title: "PURCON2023 Campus Development Programme Phase 1 - AWARD"
ocid: "ocds-b5fd17-cc7e59e7-88f4-4876-a055-67fc1a215e87"
canonical_url: "https://d3tenders.com/contract/?ocid=ocds-b5fd17-cc7e59e7-88f4-4876-a055-67fc1a215e87"
markdown_url: "https://d3tenders.com/contract/ocds-b5fd17-cc7e59e7-88f4-4876-a055-67fc1a215e87.md"
json_url: "https://d3tenders.com/contract/ocds-b5fd17-cc7e59e7-88f4-4876-a055-67fc1a215e87.json"
source: "Contracts Finder"
current_stage: "Award"
buyer: "UNIVERSITY OF EAST ANGLIA"
published: "2024-08-02"
---

# PURCON2023 Campus Development Programme Phase 1 - AWARD

Buyer: UNIVERSITY OF EAST ANGLIA  
Current stage: Award  
OCID: ocds-b5fd17-cc7e59e7-88f4-4876-a055-67fc1a215e87

[View canonical contract page](https://d3tenders.com/contract/?ocid=ocds-b5fd17-cc7e59e7-88f4-4876-a055-67fc1a215e87)  
[Download OCDS JSON](https://d3tenders.com/contract/ocds-b5fd17-cc7e59e7-88f4-4876-a055-67fc1a215e87.json)

## Summary

The University of East Anglia (UEA) is undertaking a significant campus redevelopment project titled "PURCON2023 Campus Development Programme Phase 1". The project falls under the construction industry and is situated in Norwich, United Kingdom, within the East of England region. The procurement stage is at the award phase, with the winning contractor being Mace. The contract period starts on 25th July 2024 and ends on 14th January 2027. The tender involves major refurbishment works on the Grade II listed Lasdun Wall to deliver modern science facilities and teaching spaces, with a budget of £87,983,160.82. Key project elements include enabling works, asbestos removal, extending an elevation by approximately 2,966m², window replacement, façade treatment, and fitting out of around 11,287m² of space.

This tender offers considerable opportunities for businesses in the construction and refurbishment sectors, especially those specialising in heritage building restoration, asbestos abatement, and complex project management. Mid to large-scale construction companies with experience in delivering high-profile refurbishments and working within the context of listed buildings will find this project particularly suitable. The extensive works and the premium placed on sustainability and modernisation provide ample scope for demonstrating innovation and technical excellence, potentially leading to further collaborative projects with educational institutions aiming for net-zero targets.

## Notice

The University of East Anglia was created during the 1960s. Its original campus buildings were designed by the acclaimed architect Sir Denys Lasdun and several of the original buildings are now Grade II Listed, including the original teaching and science building the Lasdun Wall. The Grade II listed Lasdun Wall is an iconic and important part of University of East Anglia's (UEA) history situated in the centre of the UEA's vibrant and busy 24/7 campus. However, the building needs repair and refurbishment to address condition issues and to deliver essential sustainability improvements to enable the University to meet their target to be a net zero campus by 2045. The Lasdun Wall comprises four buildings constructed to appear as one (Building 3, Building 4, Building 5 and Building 6). The University plans to carry out a four-phase strip-back-to-frame refurbishment of the Lasdun Wall. This project - Lasdun Wall Refurbishment Phase 1 - will deliver new modern science facilities and teaching space in an extended Building 3, whilst existing science research facilities continue to operate within Buildings 4, 5 and 6. The existing science facilities are currently at risk due to potential condition failures of the buildings, therefore the success of Phase 1 to 'de-risk' highly specialised facilities within the Lasdun wall, is of extreme importance to the University. The University's Phase 1 project consists of three elements Preliminary enabling works (by others) The Main Works (the subject of this procurement) A package of interphase enabling works which will complete Phase 1 and prepare for the future decommissioning of Buildings The appointed Main Contractor will be required to undertake the following: Initial phase of strip out and asbestos removal will have been undertaken to provide an empty shell, however asbestos removal will be required by the main contractor as follows: Facades - Around existing windows which will be replaced, and concrete facade panels removed to accommodate the new extension. Existing floor screed abutting the perimeter which includes asbestos contamination around existing fixings to the retained listed concrete facade panels - fixings and all remaining screeds will need to be removed. Within the tender design information, we have included the Asbestos survey report to support with the remaining asbestos removal, sequencing and overall methodology. All Asbestos must be removed. Extension - An extension of approx. 2,966m2 is planned to one elevation. Window Replacement and Facade Treatment - The building is listed and the facades are a sensitive architectural feature which will need to be carefully replaced with modern windows in similar style. Fitting Out of existing building - The re-fit comprises circa 11,287m2 of space split to include science research facilities and teaching and social learning space. External Works as detailed in the ISIT design i...

