---
title: "CP2231-22 SW Exeter HIF - A379 Trood Lane Junction and Devon Hotel Roundabout"
ocid: "ocds-b5fd17-42f75141-6eb0-4079-bc19-876d2d56ba9c"
canonical_url: "https://d3tenders.com/contract/?ocid=ocds-b5fd17-42f75141-6eb0-4079-bc19-876d2d56ba9c"
markdown_url: "https://d3tenders.com/contract/ocds-b5fd17-42f75141-6eb0-4079-bc19-876d2d56ba9c.md"
json_url: "https://d3tenders.com/contract/ocds-b5fd17-42f75141-6eb0-4079-bc19-876d2d56ba9c.json"
source: "Contracts Finder"
current_stage: "Award"
buyer: "DEVON COUNTY COUNCIL"
published: "2023-08-08"
---

# CP2231-22 SW Exeter HIF - A379 Trood Lane Junction and Devon Hotel Roundabout

Buyer: DEVON COUNTY COUNCIL  
Current stage: Award  
OCID: ocds-b5fd17-42f75141-6eb0-4079-bc19-876d2d56ba9c

[View canonical contract page](https://d3tenders.com/contract/?ocid=ocds-b5fd17-42f75141-6eb0-4079-bc19-876d2d56ba9c)  
[Download OCDS JSON](https://d3tenders.com/contract/ocds-b5fd17-42f75141-6eb0-4079-bc19-876d2d56ba9c.json)

## Summary

The Devon County Council has awarded a contract for the construction of essential highway infrastructure on the A379 at Trood Lane Junction and Devon Hotel Roundabout in Exeter. The contract, with a total value of £3,256,835.17, was awarded to South West Highways Ltd. The contract period runs from 11th September 2023 to 14th June 2024. The procurement method used was an open procedure, and the tender deadline was 11th April 2023.

This public procurement contract offers opportunities for businesses in the construction, foundation, and surface works for highways and roads sector. Small and medium-sized enterprises (SMEs) are particularly well-suited to compete for this project. Businesses interested in infrastructure development within the Exeter area should consider this tender opportunity as it involves significant construction and civil engineering works for essential transportation-related projects.

## Notice

Construction of essential highway infrastructure on a strategic transport corridor enabling residential development to the South West of Exeter. The works include creation of a new signalised junction, capacity improvements and pedestrian and cyclist facilities on the A379 at Trood Lane and Devon Hotel Roundabout. The works incorporate, embankment widening, reinforced earth slope construction and retaining walls, pavement widening and renewal, new and widened pedestrian and cycle paths, surface water drainage system construction including attenuation and outfall renewal, Civil works and ducting for traffic signals, landscaping and traffic management to facilitate the works. The works in relation to the construction of a new signalised junction at the existing Trood Lane Junction with the A379 include but are not limited to the following: - Widening of the A379 including earthworks widening and construction of reinforced earth slopes. - Resurfacing of the existing A379 throughout the scheme extents. - Construction of a new surface water drainage system to both Trood Lane and the A379 throughout the scheme extents including attenuation and reconstruction of an existing outfall. - Widening and reconstruction of Trood Lane between the A379 and the South West Exeter Development Spine Road, including the creation of new cut slopes and retaining walls. - Construction of traffic Islands, ducting and associated civil works to facilitate the installation of signals to the junction. - Investigation and repair of the existing surface water drainage system plus construction of new surface water drainage gulleys, manholes, pipe runs and outfall. - Bus laybys to both sides of the A379. - A new shared pedestrian / cycle path along Trood Lane and the A379 to provide improved access to the development - Landscaping to verge areas and embankments to reinstate habitat for protected species. The works in relation to the construction of improvements to the Devon Hotel Roundabout to improve the capacity of this junction include but are not limited to the following: - Widening of the northbound A379 approach to the junction to create an additional traffic lane including earthworks widening and construction of a reinforced earth slope. - Pavement resurfacing to the A379, the circulatory carriageway, Dawlish Road and Bad Homburg Way - Modification of the roundabout central island - Construction of traffic Islands, ducting and associated civil works to facilitate the provision of a new signalised pedestrian / cycle crossing of the A379. - Construction of connecting footway / cycleway links to Dawlish Road The Tenderer's tendered total of the Prices must not exceed PS2,900,000 for the A379 Trood Lane Junction and PS650,000 for Devon Hotel Roundabout. The procurement documents are available at: https://www.supplyingthesouthwest.org.uk. Tenders or requests to participate must be submitted electronically via the abovementioned address. Additional information: The procurement documents are available for unrestricted and full direct access, free of charge, at: https://www.supplyingthesouthwest.org.uk. Additional information can be obtained from the abovementioned address. Tenders or requests to participate must be submitted electronically via: https://www.supplyingthesouthwest.org.uk.

