---
title: "National Framework for Civils and Infrastructure"
ocid: "ocds-h6vhtk-02bb5e"
canonical_url: "https://d3tenders.com/contract/?ocid=ocds-h6vhtk-02bb5e"
markdown_url: "https://d3tenders.com/contract/ocds-h6vhtk-02bb5e.md"
json_url: "https://d3tenders.com/contract/ocds-h6vhtk-02bb5e.json"
source: "Find A Tender Service"
current_stage: "Award"
buyer: "QE FACILITIES LIMITED"
published: "2022-07-03"
---

# National Framework for Civils and Infrastructure

Buyer: QE FACILITIES LIMITED  
Current stage: Award  
OCID: ocds-h6vhtk-02bb5e

[View canonical contract page](https://d3tenders.com/contract/?ocid=ocds-h6vhtk-02bb5e)  
[Download OCDS JSON](https://d3tenders.com/contract/ocds-h6vhtk-02bb5e.json)

## Summary

The public procurement process initiated by QE Facilities Limited focuses on establishing a National Framework for Civils and Infrastructure, which is crucial for delivering various civil engineering projects in the UK. The procurement is classified under 'Works' and encompasses different lots based on project value, with an overall value of £1.56 billion. This tender is currently in the active planning stage and has an anticipated contract duration of four years from November 2021. Interested parties must express their interest via the In-Tend portal by 20th October 2021, when bids will be officially opened. The framework is aimed at diverse public sector bodies including local authorities and the NHS, and encompasses a variety of project types such as road, rail, and water transport infrastructure.

This tender creates significant growth opportunities for construction and civil engineering firms, particularly those with capabilities in large-scale infrastructure projects. Companies specialising in areas such as roadworks, railways, energy production, and telecommunications infrastructure would be well-suited to compete for contracts under this framework, as it allows for both direct awards and competitive bidding. With a maximum of nine contractors selected per lot in each region, competitive, innovative, and reliable suppliers can position themselves effectively to win valuable contracts and expand their market share within the public sector.

## Notice

Added Value Portal t/a Pagabo and acting on behalf of QE Facilities Limited, has established a framework of contractors capable of delivering Civil and Infrastructure schemes within the UK for the whole of the Public Sector. The framework covers, all types Civil and Infrastructure schemes. The term of this framework agreement will be for a period of 4 years from May 2022. The framework shall have the facility for Clients to Direct Award and Further Compete their requirement. The procurement involved a single stage process following a Public Contract Regulations 2015 Open Procedure. The framework is split in to 4 lots based on value and then in to 10 geographical regions and then in a further 9 Project Types. each Sub-Lot which will operate with a maximum of 9 contractors 9 per region. This framework agreement has advertised and tendered, so it can be utilised by all Contracting Authorities as defined in PCR2015, including Charities in the UK.

### Lot Information

PS500,000 to PS5,000,000

Provision of Civils and Infrastructure works projects between PS500,000 and PS5,000,000 in value. Added Value Portal t/a Pagabo and acting on behalf of QE Facilities Limited, has established a framework of contractors capable of delivering Civil and Infrastructure schemes within the UK for the whole of the Public Sector. The framework covers, all types Civil and Infrastructure schemes, including but not limited to; road, rail, water and air transport infrastructure, energy production infrastructure, water supply infrastructure and telecoms infrastructure. It is proposed that the term of this framework agreement will be for a period of 4 years from May 2022. The framework has the facility for Clients to Direct Award and Further Compete their requirement. The procurement involved a single stage process following a Public Contract Regulations 2015 Open Procedure. The framework is split in to 4 value bands, each value band is then split in to 10 geographical regions, and each region is split in to a further 9 Project Types giving 360 Sub-Lots and each Sub-Lot will operate with a maximum of 9 contractors . This framework agreement has been advertised and tendered, so it can be utilised by all Contracting Authorities as defined in PCR2015, including Charities in the UK (the full list is available in the tender synopsis on the In-Tend portal -- https://in-tendhost.co.uk/pagabo).