## Key Details

| Field | Value |
| --- | --- |
| Publication source | Contracts Finder |
| Latest notice | https://www.contractsfinder.service.gov.uk/Notice/8be4fe34-7ea5-421d-9596-79028ba1a7bd |
| Notice type | Award Notice |
| Procurement type | Standard |
| Procurement category | Works |
| Procurement method | Not Specified |
| Procurement method details | Other - |
| Tender suitability | Not specified |
| Awardee scale | Not specified |
| All stages | Award |

## Dates

| Field | Value |
| --- | --- |
| Publication date | 2 Aug 2024 |
| Submission deadline | 6 Dec 2023 |
| Future notice date | Not specified |
| Award date | 23 Jul 2024 |
| Contract period | 23 Jul 2024 - 14 Jan 2027 |
| Recurrence | Not specified |

## Values

| Field | Value |
| --- | --- |
| Tender value | Not specified |
| Lots value | Not specified |
| Awards value | £87,983,160 |
| Contracts value | Not specified |

## Status

| Field | Value |
| --- | --- |
| Tender status | Complete |
| Lots status | Not specified |
| Awards status | Active |
| Contracts status | Not specified |

## Buyer

| Field | Value |
| --- | --- |
| Main buyer | UNIVERSITY OF EAST ANGLIA |
| Locality | NORWICH |
| Post town | Norwich |
| Postcode | NR4 7TJ |
| Country | England |
| ITL 1 | TLH East (England) |
| ITL 2 | TLH5 Norfolk |
| ITL 3 | TLH51 Norwich and East Norfolk |
| Local authority | Norwich |
| Electoral ward | University |
| Westminster constituency | Norwich South |
| Delivery location | Not specified |

## Supplier

| Field | Value |
| --- | --- |
| Number of suppliers | 1 |
| Supplier names | MACE |

## CPV Codes

### Divisions

- 45 - Construction work

### Codes

- 45000000 - Construction work

## Release History

- 2 Aug 2024 at 08:46 - AwardUpdate - Award Notice - https://www.contractsfinder.service.gov.uk/Notice/8be4fe34-7ea5-421d-9596-79028ba1a7bd
- 2 Aug 2024 at 08:45 - Award - Award Notice - https://www.contractsfinder.service.gov.uk/Notice/8be4fe34-7ea5-421d-9596-79028ba1a7bd

## Documents

- https://www.contractsfinder.service.gov.uk/Notice/8be4fe34-7ea5-421d-9596-79028ba1a7bd
  2nd August 2024 - Awarded contract notice on Contracts Finder

## Provenance

This Markdown file is an alternate public rendering of the D3 Tenders contract record. The canonical page is https://d3tenders.com/contract/?ocid=ocds-b5fd17-cc7e59e7-88f4-4876-a055-67fc1a215e87. The underlying structured data is available as OCDS JSON at https://d3tenders.com/contract/ocds-b5fd17-cc7e59e7-88f4-4876-a055-67fc1a215e87.json.