    "tag": [
        "compiled"
    ],
    "id": "ocds-h6vhtk-05638d-2025-07-22T10:57:25+01:00",
    "date": "2025-07-22T10:57:25+01:00",
    "ocid": "ocds-h6vhtk-05638d",
    "initiationType": "tender",
    "parties": [
        {
            "id": "GB-PPON-PXLV-9225-PRBN",
            "name": "King's College Hospital NHS Foundation Trust",
            "identifier": {
                "scheme": "GB-PPON",
                "id": "PXLV-9225-PRBN"
            },
            "address": {
                "streetAddress": "KCH Business Park, 129 Coldharbour Lane",
                "locality": "London",
                "postalCode": "SE5 9NY",
                "country": "GB",
                "countryName": "United Kingdom",
                "region": "UKI45"
            },
            "contactPoint": {
                "email": "andre.moreira@nhs.net"
            },
            "roles": [
                "buyer"
            ],
            "details": {
                "url": "https://www.kch.nhs.uk/",
                "classifications": [
                    {
                        "scheme": "UK_CA_TYPE",
                        "id": "publicAuthorityCentralGovernment",
                        "description": "Public authority - central government"
                    }
                ]
            }
        }
    ],
    "buyer": {
        "id": "GB-PPON-PXLV-9225-PRBN",
        "name": "King's College Hospital NHS Foundation Trust"
    },
    "planning": {
        "milestones": [
            {
                "id": "engagement",
                "type": "engagement",
                "description": "The Cheyne Wing Transformer project will deliver critical electrical infrastructure upgrades at Kings College Hospital through the installation of a new 1.5MVA transformer and a 750kVA standby diesel generator. The load demands on these sub stations have been increasing beyond the ideal and where the resilience of the connected services could become compromised in a plant failure scenario. This, combined with a requirement to support proposed additional loads within Bessemer has led to the requirement for a further transformer substation, standalone Diesel generator support and associated new low voltage distribution facility to be created. These additions will support the increased electrical demand driven by more power requirements while alleviating load pressures on existing substations 1A and 1B. Strategically positioned at the southern end of Cheyne Wing, the transformer and generator will integrate into the hospital's existing 11kV Ring B network, with associated low-voltage switchgear housed in a repurposed internal room adjacent to the current distribution boards. The project is designed to enhance resilience, improve maintainability, and provide sufficient capacity for future expansion. The Contracting authority seeks to understand from suppliers in the market whether they have appetite, capability and resource available to bid and deliver the project this Financial year 25/26. Please respond to this notice, with your interest and you will be considered and added to big for this provision via the Atamis Portal. Timeframe for response. With thanks, The Project Team,",
                "dueDate": "2025-07-28T23:59:59+01:00",
                "status": "scheduled"
            }
        ],
        "documents": [
            {
                "id": "041892-2025",
                "documentType": "marketEngagementNotice",
                "noticeType": "UK2",
                "description": "Preliminary market engagement notice on Find a Tender",
                "url": "https://www.find-tender.service.gov.uk/Notice/041892-2025",
                "datePublished": "2025-07-22T10:57:25+01:00",
                "format": "text/html"
            }
        ]
    },
    "tender": {
        "id": "ocds-h6vhtk-05638d",
        "legalBasis": {
            "id": "2023/54",
            "scheme": "UKPGA",
            "uri": "https://www.legislation.gov.uk/ukpga/2023/54/contents"
        },
        "title": "Market Engagement notice for the Provision of Transformer and Generator for King's College Hospital NHS Foundation Trust.",
        "description": "The Cheyne Wing Transformer project will deliver critical electrical infrastructure upgrades at Kings College Hospital through the installation of a new 1.5MVA transformer and a 750kVA standby diesel generator.",
        "items": [
            {
                "id": "1",
                "additionalClassifications": [
                    {
                        "scheme": "CPV",
                        "id": "31127000",
                        "description": "Emergency generator"
                    },
                    {
                        "scheme": "CPV",
                        "id": "51142000",
                        "description": "Installation services of diesel engines"
                    }
                ],
                "relatedLot": "1"
            }
        ],
        "mainProcurementCategory": "goods",
        "lots": [
            {
                "id": "1",
                "contractPeriod": {
                    "startDate": "2025-09-01T00:00:00+01:00",
                    "endDate": "2026-01-01T23:59:59Z"
                },
                "status": "planning"
            }
        ],
        "status": "planning"
    },
    "language": "en"
}