PS5,000,001 to PS15,000,000

For the provision of Civil and Infrastructure works projects of value between PS5,000,001 and PS15,000,000 in value. Added Value Portal t/a Pagabo and acting on behalf of QE Facilities Limited, has established a framework of contractors capable of delivering Civil and Infrastructure schemes within the UK for the whole of the Public Sector. The framework covers, all types Civil and Infrastructure schemes, including but not limited to; road, rail, water and air transport infrastructure, energy production infrastructure, water supply infrastructure and telecoms infrastructure. It is proposed that the term of this framework agreement will be for a period of 4 years from May 2022. The framework has the facility for Clients to Direct Award and Further Compete their requirement. The procurement involved a single stage process following a Public Contract Regulations 2015 Open Procedure. The framework is split in to 4 value bands, each value band is then split in to 10 geographical regions, and each region is split in to a further 9 Project Types giving 360 Sub-Lots and each Sub-Lot will operate with a maximum of 9 contractors . This framework agreement has been advertised and tendered, so it can be utilised by all Contracting Authorities as defined in PCR2015, including Charities in the UK (the full list is available in the tender synopsis on the In-Tend portal -- https://in-tendhost.co.uk/pagabo).

PS15,000,001 to PS30,000,000

For the provision of Civils and Infrastructure works projects with a values between PS15,000,001 and PS30,000,000 in value. Added Value Portal t/a Pagabo and acting on behalf of QE Facilities Limited, has established a framework of contractors capable of delivering Civil and Infrastructure schemes within the UK for the whole of the Public Sector. The framework covers, all types Civil and Infrastructure schemes, including but not limited to; road, rail, water and air transport infrastructure, energy production infrastructure, water supply infrastructure and telecoms infrastructure. It is proposed that the term of this framework agreement will be for a period of 4 years from May 2022. The framework has the facility for Clients to Direct Award and Further Compete their requirement. The procurement involved a single stage process following a Public Contract Regulations 2015 Open Procedure. The framework is split in to 4 value bands, each value band is then split in to 10 geographical regions, and each region is split in to a further 9 Project Types giving 360 Sub-Lots and each Sub-Lot will operate with a maximum of 9 contractors . This framework agreement has been advertised and tendered, so it can be utilised by all Contracting Authorities as defined in PCR2015, including Charities in the UK (the full list is available in the tender synopsis on the In-Tend portal -- https://in-tendhost.co.uk/pagabo).

Above PS30,000,000

For the provision of Civils and Infrastructure works projects greater than PS30,000,000 in value. Added Value Portal t/a Pagabo and acting on behalf of QE Facilities Limited, has established a framework of contractors capable of delivering Civil and Infrastructure schemes within the UK for the whole of the Public Sector. The framework covers, all types Civil and Infrastructure schemes, including but not limited to; road, rail, water and air transport infrastructure, energy production infrastructure, water supply infrastructure and telecoms infrastructure. It is proposed that the term of this framework agreement will be for a period of 4 years from May 2022. The framework has the facility for Clients to Direct Award and Further Compete their requirement. The procurement involved a single stage process following a Public Contract Regulations 2015 Open Procedure. The framework is split in to 4 value bands, each value band is then split in to 10 geographical regions, and each region is split in to a further 9 Project Types giving 360 Sub-Lots and each Sub-Lot will operate with a maximum of 9 contractors . This framework agreement has been advertised and tendered, so it can be utilised by all Contracting Authorities as defined in PCR2015, including Charities in the UK (the full list is available in the tender synopsis on the In-Tend portal -- https://in-tendhost.co.uk/pagabo).

PS30m and over

Added Value Portal t/a Pagabo and acting on behalf of QE Facilities Limited, wishes to establish a framework of contractors capable of delivering Civil and Infrastructure schemes within the UK for the whole of the Public Sector. It is anticipated that this lot will cover, all types of Public Sector Civil and Infrastructure schemes greater than PS30,000,000 in value

## Key Details

| Field | Value |
| --- | --- |
| Publication source | Find A Tender Service |
| Latest notice | https://www.find-tender.service.gov.uk/Notice/018086-2022 |
| Notice type | Planning Notice |
| Procurement type | Framework |
| Procurement category | Works |
| Procurement method | Open |
| Procurement method details | Open procedure |
| Tender suitability | Not specified |
| Awardee scale | Large, SME |
| All stages | Planning, Tender, Award |

