title: "Thames Tideway Tunnel - C405 Main Works West - Conveyor System MNTL-B"
ocid: "ocds-b5fd17-047c6396-c302-48d4-a6a1-32a5c15c6676"
canonical_url: "https://d3tenders.com/contract/?ocid=ocds-b5fd17-047c6396-c302-48d4-a6a1-32a5c15c6676"
markdown_url: "https://d3tenders.com/contract/ocds-b5fd17-047c6396-c302-48d4-a6a1-32a5c15c6676.md"
json_url: "https://d3tenders.com/contract/ocds-b5fd17-047c6396-c302-48d4-a6a1-32a5c15c6676.json"
source: "Contracts Finder"
current_stage: "Tender"
buyer: "BIP SOLUTIONS LIMITED"
published: "2021-11-17"
---

# Thames Tideway Tunnel - C405 Main Works West - Conveyor System MNTL-B

Buyer: BIP SOLUTIONS LIMITED  
Current stage: Tender  
OCID: ocds-b5fd17-047c6396-c302-48d4-a6a1-32a5c15c6676

[View canonical contract page](https://d3tenders.com/contract/?ocid=ocds-b5fd17-047c6396-c302-48d4-a6a1-32a5c15c6676)  
[Download OCDS JSON](https://d3tenders.com/contract/ocds-b5fd17-047c6396-c302-48d4-a6a1-32a5c15c6676.json)

## Summary

The Thames Tideway Tunnel project, led by BIP Solutions Limited, aims to manage combined sewer overflows (CSOs) by constructing a new storage and transfer tunnel. This procurement process is currently in the active tender stage, focusing on the installation and maintenance of a conveyor system for spoil transport. The contract period is scheduled from 12 August 2020 to 30 September 2021, located primarily in London. The procurement method is open, allowing all interested parties to submit tenders. The need for this system arises from the extensive works being undertaken across various key locations, including connections to existing infrastructure.

This tender presents significant opportunities for businesses involved in construction and engineering, particularly those specialised in conveyor systems and related technologies. Companies with experience in large-scale infrastructure projects in urban locations and those capable of meeting the technical requirements stipulated in the scope of work will find this contract appealing. The focus on sustainability and efficiency within this project further opens doors for innovative solutions in waste management, making it an attractive prospect for both established firms and SMEs looking to expand their portfolios.

## Notice

The Thames Tideway Tunnel project (the Project) will control CSO discharges by intercepting and diverting combined sewage flows into a new storage and transfer tunnel. The main tunnel will run from Acton Storm Tanks in west London to Abbey Mills Pumping Station in the east, where it will connect to the Lee Tunnel, which will transfer the combined sewage to Beckton Sewage Treatment Works for treatment. The Project extends from Acton Storm Tanks in west London, to Abbey Mills Pumping Station in east London. The Project includes associated works at Beckton STW, Shad Thames Pumping Station and Bekesbourne Street. The geographic layout of the Project and local authorities through which it passes is shown in Figure 1. The Project comprises: a. tunnels: i. a main tunnel which will capture and store combined sewage from CSOs along its route and transfer it to Abbey Mills Pumping Station, from where the Lee Tunnel will transfer it for treatment at Beckton Sewage Treatment Works ii. 11 connection tunnels, which will link flows from CSOs to the main tunnel. b. Worksites: i. five main tunnel Worksites (drive and/or reception sites) ii. 16 CSO Worksites iii. two System modification Worksites Thames Tideway Tunnel iv. works at Beckton Sewage Treatment works. Section 4: Scope of Works BMBJV scope of works on the Tideway project has been increased to include the construction of a connection tunnel between the CARRR shaft and the precast Main Tunnel B constructed by the Central Team. The design of the Connection Tunnel is being undertaken in an expedited manner to mitigate impacts on the overall project programme and scope under the original works that are ongoing. The connection tunnel will be constructed in the following phases: a) 55m 6.1m OD Pilot Tunnel drive. b) 55m 7.5m OD Enlargement Tunnel which includes the removal of the Pilot Tunnel.. BMBJV require a Subcontractor to provide a quotation to install and maintain a conveyor system which will undertake the transport of spoil from the internal shed bin to the external site bin. BMBJV aim to engage a Conveyor Subcontractor based on this ITT and subsequent quotation. The scope of the subcontract will be: A. Installation of sizer for SFRC Shotcrete / SFRC concrete / Grout / Clay and River terrace deposits will also be put through the sizer. B. Installation of chain conveyor (running from sizer inside the shed to conveyor outside the shed). C. Conveyor running approx. 100m to the external bin. D. Conveyor to take spoil from the 100m conveyor into the external muck bin. The Subcontractor shall comply with the requirements set out in the Works Information and BMB procedures. Additional information: BMB JV Sites (CARRR) BMB-JV Tideway West, Carnwath Road Riverside, Carnwath Road, London Borough of Hammersmith & Fulham, SW6 3HR

