---
title: "BBV HS2 MWCC North - Drainage Materials"
ocid: "ocds-b5fd17-a5a4f775-8b98-4231-9782-dbbf7449c5bb"
canonical_url: "https://d3tenders.com/contract/?ocid=ocds-b5fd17-a5a4f775-8b98-4231-9782-dbbf7449c5bb"
markdown_url: "https://d3tenders.com/contract/ocds-b5fd17-a5a4f775-8b98-4231-9782-dbbf7449c5bb.md"
json_url: "https://d3tenders.com/contract/ocds-b5fd17-a5a4f775-8b98-4231-9782-dbbf7449c5bb.json"
source: "Contracts Finder"
current_stage: "Tender"
buyer: "BIP SOLUTIONS LIMITED"
published: "2022-08-04"
---

# BBV HS2 MWCC North - Drainage Materials

Buyer: BIP SOLUTIONS LIMITED  
Current stage: Tender  
OCID: ocds-b5fd17-a5a4f775-8b98-4231-9782-dbbf7449c5bb

[View canonical contract page](https://d3tenders.com/contract/?ocid=ocds-b5fd17-a5a4f775-8b98-4231-9782-dbbf7449c5bb)  
[Download OCDS JSON](https://d3tenders.com/contract/ocds-b5fd17-a5a4f775-8b98-4231-9782-dbbf7449c5bb.json)

## Summary

The procurement process involves Balfour Beatty VINCI (BBV), a joint venture between global leaders Balfour Beatty and VINCI, seeking suppliers for drainage materials as part of their HS2 main works civils contract for the Area North project, located in the West Midlands, United Kingdom. This tender, identified as "BBV HS2 MWCC North - Drainage Materials," is currently in the open tender stage with a deadline for submissions set for 10th August 2022. The contract is valued nominally at £1, with the official contract period commencing on 12th December 2022 and lasting until 31st December 2027. The procurement follows an open procedure, indicating a broad call for bids from interested suppliers.

This tender presents significant opportunities for growth, particularly for SMEs specialising in drainage materials and related equipment, such as drainage pipes, covers, and civil engineering works. Companies with verifiable experience and the necessary technical capabilities to deliver within BBV's guiding principles—emphasising values like integrity, leadership, and safety—are encouraged to apply. Successful bidders will be shortlisted for potential participation, which may involve formal evaluations or interviews to demonstrate their abilities and alignment with BBV's standards.

## Notice

Balfour Beatty VINCI (BBV) have been awarded HS2 main works civils contracts for the Area North project in the West Midlands. We are looking to engage with the Drainage Materials supply chain whom provide Drainage materials (concrete drainage, Culverts & Headwalls, Plastic Drainage, Covers & Frames, Channels, Hydrobrakes, Cascades & Geotextiles). Full details and specifications will be provided to the successfully shortlisted suppliers. Suppliers should be aware of the scale of this project and should assess their internal capabilities to be able to carry out the intended scope of works, prior to completing this expression of interest (EOI). When selecting a supplier BBV look for alignment of values, behaviors and cultures, between ourselves and our supply chain. BBV and HS2 have aligned their values to the following: * Integrity * Leadership * Respect * Safety In order to achieve a successful project outcome we have published a manifesto of our guiding principles, which include: * Making HS2 affordable * Delivering on promises * We build with people in mind * Delivering more than a railway * Achieving more together * Creative and challenging Successfully shortlisted supplier's will be those with verifiable experience, and the appropriate capacity ,resources and technical ability to deliver the scope of works. Supplier's may then be invited to the project, to formally demonstrate their experience and capabilities. As an alternative phone/webinar interviews may be conducted. On selection, shortlisted supplier's will be issued with a formal pre-qualification and/or Invitation to Tender (ITT) to demonstrate their ability to work with these values and behaviors in mind, whilst proving their demonstration of capabilities and competence. BBV is a joint venture between Balfour Beatty Group and VINCI Group. Balfour Beatty VINCI is a long established joint venture between two global leaders in the delivery of critical Infrastructure and Highways Projects, such as the channel tunnel, crossrail, M4/M5/M6 Smart Motorway projects and HS2 main works civil contract for the north. More about BBV: * VINCI is the largest contractor in the world * Balfour Beatty is the largest contractor in the UK * BBV have been working together for the past 30 years, their first project being the channel tunnel. For more information please visit our website www.balfourbeattyvinci.co.uk

## Key Details

| Field | Value |
| --- | --- |
| Publication source | Contracts Finder |
| Latest notice | https://www.contractsfinder.service.gov.uk/Notice/525e40c7-a58a-4d83-a307-ffd115e0fa50 |
| Notice type | Tender Notice |
| Procurement type | Standard |
| Procurement category | Goods |
| Procurement method | Open |
| Procurement method details | Open procedure (above threshold) |
| Tender suitability | SME |
| Awardee scale | Not specified |
| All stages | Tender |

## Dates

| Field | Value |
| --- | --- |
| Publication date | 4 Aug 2022 |
| Submission deadline | 10 Aug 2022 |
| Future notice date | Not specified |
| Award date | Not specified |
| Contract period | 12 Dec 2022 - 31 Dec 2027 |
| Recurrence | Not specified |

## Values

| Field | Value |
| --- | --- |
| Tender value | £1 |
| Lots value | Not specified |
| Awards value | Not specified |
| Contracts value | Not specified |

## Status

| Field | Value |
| --- | --- |
| Tender status | Active |
| Lots status | Not specified |
| Awards status | Not specified |
| Contracts status | Not specified |

## Buyer

| Field | Value |
| --- | --- |
| Main buyer | BIP SOLUTIONS LIMITED |
| Locality | BIRMINGHAM |
| Post town | Birmingham |
| Postcode | B1 2LP |
| Country | England |
| ITL 1 | TLG West Midlands (England) |
| ITL 2 | TLG3 West Midlands |
| ITL 3 | TLG31 Birmingham |
| Local authority | Birmingham |
| Electoral ward | Ladywood |
| Westminster constituency | Birmingham Ladywood |
| Delivery location | TLG West Midlands (England) |

## CPV Codes

### Divisions

- 33 - Medical equipments, pharmaceuticals and personal care products
- 43 - Machinery for mining, quarrying, construction equipment
- 44 - Construction structures and materials; auxiliary products to construction (except electric apparatus)
- 45 - Construction work

### Codes

- 33141600 - Collector and collection bags, drainage and kits
- 43324000 - Drainage equipment
- 44115100 - Ducting
- 44163110 - Drainage pipes
- 44163112 - Drainage system
- 45200000 - Works for complete or part construction and civil engineering work

## Release History

- 4 Aug 2022 at 09:55 - Tender - Tender Notice - https://www.contractsfinder.service.gov.uk/Notice/525e40c7-a58a-4d83-a307-ffd115e0fa50

## Documents

- https://www.contractsfinder.service.gov.uk/Notice/525e40c7-a58a-4d83-a307-ffd115e0fa50
  4th August 2022 - Opportunity notice on Contracts Finder
- https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=63906633
  Please follow this link to view the notice.

## Provenance

This Markdown file is an alternate public rendering of the D3 Tenders contract record. The canonical page is https://d3tenders.com/contract/?ocid=ocds-b5fd17-a5a4f775-8b98-4231-9782-dbbf7449c5bb. The underlying structured data is available as OCDS JSON at https://d3tenders.com/contract/ocds-b5fd17-a5a4f775-8b98-4231-9782-dbbf7449c5bb.json.