## Dates

| Field | Value |
| --- | --- |
| Publication date | 3 Jul 2022 |
| Submission deadline | 20 Oct 2021 |
| Future notice date | 14 Jul 2021 |
| Award date | 31 May 2022 |
| Contract period | Not specified |
| Recurrence | Not specified |

## Values

| Field | Value |
| --- | --- |
| Tender value | £1,560,000,000 |
| Lots value | £1,560,000,000 |
| Awards value | Not specified |
| Contracts value | £1,560,000,000 |

## Status

| Field | Value |
| --- | --- |
| Tender status | Complete |
| Lots status | Cancelled, Planned |
| Awards status | Active |
| Contracts status | Active |

## Buyer

| Field | Value |
| --- | --- |
| Main buyer | QE FACILITIES LIMITED |
| Locality | GATESHEAD |
| Post town | Newcastle upon Tyne |
| Postcode | NE9 6SX |
| Country | England |
| ITL 1 | TLC North East (England) |
| ITL 2 | TLC4 Northumberland, Durham and Tyne & Wear |
| ITL 3 | TLC43 Tyneside |
| Local authority | Gateshead |
| Electoral ward | High Fell |
| Westminster constituency | Gateshead Central and Whickham |
| Delivery location | Not specified |

## Supplier

| Field | Value |
| --- | --- |
| Number of suppliers | 104 |
| Supplier names | ACS CIVILS LIMITED R2: 1C 3C, R3: 1C 3C, R7: 1C 3C; ALUN GRIFFITHS (CONTRACTORS) LIMITED R4: 1R 2R 3R 6C 7R 8C, R5: 1R 2R 3R 6C 7R 8C; ALUN GRIFFITHS (CONTRACTORS) LIMITED R4: 1R, R5: 1C; ALUN GRIFFITHS (CONTRACTORS) LIMITED R4: 3R 6C 8C, R5: 1R 2R 3R 6C 8C; ALUN GRIFFITHS (CONTRACTORS) LIMITED R5: 1R 2R; AMALGAMATED CONSTRUCTION LIMITED R1A: 1C 2C 3C 4C 5C 6C 7C 9C, R1B: 1C 2C 3C 4C 5C 6C 7C 9C, R1C: 1C 2C 3C 4C 5C 6C 7C 9C, R1D: 1C 2C 3C 4C 5C 6C 7C 9C, R2: 2R 4R 5C 6C 7C 9C, R3: 2R 3R 4C 5C 6C 7C 9C, R4: 1C 2C 3C 4C 5C 6C 7C 9C, R5: 1C 2C 3C 4C 5C 6C 7C 9C, R6: 1C 2C 3C 4C 5C 6C 7C 9C; AMALGAMATED CONSTRUCTION LIMITED R1A: 1C 2C 3C 5C 9C, R1B: 1C 2C 3C 5C 9C, R1C: 1C 2C 3C 5C 9C, R1D: 1C 2C 3C 5C 9C, R2: 3R 5C 9C, R3: 3R 5C 9C, R4: 2R 3C 5C 9C, R5: 1C 2C 3C 5C 9C, R6: 3C 5C 9C; ASSOCIATED ASPHALT CONTRACTING LIMITED R3: 8R, R4: 8R, R6: 8C; BETHELL CONSTRUCTION LIMITED R2: 6R 8R, R3: 6R 8C; BRITANNIA CONSTRUCTION