-28T00:00:00+01:00"
        },
        {
            "id": "009621-2022-3",
            "awardID": "009621-2022-3",
            "title": "Environmental Planning for Nuclear Decommissioning at Dungeness B Power Station",
            "status": "active",
            "dateSigned": "2022-03-28T00:00:00+01:00"
        }
    ],
    "bids": {
        "statistics": [
            {
                "id": "5",
                "measure": "bids",
                "relatedLot": "1",
                "value": 5
            },
            {
                "id": "9",
                "measure": "bids",
                "relatedLot": "2",
                "value": 5
            },
            {
                "id": "13",
                "measure": "bids",
                "relatedLot": "3",
                "value": 5
            },
            {
                "id": "6",
                "measure": "electronicBids",
                "relatedLot": "1",
                "value": 5
            },
            {
                "id": "10",
                "measure": "electronicBids",
                "relatedLot": "2",
                "value": 5
            },
            {
                "id": "14",
                "measure": "electronicBids",
                "relatedLot": "3",
                "value": 5
            },
            {
                "id": "3",
                "measure": "lowestValidBidValue",
                "relatedLot": "1",
                "value": 1249658.78,
                "currency": "GBP"
            },
            {
                "id": "7",
                "measure": "lowestValidBidValue",
                "relatedLot": "2",
                "value": 1199756.45,
                "currency": "GBP"
            },
            {
                "id": "11",
                "measure": "lowestValidBidValue",
                "relatedLot": "3",
                "value": 1074295.61,
                "currency": "GBP"
            },
            {
                "id": "4",
                "measure": "highestValidBidValue",
                "relatedLot": "1",
                "value": 1483181.61,
                "currency": "GBP"
            },
            {
                "id": "8",
                "measure": "highestValidBidValue",
                "relatedLot": "2",
                "value": 1462639.71,
                "currency": "GBP"
            },
            {
                "id": "12",
                "measure": "highestValidBidValue",
                "relatedLot": "3",
                "value": 1241395,
                "currency": "GBP"
            },
            {
                "id": "1",
                "measure": "lowestValidBidValue",
                "value": 3523710.84,
                "currency": "GBP"
            },
            {
                "id": "2",
                "measure": "highestValidBidValue",
                "value": 4129626.65,
                "currency": "GBP"
            }
        ]
    }
}