    "tag": [
        "compiled"
    ],
    "id": "ocds-r6ebe6-0000665631-2021-08-31T00:00:00Z",
    "date": "2021-08-31T00:00:00Z",
    "ocid": "ocds-r6ebe6-0000665631",
    "initiationType": "tender",
    "parties": [
        {
            "id": "org-1",
            "name": "Argyll and Bute Council",
            "identifier": {
                "legalName": "Argyll and Bute Council"
            },
            "address": {
                "streetAddress": "Kilmory",
                "locality": "Lochgilphead",
                "region": "UKM",
                "postalCode": "PA31 8RT"
            },
            "contactPoint": {
                "email": "elaine.appleby@argyll-bute.gov.uk",
                "url": "http://"
            },
            "roles": [
                "buyer"
            ],
            "details": {
                "classifications": [
                    {
                        "id": "Regional or local authority",
                        "scheme": "TED_CA_TYPE"
                    },
                    {
                        "id": "01",
                        "description": "General public services",
                        "scheme": "COFOG"
                    }
                ],
                "url": "http://www.argyll-bute.gov.uk"
            }
        }
    ],
    "buyer": {
        "name": "Argyll and Bute Council",
        "id": "org-1"
    },
    "planning": {
        "documents": [
            {
                "id": "AUG425948",
                "documentType": "plannedProcurementNotice",
                "title": "Rothesay Pier Settlement - Phase 2 (Grouting & Piling Works) - Re-tender",
                "description": "Settlement has occurred behind the existing quay wall, specifically to the backfill of the old masonry pier over an approx. length of 120m at Rothesay Pier. The 1st phase of work, completed last year, consisted of the installation of a 5.6m high scour screen along the length to reduce thrust and wave action against the wall and protect and prevent further deterioration of the masonry wall. This contract (Phase 2) aims to address the settlement and prevent sliding failure of the wall by construction of a relieving RC slab supported by piles to the east and west sections, coupled with a grout curtain and mass grout to the central section.",
                "url": "https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=AUG425948",
                "format": "text/html"
            }
        ]
    },
    "tender": {
        "id": "ocds-r6ebe6-0000665631",
        "title": "Rothesay Pier Settlement - Phase 2 (Grouting & Piling Works) - Re-tender",
        "description": "Settlement has occurred behind the existing quay wall, specifically to the backfill of the old masonry pier over an approx. length of 120m at Rothesay Pier. The 1st phase of work, completed last year, consisted of the installation of a 5.6m high scour screen along the length to reduce thrust and wave action against the wall and protect and prevent further deterioration of the masonry wall. This contract (Phase 2) aims to address the settlement and prevent sliding failure of the wall by construction of a relieving RC slab supported by piles to the east and west sections, coupled with a grout curtain and mass grout to the central section.",
        "status": "planned",
        "items": [
            {
                "id": "1",
                "additionalClassifications": [
                    {
                        "id": "44212400",
                        "scheme": "CPV"
                    }
                ],
                "deliveryLocation": {
                    "description": "Rothesay, Isle of Bute"
                },
                "deliveryAddresses": [
                    {
                        "region": "UKM63"
                    }
                ],
                "relatedLot": "1"
            }
        ],
        "mainProcurementCategory": "works",
        "lots": [
            {
                "id": "1",
                "description": "Settlement has occurred behind the existing quay wall, specifically to the backfill of the old masonry pier over an approx. length of 120m at Rothesay Pier. The 1st phase of work, completed last year, consisted of the installation of a 5.6m high scour screen along the length to reduce thrust and wave action against the wall and protect and prevent further deterioration of the masonry wall. This contract (Phase 2) aims to address the settlement and prevent sliding failure of the wall by construction of a relieving RC slab supported by piles to the east and west sections, coupled with a grout curtain and mass grout to the central section.",
                "status": "planned"
            }
        ],
        "communication": {
            "futureNoticeDate": "2021-09-13T00:00:00Z"
        },
        "coveredBy": [
            "GPA"
        ],
        "classification": {
            "id": "45262340",
            "scheme": "CPV"
        }
    },
    "language": "EN",
    "description": "NOTE: To register your interest in this notice and obtain any additional information please visit the Public Contracts Scotland Web Site at https://www.publiccontractsscotland.gov.uk/Search/Search_Switch.aspx?ID=665631. (SC Ref:665631)",
    "links": [
        {
            "rel": "canonical",
            "href": "https://api.publiccontractsscotland.gov.uk/v1/Notice?id=ocds-r6ebe6-0000665631"
        }
    ],
    "noticetype": "PCS Notice - Website Prior Information Notice"
}