title: "Contract for the Maintenance of BIFoR Systems to the University of Birmingham"
ocid: "ocds-h6vhtk-02b528"
canonical_url: "https://d3tenders.com/contract/?ocid=ocds-h6vhtk-02b528"
markdown_url: "https://d3tenders.com/contract/ocds-h6vhtk-02b528.md"
json_url: "https://d3tenders.com/contract/ocds-h6vhtk-02b528.json"
source: "Find A Tender Service"
current_stage: "Award"
buyer: "UNIVERSITY OF BIRMINGHAM"
published: "2021-05-26"
---

# Contract for the Maintenance of BIFoR Systems to the University of Birmingham

Buyer: UNIVERSITY OF BIRMINGHAM  
Current stage: Award  
OCID: ocds-h6vhtk-02b528

[View canonical contract page](https://d3tenders.com/contract/?ocid=ocds-h6vhtk-02b528)  
[Download OCDS JSON](https://d3tenders.com/contract/ocds-h6vhtk-02b528.json)

## Summary

The University of Birmingham has completed a contract titled "Contract for the Maintenance of BIFoR Systems," specifically related to fuel-gas systems, located in Birmingham, UK. This procurement process was initiated as a tender and has reached the award stage, with the contract officially signed on 19 May 2021, for a total value of £172,710 GBP. The maintenance contract, which ensures statutory and reactive upkeep of the CO2 storage and distribution system, spans five years.

This tender presents a significant opportunity for businesses engaged in maintenance, engineering, and technical services, particularly those specialising in gas storage and distribution systems. Given the unique technical requirements of the Birmingham Institute of Forest Research (BIFoR) facility, firms with expertise in bespoke infrastructure for bulk gas applications would be particularly well-positioned to compete. However, due to the established relationship with the current supplier, Stardelta Power and Control, new entrants may face challenges unless they can demonstrate superior capability and reliability in this specialised field.

## Notice

The works consist of statutory and reactive maintenance of a liquid and gas CO2 storage and distribution system owned by the University of Birmingham, over a period of five years.

### Lot Information

Lot 1

The Birmingham Institute of Forest Research's (BIFoR) Free Air Carbon dioxide Enrichment (FACE) experiment in Staffordshire, UK is designed to provide the scientific community with a new understanding of how mature oak woodlands will respond to a future climate with higher levels of carbon dioxide (CO2) in the atmosphere than exist at present. The experiment will expose large areas of woodland to elevated atmospheric CO2 at around 550 parts per million (ppm), which is the level we expect to reach by 2050. The experiment consists of six arrays of towers within a woodland, each 30 m across, which extend from the ground to the top of the trees. CO2 will be released within three of these rings, while the other three will act as control plots and receive ambient air only. Carbon dioxide is be stored in 3 x 40,000kg capacity Storage Vessels under pressure as a liquid. The liquid CO2 is converted to a gas using ambient heat vaporisers and transported in pipes through the woodland to the experimental arrays. Here, it is diluted with normal air until the level reaches ~550 ppm before being released into the research space. Sensors within the array are used by a computer to automatically adjust the amount and direction of released CO2 according to the speed and direction of the wind. The University of Birmingham intends to award a contract for up to five years for the maintenance and calibration of the CO2 storage and delivery system at the facility. The works consist of statutory and reactive maintenance and the entire system is owned and managed by the University of Birmingham. A scheme of works has been developed that covers maintenance, calibration and statutory compliance over a five year period. Stardelta Power and Control are considered to be the preferred supplier after providing these services for the previous five year period. The FACE experimental set up is bespoke in nature and unusual in the industrial market as the University owns the infrastructure. The normal mode of operation is to rent/hire such gas storage and distribution systems. The owner of the gas storage and delivery infrastructure would then in turn manage the maintenance, calibration and statutory compliance requirements. These arrangements are normally internal. For this reason it previously proved very difficult to identify companies with the requisite skills and resources to tender for the University owned BIFoR FACE facility. The University has identified that for reasons of timescale and to achieve its aims within available staff capacity and alongside its core business activities, the products supplied by Stardelta Power and Control are the only ones capable of meeting the University's requirements and this is the only viable option for the University at this time.