LIMITED R3: 9C, R4: 4C 6C 9C; BUCKINGHAM GROUP CONTRACTING LIMITED - BUCKINGHAM R2: 1C 2C, R3: 1C 2C, R6: 1C 2C; C SPENCER LIMITED R1A: 1C 2C 3C 5C 7C, R1B: 1C 2C 3C 5C 7C, R1C: 1C 2C 3C 5C 7C, R2: 3R 5C 7R, R3: 3R 5C 7R, R4: 2R 3C 5C 7C, R5: 1C 2R 3C 5C 7C, R6: 3R 5C 7C; C SPENCER LIMITED R1A: 1C 2C 3C 5C 7C, R1B: 1C 2C 3C 5C 7C, R1C: 1C 2C 3C 5C 7C, R2: 5C 7R, R3: 5C 7R, R4: 1R 2R 3R 5C 7C, R5: 1R 2R 3R 5C 7R, R6: 1R 2R 3R 5C 7C; C SPENCER LIMITED R1A: 1C 2C 3C 5C 7C, R1B: 1C 2C 3C 5C 7C, R1C: 1C 2C 3C 5C 7C, R2: 5C 7R, R3: 5C 7R, R4: 2R 3R 5C 7C, R5: 1C 2C 3R 5C 7C, R6: 3R 5C 7C; CLANCY DOCWRA LIMITED R1A: 4C 6C 7C, R1B: 4C 6C 7C; CLANCY DOCWRA LIMITED R2: 4R 6R 7R, R3: 4R 6R 7R, R6: 4R 6C 7R; CLANCY DOCWRA LIMITED R2: 4R, R3: 4R, R6: 4R; CLANCY DOCWRA LIMITED R6: 4C; COLAS LIMITED R2: 1C 2C 3C 8C, R3: 1R 2C 3C 8C, R4: 1C 2C 3C 8C, R5: 1C 2C 3C 8C, R6: 1C 2C 3C 8C, R7: 1C 2C 3C 8C; COLAS LIMITED R2: 1C 2C, R3: 1R 2C, R4: 1C 2C, R5: 1C 2C, R6: 1R 2C, R7: 1C 2C; COLAS LIMITED R2: 1R 2C 8C, R3: 1R 2C 8C, R4: 1R 2C 8C, R5: 1C 2C 8C, R6: 1R 2C 8C, R7: 1C 2C 8C; CR REYNOLDS LIMITED R2: 1C, R3: 1C; DANAHER & WALSH (CIVIL ENGINEERING) LIMITED R3: 4R 6C 7R, R6: 1R 2R 3R 4C 6C 7R; DAWSON-WAM LIMITED R1A: 3C, R1B: 3C, R1C: 3C, R1D: 3C, R7: 3C 6C; ERIC WRIGHT CIVIL ENGINEERING LIMITED R2: 1C 2C 3C, R3: 1C 2C 3C, R5: 1C 2C 3C; ESH CONSTRUCTION LIMITED R2: 1R; ESH CONSTRUCTION LIMITED R2: 1R 2C 3R 4C 6C 7C 8C 9C; ESH CONSTRUCTION LIMITED R2: 3C 4C 6C 7C; FOX BUILDING AND ENGINEERING LIMITED R2: 2R 4R 6C 7R 9C, R3: 2R 4R 6C 7C 9C, R4: 1R 2R 3R 4C 6C 7C 9C, R5: 1C 2C 3R 4C 6C 7C 9C, R6: 1R 2R 3C 4C 6C 7C 9C, R7: 1C 2C 3C 4C 6C 7C 9C; FOX BUILDING AND ENGINEERING LIMITED R2: 3R 4R 6R 9C, R3: 3R 4C 6C 9C, R4: 3R 4C 6C 9C, R5: 1C 3C 4C 6C 9C, R6: 3R 4C 6C 9C, R7: 1C 3C 4C 6C 9C; FOX BUILDING AND ENGINEERING LIMITED R5: 1C, R7: 1C; FP MCCANN LIMITED R7: 1C; FP MCCANN LIMITED R7: 1C 2C; GALLIFORD TRY CONSTRUCTION LIMITED R2: 1R, R3: 1R, R4: 1C; GALLIFORD TRY CONSTRUCTION LIMITED R2: 1R, R3: 1R, R4: 1R; GALLIFORD TRY CONSTRUCTION LIMITED R4: 1R; HOWARD CIVIL ENGINEERING