---
title: "BBV HS2 MWCC North - Utilities Diversion (Design, Build, Design & Build)"
ocid: "ocds-b5fd17-7ae534a5-6be1-4b37-b86d-487e6ccb9ddf"
canonical_url: "https://d3tenders.com/contract/?ocid=ocds-b5fd17-7ae534a5-6be1-4b37-b86d-487e6ccb9ddf"
markdown_url: "https://d3tenders.com/contract/ocds-b5fd17-7ae534a5-6be1-4b37-b86d-487e6ccb9ddf.md"
json_url: "https://d3tenders.com/contract/ocds-b5fd17-7ae534a5-6be1-4b37-b86d-487e6ccb9ddf.json"
source: "Contracts Finder"
current_stage: "Tender"
buyer: "BIP SOLUTIONS LIMITED"
published: "2022-02-28"
---

# BBV HS2 MWCC North - Utilities Diversion (Design, Build, Design & Build)

Buyer: BIP SOLUTIONS LIMITED  
Current stage: Tender  
OCID: ocds-b5fd17-7ae534a5-6be1-4b37-b86d-487e6ccb9ddf

[View canonical contract page](https://d3tenders.com/contract/?ocid=ocds-b5fd17-7ae534a5-6be1-4b37-b86d-487e6ccb9ddf)  
[Download OCDS JSON](https://d3tenders.com/contract/ocds-b5fd17-7ae534a5-6be1-4b37-b86d-487e6ccb9ddf.json)

## Summary

Balfour Beatty VINCI (BBV) is currently inviting tenders for the "BBV HS2 MWCC North - Utilities Diversion" project, focusing on the design and construction of utility diversions related to the HS2 main works in the West Midlands. This procurement process is at the Tender stage, with the deadline for expression of interest set for 11 March 2022. The project encompasses various aspects of civil engineering, specifically within the pipeline construction industry, and successful suppliers must demonstrate relevant experience and capacity to handle the project's significant demands. The contract is scheduled to commence on 18 July 2022 and run until 31 December 2025.

This tender presents substantial opportunities for businesses, particularly those specialising in utilities design and construction, as well as civil engineering firms with a proven track record in large-scale infrastructure projects. Companies that align with BBV's values of integrity, leadership, respect, and safety while possessing the necessary technical and operational capabilities will find this an ideal platform to showcase their expertise. Suppliers may be invited to participate in interviews or provide additional evidence of their suitability, making it essential for competitor businesses to prepare thoroughly to meet these criteria.

## Notice

Balfour Beatty VINCI (BBV) have been awarded HS2 main works civils contracts for the Area North project in the West Midlands. We are looking to engage with the Utilities Designer & Construction supply chain whom provide Utilities Design & Construction Diversion works. Full details and specifications will be provided to the successfully shortlisted suppliers. Suppliers should be aware of the scale of this project and should assess their internal capabilities to be able to carry out the intended scope of works, prior to completing this expression of interest (EOI). When selecting a supplier BBV look for alignment of values, behaviors and cultures, between ourselves and our supply chain. BBV and HS2 have aligned their values to the following: * Integrity * Leadership * Respect * Safety In order to achieve a successful project outcome we have published a manifesto of our guiding principles, which include: * Making HS2 affordable * Delivering on promises * We build with people in mind * Delivering more than a railway * Achieving more together * Creative and challenging Successfully shortlisted supplier's will be those with verifiable experience, and the appropriate capacity ,resources and technical ability to deliver the scope of works. Supplier's may then be invited to the project, to formally demonstrate their experience and capabilities. As an alternative phone/webinar interviews may be conducted. On selection, shortlisted supplier's will be issued with a formal pre-qualification and/or Invitation to Tender (ITT) to demonstrate their ability to work with these values and behaviors in mind, whilst proving their demonstration of capabilities and competence. BBV is a joint venture between Balfour Beatty Group and VINCI Group. Balfour Beatty VINCI is a long established joint venture between two global leaders in the delivery of critical Infrastructure and Highways Projects, such as the channel tunnel, crossrail, M4/M5/M6 Smart Motorway projects and HS2 main works civil contract for the north. More about BBV: * VINCI is the largest contractor in the world * Balfour Beatty is the largest contractor in the UK * BBV have been working together for the past 30 years, their first project being the channel tunnel. For more information please visit our website www.balfourbeattyvinci.co.uk

## Key Details

| Field | Value |
| --- | --- |
| Publication source | Contracts Finder |
| Latest notice | https://www.contractsfinder.service.gov.uk/Notice/bff3aafa-8046-4c5a-96db-a6e08f68fcf4 |
| Notice type | Tender Notice |
| Procurement type | Standard |
| Procurement category | Works |
| Procurement method | Not Specified |
| Procurement method details | Other - . |
| Tender suitability | SME |
| Awardee scale | Not specified |
| All stages | Tender |

## Dates

| Field | Value |
| --- | --- |
| Publication date | 28 Feb 2022 |
| Submission deadline | 11 Mar 2022 |
| Future notice date | Not specified |
| Award date | Not specified |
| Contract period | 17 Jul 2022 - 31 Dec 2025 |
| Recurrence | Not specified |

## Values

| Field | Value |
| --- | --- |
| Tender value | £1 |
| Lots value | Not specified |
| Awards value | Not specified |
| Contracts value | Not specified |

## Status

| Field | Value |
| --- | --- |
| Tender status | Active |
| Lots status | Not specified |
| Awards status | Not specified |
| Contracts status | Not specified |

## Buyer

| Field | Value |
| --- | --- |
| Main buyer | BIP SOLUTIONS LIMITED |
| Locality | BIRMINGHAM |
| Post town | Birmingham |
| Postcode | B1 2LP |
| Country | England |
| ITL 1 | TLG West Midlands (England) |
| ITL 2 | TLG3 West Midlands |
| ITL 3 | TLG31 Birmingham |
| Local authority | Birmingham |
| Electoral ward | Ladywood |
| Westminster constituency | Birmingham Ladywood |
| Delivery location | TLG West Midlands (England) |

## CPV Codes

### Divisions

- 44 - Construction structures and materials; auxiliary products to construction (except electric apparatus)
- 45 - Construction work
- 65 - Public utilities
- 71 - Architectural, construction, engineering and inspection services

### Codes

- 44161000 - Pipelines
- 45200000 - Works for complete or part construction and civil engineering work
- 65000000 - Public utilities
- 71320000 - Engineering design services

## Release History

- 28 Feb 2022 at 14:55 - Tender - Tender Notice - https://www.contractsfinder.service.gov.uk/Notice/bff3aafa-8046-4c5a-96db-a6e08f68fcf4

## Documents

- https://www.contractsfinder.service.gov.uk/Notice/bff3aafa-8046-4c5a-96db-a6e08f68fcf4
  28th February 2022 - Opportunity notice on Contracts Finder
- https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=60875445
  Please follow this link to view the notice.

## Provenance

This Markdown file is an alternate public rendering of the D3 Tenders contract record. The canonical page is https://d3tenders.com/contract/?ocid=ocds-b5fd17-7ae534a5-6be1-4b37-b86d-487e6ccb9ddf. The underlying structured data is available as OCDS JSON at https://d3tenders.com/contract/ocds-b5fd17-7ae534a5-6be1-4b37-b86d-487e6ccb9ddf.json.