### Procurement Information

The University of Birmingham has made a considerable financial investment in procuring and installing the CO2 storage and distribution system at the Birmingham Institute of Forest Research (BIFoR) Free Air Carbon Dioxide Enrichment (FACE) facility. The equipment installed is standard equipment used across the commercial CO2 sector. However, the actual ownership of such equipment is unusual in the UK market especially for the industrial application of bulk gases by the user. The more common agreement is that the bulk gas supplier, in this case liquid CO2, also rents the storage vessels and distribution system to the client. The supplier then covers the maintenance, repairs and calibrations under the rental agreement. Due to the Universities unusual situation, very few companies with the requisite skills and technical capability are available to undertake such a contract as that on offer. The University has an established relationship with Stardelta Power and Control who currently conduct the maintenance and calibration schedule of works while also providing a 24 hour repair service for ad hoc requirements. This supplier has proven to be reliable, efficient and cost effective. Further, Stardelta Power and Control are fully aware and respectful of the site requirements. The BIFoR FACE facility is situated within a woodland that is designed to mimic a non-intervention site and is considered pristine. It would be considered an unnecessary risk to introduce a new supplier at this stage of the experiment (half way through a decadal plan) to conduct heavy engineering works and invasive practices, especially considering the existing human resources available to supervise such activities. The University has identified that for reasons of timescale and to achieve its aims within available staff capacity and alongside its core business activities, the products supplied by Stardelta Power and Control are the only ones capable of meeting the University's requirements and this is the only viable option for the University at this time.

## Key Details

| Field | Value |
| --- | --- |
| Publication source | Find A Tender Service |
| Latest notice | https://www.find-tender.service.gov.uk/Notice/011702-2021 |
| Notice type | Award Notice |
| Procurement type | Standard |
| Procurement category | Goods |
| Procurement method | Limited |
| Procurement method details | Negotiated without publication of a contract notice |
| Tender suitability | Not specified |
| Awardee scale | SME |
| All stages | Award |

## Dates

| Field | Value |
| --- | --- |
| Publication date | 26 May 2021 |
| Submission deadline | Not specified |
| Future notice date | Not specified |
| Award date | 18 May 2021 |
| Contract period | Not specified |
| Recurrence | Not specified |

## Values

| Field | Value |
| --- | --- |
| Tender value | Not specified |
| Lots value | Not specified |
| Awards value | Not specified |
| Contracts value | £172,710 |

## Status

| Field | Value |
| --- | --- |
| Tender status | Complete |
| Lots status | Not specified |
| Awards status | Active |
| Contracts status | Active |

## Buyer

| Field | Value |
| --- | --- |
| Main buyer | UNIVERSITY OF BIRMINGHAM |
| Locality | BIRMINGHAM |
| Post town | Birmingham |
| Postcode | B15 2TT |
| Country | England |
| ITL 1 | TLG West Midlands (England) |
| ITL 2 | TLG3 West Midlands |
| ITL 3 | TLG31 Birmingham |
| Local authority | Birmingham |
| Electoral ward | Edgbaston |
| Westminster constituency | Birmingham Edgbaston |
| Delivery location | TLG West Midlands (England) |

## Supplier

| Field | Value |
| --- | --- |
| Number of suppliers | 1 |
| Supplier names | STARDELTA POWER & CONTROL |

## CPV Codes

### Divisions

- 42 - Industrial machinery

### Codes

- 42113390 - Fuel-gas systems

## Release History

- 26 May 2021 at 10:45 - Award - Award Notice - https://www.find-tender.service.gov.uk/Notice/011702-2021

## Notice URLs

- https://www.birmingham.ac.uk/index.aspx

## Provenance