LIMITED R2: 1C 3C 6C; J HOPKINS (CONTRACTORS) LIMITED R2: 8R; JACKSON CIVIL ENGINEERING GROUP LIMITED R6: 3R; JN BENTLEY LIMITED R2: 3R 6C 7C, R3: 3R 6C 7C, R5: 3C 6C 7C; JN BENTLEY LIMITED R2: 3R 6C 7R, R3: 3R 6C 7C, R5: 3C 6C 7C; JN BENTLEY LIMITED R2: 4C 5C 6C 7C 8C, R3: 3R 4C 5C 6C 7C, R4: 8C, R5: 1C 3C 4C 5C 6C 7C 8C; JOHN GRAHAM CONSTRUCTION LIMITED R1A: 1C 2C 3C 4C 5C 6C 7C 8C, R1B: 1C 2C 3C 4C 5C 6C 7C 8C, R1C: 1C 2C 3C 4C 5C 6C 7C 8C, R1D: 1C 2C 3C 4C 5C 6C 7C 8C, R2: 1C 2C 3C 4C 5C 6C 7C 8C, R3: 1C 2C 3C 4C 5C 6C 7C 8C, R4: 1C 2C 3C 4C 5C 6C 7C 8C, R6: 1C 2C 3C 4C 5C 6C 7C 8C, R7: 1C 2C 3C 4C 5C 6C 7C 8C; JOHN GRAHAM CONSTRUCTION LIMITED R1A: 1C 2C 3C 4C 5C 6C 7C, R1B: 1C 2C 3C 4C 5C 6C 7C, R1C: 1C 2C 3C 4C 5C 6C 7C, R1D: 1C 2C 3C 4C 5C 6C 7C, R2: 1C 2C 3C 4C 5C 6C 7C, R3: 1C 2C 3C 4C 5C 6C 7C, R4: 1C 2C 3C 4C 5C 6C 7C, R6: 1C 2C 3C 4C 5C 6C 7C, R7: 1C 2C 3C 4C 5C 6C 7C; JOHN GRAHAM CONSTRUCTION LIMITED R1A: 1C 2C 3C 4C 5C 7C, R1B: 1C 2C 3C 4C 5C 7C, R1C: 1C 2C 3C 4C 5C 7C, R1D: 1C 2C 3C 4C 5C 7C, R2: 1C 2C 3C 4C 5C 7C, R3: 1C 2C 3C 4C 5C 7C, R4: 1C 2C 3C 4C 5C 7C, R6: 1C 2C 3C 4C 5C 7C, R7: 1C 2C 3C 4C 5C 7C; JOHN GRAHAM CONSTRUCTION LIMITED R7: 1C 2C 3C 4C 5C 6C 7C 8C; JOHN SISK AND SON (HOLDINGS) LIMITED R2: 2R 3C, R3: 2R 3C, R4: 1R 2R 3C, R5: 1C 2C 3C, R6: 1R 2R 3C; JOHN SISK AND SON (HOLDINGS) LIMITED R2: 2R 3C, R3: 2R 3C, R4: 1R 2R 3C, R5: 1C 2C 3C, R6: 2R 3C; JOHN SISK AND SON (HOLDINGS) LIMITED R2: 2R, R3: 2R, R4: 2C, R6: 2C; JOHN SISK AND SON (HOLDINGS) LIMITED R2: 2R, R3: 2R, R4: 2R, R6: 2R; JONES BROS RUTHIN (CIVIL ENGINEERING) CO LIMITED R1A: 1C 2C 3C 4C 7C, R1B: 1C 2C 3C 4C 7C, R1C: 1C 2C 3C 4C 7C, R1D: 1C 2C 3C 4C 7C, R2: 3R 4R 7R, R3: 3R 4R 7R, R4: 3R 4C 7C, R5: 3R 4C 7R; JONES BROS RUTHIN (CIVIL ENGINEERING) CO LIMITED R1A: 1C 2C 3R 4C 7C, R1B: 1C 2C 3R 4C 7C, R1C: 1C 2C 3R 4C 7C, R1D: 1C 2C 3C 4C 7C, R3: 4R 7R, R4: 4R 7R, R5: 2R 3R 4C 7C; JONES BROS RUTHIN (CIVIL ENGINEERING) CO LIMITED R1A: 1C 4C 7C, R1B: 1C 4C 7C, R1C: 1C 4C 7C, R1D: 1C 4C 7C, R2: 4C 7R, R3: 4C 7R, R4: 4C 7C, R5: 1R 4C 7C; JONES BROS RUTHIN (CIVIL