title: "BBV HS2 MWCC North - Fabrication Drawings and Production of Metal Capping Beams-PB"
ocid: "ocds-b5fd17-3b1495d7-dbb1-4ee0-a5d6-56ce2c668da3"
canonical_url: "https://d3tenders.com/contract/?ocid=ocds-b5fd17-3b1495d7-dbb1-4ee0-a5d6-56ce2c668da3"
markdown_url: "https://d3tenders.com/contract/ocds-b5fd17-3b1495d7-dbb1-4ee0-a5d6-56ce2c668da3.md"
json_url: "https://d3tenders.com/contract/ocds-b5fd17-3b1495d7-dbb1-4ee0-a5d6-56ce2c668da3.json"
source: "Contracts Finder"
current_stage: "Tender"
buyer: "BIP SOLUTIONS LIMITED"
published: "2022-02-16"
---

# BBV HS2 MWCC North - Fabrication Drawings and Production of Metal Capping Beams-PB

Buyer: BIP SOLUTIONS LIMITED  
Current stage: Tender  
OCID: ocds-b5fd17-3b1495d7-dbb1-4ee0-a5d6-56ce2c668da3

[View canonical contract page](https://d3tenders.com/contract/?ocid=ocds-b5fd17-3b1495d7-dbb1-4ee0-a5d6-56ce2c668da3)  
[Download OCDS JSON](https://d3tenders.com/contract/ocds-b5fd17-3b1495d7-dbb1-4ee0-a5d6-56ce2c668da3.json)

## Summary

The procurement process involves Balfour Beatty VINCI (BBV) seeking suppliers for the fabrication drawings and production of metal capping beams for the HS2 main works civils contracts in the West Midlands. This opportunity, titled "BBV HS2 MWCC North - Fabrication Drawings and Production of Metal Capping Beams-PB," is currently in the Tender stage, with a deadline for submissions set for 25th February 2022. The total contract value is £101,000, and the deliverables must be completed by 1st August 2022. The procurement method is a limited competitive quotation due to the project's estimated value being below the threshold.

This tender represents a significant opportunity for businesses, particularly those specialising in steel fabrication and construction, to engage with a prominent joint venture in the infrastructure sector. Companies that can demonstrate verifiable experience, appropriate resources, and the technical ability to meet the project's requirements will be well-suited to compete. As BBV values integrity, leadership, and safety, suppliers who align with these principles and can effectively deliver the necessary goods may enhance their market presence by collaborating on this high-profile project.

## Notice

Balfour Beatty VINCI (BBV) have been awarded HS2 main works civils contracts for the Area North project in the West Midlands. We are looking to engage with the steel fabricators in the supply chain whom provide Fabrication drawings and the ability to manufacture steel capping beams for concreting works. Full details and specifications will be provided to the successfully shortlisted suppliers. Suppliers should be aware of the scale of this project and should assess their internal capabilities to be able to carry out the intended scope of works, prior to completing this expression of interest (EOI). When selecting a supplier BBV look for alignment of values, behaviors and cultures, between ourselves and our supply chain. BBV and HS2 have aligned their values to the following: * Integrity * Leadership * Respect * Safety In order to achieve a successful project outcome we have published a manifesto of our guiding principles, which include: * Making HS2 affordable * Delivering on promises * We build with people in mind * Delivering more than a railway * Achieving more together * Creative and challenging Successfully shortlisted supplier's will be those with verifiable experience, and the appropriate capacity ,resources and technical ability to deliver the scope of works. Supplier's may then be invited to the project, to formally demonstrate their experience and capabilities. As an alternative phone/webinar interviews may be conducted. On selection, shortlisted supplier's will be issued with a formal pre-qualification and/or Invitation to Tender (ITT) to demonstrate their ability to work with these values and behaviors in mind, whilst proving their demonstration of capabilities and competence. BBV is a joint venture between Balfour Beatty Group and VINCI Group. Balfour Beatty VINCI is a long established joint venture between two global leaders in the delivery of critical Infrastructure and Highways Projects, such as the channel tunnel, crossrail, M4/M5/M6 Smart Motorway projects and HS2 main works civil contract for the north. More about BBV: * VINCI is the largest contractor in the world * Balfour Beatty is the largest contractor in the UK * BBV have been working together for the past 30 years, their first project being the channel tunnel. For more information please visit our website www.balfourbeattyvinci.co.uk Please see attached drawing showing cast in items (highlighted orange, blue and green) that require procurement for the Retained Cut Capping Beams. We will require 1no. "set" at each end of the 22no. precast props, therefore 44no. "sets" in total. Shop/fabrication drawing(s) will need to be produced and issued for approval to ensure detailing is correct. We will require all 44no. "sets" delivered to WWH no later than 1st Aug 2022. Additional information: Please see attached drawing showing cast in items (highlighted orange, blue and green) that require procurement for the Retained Cut Capping Beams. We will require 1no. "set" at each end of the 22no. precast props, therefore 44no. "sets" in total. Shop/fabrication drawing(s) will need to be produced and issued for approval to ensure detailing is correct. We will require all 44no. "sets" delivered to WWH no later than 1st Aug 2022.