## Key Details

| Field | Value |
| --- | --- |
| Publication source | Contracts Finder |
| Latest notice | https://www.contractsfinder.service.gov.uk/Notice/adc4756a-10d7-4f47-82b8-4fb3ecbbab84 |
| Notice type | Tender Notice |
| Procurement type | Standard |
| Procurement category | Works |
| Procurement method | Open |
| Procurement method details | Open procedure (above threshold) |
| Tender suitability | Not specified |
| Awardee scale | Not specified |
| All stages | Tender |

## Dates

| Field | Value |
| --- | --- |
| Publication date | 17 Nov 2021 |
| Submission deadline | 22 Jul 2020 |
| Future notice date | Not specified |
| Award date | Not specified |
| Contract period | 11 Aug 2020 - 30 Sep 2021 |
| Recurrence | Not specified |

## Values

| Field | Value |
| --- | --- |
| Tender value | Not specified |
| Lots value | Not specified |
| Awards value | Not specified |
| Contracts value | Not specified |

## Status

| Field | Value |
| --- | --- |
| Tender status | Active |
| Lots status | Not specified |
| Awards status | Not specified |
| Contracts status | Not specified |

## Buyer

| Field | Value |
| --- | --- |
| Main buyer | BIP SOLUTIONS LIMITED |
| Locality | LONDON |
| Post town | South West London |
| Postcode | SW1V 1LQ |
| Country | England |
| ITL 1 | TLI London |
| ITL 2 | TLI3 Inner London - West |
| ITL 3 | TLI35 Westminster and City of London |
| Local authority | Westminster |
| Electoral ward | Pimlico North |
| Westminster constituency | Cities of London and Westminster |
| Delivery location | TLI London |

## CPV Codes

### Divisions

- 34 - Transport equipment and auxiliary products to transportation
- 42 - Industrial machinery

### Codes

- 34312600 - Rubber conveyor belts
- 42417100 - Pneumatic elevators or conveyors
- 42417200 - Conveyors
- 42417230 - Armoured-faced conveyors (AFCS) for mining
- 42417300 - Conveyor equipment
- 42417310 - Conveyor belts

## Release History

- 17 Nov 2021 at 13:42 - Tender - Tender Notice - https://www.contractsfinder.service.gov.uk/Notice/adc4756a-10d7-4f47-82b8-4fb3ecbbab84

## Documents

- https://www.contractsfinder.service.gov.uk/Notice/adc4756a-10d7-4f47-82b8-4fb3ecbbab84
  17th November 2021 - Opportunity notice on Contracts Finder
- https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=49715894
  Please follow this link to view the notice.

## Provenance

This Markdown file is an alternate public rendering of the D3 Tenders contract record. The canonical page is https://d3tenders.com/contract/?ocid=ocds-b5fd17-047c6396-c302-48d4-a6a1-32a5c15c6676. The underlying structured data is available as OCDS JSON at https://d3tenders.com/contract/ocds-b5fd17-047c6396-c302-48d4-a6a1-32a5c15c6676.json.