## Key Details

| Field | Value |
| --- | --- |
| Publication source | Contracts Finder |
| Latest notice | https://www.contractsfinder.service.gov.uk/Notice/8078486a-f691-4821-9dfe-babe64733134 |
| Notice type | Award Notice |
| Procurement type | Standard |
| Procurement category | Works |
| Procurement method | Open |
| Procurement method details | Open procedure |
| Tender suitability | SME |
| Awardee scale | Large |
| All stages | Tender, Award |

## Dates

| Field | Value |
| --- | --- |
| Publication date | 8 Aug 2023 |
| Submission deadline | 11 Apr 2023 |
| Future notice date | Not specified |
| Award date | 1 Aug 2023 |
| Contract period | 10 Sep 2023 - 14 Jun 2024 |
| Recurrence | Not specified |

## Values

| Field | Value |
| --- | --- |
| Tender value | £3,900,000 |
| Lots value | Not specified |
| Awards value | £3,256,835 |
| Contracts value | Not specified |

## Status

| Field | Value |
| --- | --- |
| Tender status | Complete |
| Lots status | Not specified |
| Awards status | Active |
| Contracts status | Not specified |

## Buyer

| Field | Value |
| --- | --- |
| Main buyer | DEVON COUNTY COUNCIL |
| Locality | EXETER |
| Post town | Exeter |
| Postcode | EX2 4QD |
| Country | England |
| ITL 1 | TLK South West (England) |
| ITL 2 | TLK4 Devon |
| ITL 3 | TLK43 Devon CC |
| Local authority | Exeter |
| Electoral ward | Newtown and St Leonard's |
| Westminster constituency | Exeter |
| Delivery location | TLC North East (England), TLD North West (England), TLF East Midlands (England), TLG West Midlands (England), TLH East (England), TLJ South East (England), TLK South West (England) |

## Supplier

| Field | Value |
| --- | --- |
| Number of suppliers | 1 |
| Supplier names | SOUTH WEST HIGHWAYS |

## CPV Codes

### Divisions

- 45 - Construction work

### Codes

- 45233000 - Construction, foundation and surface works for highways, roads

## Release History

- 8 Aug 2023 at 09:21 - Award - Award Notice - https://www.contractsfinder.service.gov.uk/Notice/8078486a-f691-4821-9dfe-babe64733134
- 27 Feb 2023 at 14:49 - Tender - Tender Notice - https://www.contractsfinder.service.gov.uk/Notice/a3949be5-8f15-44b8-8eac-d5b34c8965fe

## Documents

- https://www.contractsfinder.service.gov.uk/Notice/8078486a-f691-4821-9dfe-babe64733134
  8th August 2023 - Awarded contract notice on Contracts Finder
- https://www.contractsfinder.service.gov.uk/Notice/a3949be5-8f15-44b8-8eac-d5b34c8965fe
  27th February 2023 - Opportunity notice on Contracts Finder

## Notice URLs

- http://www.devon.gov.uk
- https://www.supplyingthesouthwest.org.uk

## Provenance

This Markdown file is an alternate public rendering of the D3 Tenders contract record. The canonical page is https://d3tenders.com/contract/?ocid=ocds-b5fd17-42f75141-6eb0-4079-bc19-876d2d56ba9c. The underlying structured data is available as OCDS JSON at https://d3tenders.com/contract/ocds-b5fd17-42f75141-6eb0-4079-bc19-876d2d56ba9c.json.