## Key Details

| Field | Value |
| --- | --- |
| Publication source | Contracts Finder |
| Latest notice | https://www.contractsfinder.service.gov.uk/Notice/2acafa36-16ce-47be-9907-b70642c11108 |
| Notice type | Tender Notice |
| Procurement type | Standard |
| Procurement category | Goods |
| Procurement method | Limited |
| Procurement method details | Competitive quotation (below threshold) |
| Tender suitability | SME |
| Awardee scale | Not specified |
| All stages | Tender |

## Dates

| Field | Value |
| --- | --- |
| Publication date | 16 Feb 2022 |
| Submission deadline | 25 Feb 2022 |
| Future notice date | Not specified |
| Award date | Not specified |
| Contract period | 31 Mar 2022 - 31 Dec 2022 |
| Recurrence | Not specified |

## Values

| Field | Value |
| --- | --- |
| Tender value | £101,000 |
| Lots value | Not specified |
| Awards value | Not specified |
| Contracts value | Not specified |

## Status

| Field | Value |
| --- | --- |
| Tender status | Active |
| Lots status | Not specified |
| Awards status | Not specified |
| Contracts status | Not specified |

## Buyer

| Field | Value |
| --- | --- |
| Main buyer | BIP SOLUTIONS LIMITED |
| Locality | BIRMINGHAM |
| Post town | Birmingham |
| Postcode | B1 2LP |
| Country | England |
| ITL 1 | TLG West Midlands (England) |
| ITL 2 | TLG3 West Midlands |
| ITL 3 | TLG31 Birmingham |
| Local authority | Birmingham |
| Electoral ward | Ladywood |
| Westminster constituency | Birmingham Ladywood |
| Delivery location | TLG West Midlands (England) |

## CPV Codes

### Divisions

- 45 - Construction work

### Codes

- 45200000 - Works for complete or part construction and civil engineering work

## Release History

- 16 Feb 2022 at 13:09 - Tender - Tender Notice - https://www.contractsfinder.service.gov.uk/Notice/2acafa36-16ce-47be-9907-b70642c11108

## Documents

- https://www.contractsfinder.service.gov.uk/Notice/2acafa36-16ce-47be-9907-b70642c11108
  16th February 2022 - Opportunity notice on Contracts Finder
- https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=60571319
  Please follow this link to view the notice.

## Provenance

This Markdown file is an alternate public rendering of the D3 Tenders contract record. The canonical page is https://d3tenders.com/contract/?ocid=ocds-b5fd17-3b1495d7-dbb1-4ee0-a5d6-56ce2c668da3. The underlying structured data is available as OCDS JSON at https://d3tenders.com/contract/ocds-b5fd17-3b1495d7-dbb1-4ee0-a5d6-56ce2c668da3.json.