{
    "tag": [
        "compiled"
    ],
    "id": "ocds-h6vhtk-034373-2022-06-07T08:34:37+01:00",
    "date": "2022-06-07T08:34:37+01:00",
    "ocid": "ocds-h6vhtk-034373",
    "description": "HS2 considers that the Railhead Modification and the Transition Modification described at VII.2.1 in this notice (i) falls into the category of modifications in Regulation 88.1(b) of the Utilities Contracts Regulations 2016 (and this has been noted in VII.2.2 below), and (ii) is not substantial within the meaning of Regulation 88.7 of the Utilities Contracts Regulations 2016. HS2 reserves all its rights in respect of the reasons for this publication and whether it is legally obliged to publish such a notice. All values given in this notice are approximate and the best estimates of HS2 at the time of publication of this Notice. HS2's decision to publish this notice does not constitute any waiver of any rights it may have or impose any further obligations on it in respect of any future contract modifications and the publication thereof.",
    "initiationType": "tender",
    "tender": {
        "id": "ocds-h6vhtk-034373",
        "legalBasis": {
            "id": "32014L0025",
            "scheme": "CELEX"
        },
        "title": "Precast Slab Track System",
        "classification": {
            "scheme": "CPV",
            "id": "34000000",
            "description": "Transport equipment and auxiliary products to transportation"
        },
        "mainProcurementCategory": "goods",
        "lots": [
            {
                "id": "1",
                "description": "Contract to design, manufacture and supply precast concrete track slabs for the open route and standard slab track tunnel sections of HS2 Phase 1 and 2a, including installation training and quality support services. Further to this, the inclusion of a railhead at the production facility to enable slab delivery by rail and a design transition activity.",
                "contractPeriod": {
                    "startDate": "2021-01-18T00:00:00Z",
                    "endDate": "2029-04-01T23:59:59+01:00"
                }
            }
        ],
        "items": [
            {
                "id": "1",
                "deliveryAddresses": [
                    {
                        "region": "UK"
                    }
                ],
                "relatedLot": "1"
            }
        ]
    },
    "awards": [
        {
            "id": "015565-2022-C1186-1",
            "relatedLots": [
                "1"
            ],
            "status": "active",
            "suppliers": [
                {
                    "id": "GB-FTS-35726",
                    "name": "PORR UK Ltd"
                }
            ]
        }
    ],
    "parties": [
        {
            "id": "GB-FTS-35725",
            "name": "HS2",
            "identifier": {
                "legalName": "HS2"
            },
            "address": {
                "streetAddress": "High Speed Two (HS2) Ltd, Two Snowhill, Queensway",
                "locality": "Birmingham",
                "region": "UK",
                "countryName": "United Kingdom"
            },
            "contactPoint": {
                "email": "andrew.jennings@hs2.org.uk"
            },
            "roles": [
                "buyer"
            ],
            "details": {
                "url": "https://www.hs2.org.uk"
            }
        },
        {
            "id": "GB-FTS-35726",
            "name": "PORR UK Ltd",
            "identifier": {
                "legalName": "PORR UK Ltd"
            },
            "address": {
                "locality": "Uxbridge",
                "region": "UK",
                "countryName": "United Kingdom"
            },
            "roles": [
                "supplier"
            ],
            "details": {
                "scale": "large"
            }
        },
        {
            "id": "GB-FTS-6977",
            "name": "The High Court",
            "identifier": {
                "legalName": "The High Court"
            },
            "address": {
                "streetAddress": "Royal Courts of Justice",
                "locality": "London",
                "countryName": "United Kingdom"
            },
            "roles": [
                "reviewBody"
            ]
        }
    ],
    "buyer": {
        "id": "GB-FTS-35725",
        "name": "HS2"
    },
    "contracts": [
        {
            "id": "015565-2022-C1186-1",
            "awardID": "015565-2022-C1186-1",
            "status": "active",
            "value": {
                "amount": 299000000,
                "currency": "GBP"
            },
            "dateSigned": "2020-12-12T00:00:00Z",
            "period": {
                "startDate": "2021-01-18T00:00:00Z",
                "endDate": "2029-04-01T23:59:59+01:00"
            },
            "items": [
                {
                    "id": "1",
                    "classification": {
                        "scheme": "CPV",
                        "id": "34000000",
                        "description": "Transport equipment and auxiliary products to transportation"
                    },
                    "deliveryAddresses": [
                        {
                            "region": "UK"
                        }
                    ],
                    "relatedLot": "1"
                }
            ],
            "amendments": [
                {
                    "id": "1",
                    "description": "The new value of the contract in VII.1.6 is the estimated maximum new value, but the value of the additional work may range from nil to 7000000 GBP. The purpose of the modification is to: - allow for the construction and operation of a railhead at the Supplier's Precast Slab Track Production facility, to enable the Track Systems Contractors to transport the Slab Track to the construction railheads by rail as well as by road (the \"Railhead Modification\"); and - extend the design support to cover the timing between the system design and detailed design phases whilst the Track Systems procurement is concluded, due to programme changes over time (the \"Transition Modification\").",
                    "rationale": "Need for additional works, services or supplies by the original contractor/concessionaire: The new value of the contract in VII.1.6 is the estimated maximum new value, but the value of the additional work may range from nil to 7000000 GBP. The Railhead Modification has become necessary to meet the project's strategic objectives of minimising environmental impact and carbon emissions and maximising transport by rail to do so; whilst also mitigating programme risk. The risk of fuel shortages, escalating fuel prices and driver shortages in the current economic situation means that transport by rail is now a more economical option than transport by road to achieve the project's objectives and provide programme resilience by allowing for both modes of transport. A change of contractor for the Railhead Modification would introduce significant safety and integration risk, duplication of work for coordination and additional cost. The Transition Modification has become necessary due to programme changes over time for the Track Systems contract award. The purpose of the Transitio"
                }
            ]
        }
    ],
    "language": "en"
}