ENGINEERING) CO LIMITED R5: 4R 6R 8R; KELTBRAY BUILT ENVIRONMENT LIMITED R1A: 4C 7C 9C, R1B: 4C 7C 9C, R1C: 4C 7C 9C, R1D: 4C 7C 9C, R5: 2R, R6: 4R 7R 9C, R7: 1R 2C 4C 7C 9C; KELTBRAY BUILT ENVIRONMENT LIMITED R1A: 4C 7C, R1B: 4C 7C, R1C: 4C 7C, R1D: 4C 7C, R2: 4R, R5: 2R, R6: 4R 7R, R7: 1C 2C 4C 7C; KELTBRAY BUILT ENVIRONMENT LIMITED R1A: 4C, R1B: 4C, R1C: 4C, R1D: 4C, R5: 1R 2R, R6: 4R, R7: 1C 2C 4C; KELTBRAY BUILT ENVIRONMENT LIMITED R4: 2R, R5: 2C, R7: 2C; KIER INFRASTRUCTURE AND OVERSEAS LIMITED R2: 1R 2C 3C 4C 5C 6C 7C 8C 9C, R3: 1R 2C 3C 4C 5C 6C 7C 8C 9C, R4: 1C 2C 3C 4C 5C 6C 7C 8C 9C, R5: 1C 2C 3C 4C 5C 6C 7C 8C 9C, R6: 1C 2C 3C 4C 5C 6C 7C 8C 9C; KIER INFRASTRUCTURE AND OVERSEAS LIMITED R2: 1R 2C 3C 4C 5C 6C 7C 8C 9C, R3: 1R 2C 3C 4C 5C 6C 7C 8C 9C, R4: 1C 2C 3C 4C 5C 6C 7C 8C 9C, R5: 1C 2C 3C 4C 5C 6C 7C 8C 9C, R6: 1R 2C 3C 4C 5C 6C 7C 8C 9C; KIER INFRASTRUCTURE AND OVERSEAS LIMITED R2: 1R 2R 3C 4C 5C 6C 7C 8C 9C, R3: 1R 2R 3C 4C 5C 6C 7C 8C 9C, R4: 1C 2C 3C 4C 5C 6C 7C 8C 9C, R5: 1C 2C 3C 4C 5C 6C 7C 8C 9C, R6: 1R 2R 3C 4C 5C 6C 7C 8C 9C; KIER INFRASTRUCTURE AND OVERSEAS LIMITED R2: 1R 2R 3C 4C 5C 6C 7C 8C 9C, R3: 2R 3C 4C 5C 6C 7C 8C 9C, R4: 1R 2C 3C 4C 5C 6C 7C 8C 9C, R5: 1C 2C 3C 4C 5C 6C 7C 8C 9C, R6: 1R 2C 3C 4C 5C 6C 7C 8C 9C; LAGAN AVIATION & INFRASTRUCTURE LIMITED R2: 8C, R7: 8C; LAGAN AVIATION & INFRASTRUCTURE LIMITED R2: 8R, R7: 8C; LOWRY BUILDING AND CIVIL ENGINEERING LIMITED R7: 1C 2C 3C 6C; LOWRY BUILDING AND CIVIL ENGINEERING LIMITED R7: 6C; MCLAUGHLIN & HARVEY LIMITED R1A: 1C 2C 3C 4C 5C 6C 7C 8C, R1B: 1C 2C 3C 4C 5C 6C 7C 8C, R1C: 1C 2C 3C 4C 5C 6C 7C 8C, R1D: 1C 2C 3C 4C 5C 6C 7C 8C, R2: 1C 2C 3C 4C 5C 6C 7C 8C, R3: 1C 2C 3C 4C 5C 6C 7C 8C, R4: 1C 2C 3C 4C 5C 6C 7C 8C, R6: 1C 2C 3C 4C 5C 6C 7C 8C, R7: 3C; MCLAUGHLIN & HARVEY LIMITED R1A: 3C 4C 5C 8C, R1B: 3C 4C 5C 8C, R1C: 3C 4C 5C 8C, R1D: 3C 4C 5C 8C, R2: 3C 4C 5C 8C, R3: 3C 4C 5C 8C, R4: 3C 4C 5C 8C, R6: 3C 4C 5C 8C, R7: 3C 4C 8C; MCLAUGHLIN & HARVEY LIMITED R1A: 3C 5C 8C, R1B: 3C 5C 8C, R1C: 3C 5C 8C, R1D: 3C 5C 8C, R2: 3C 5C 8C, R3: 3C 5C 8C, R4: 3C 5C 8C, R6: 3C 5C 8C, R7: 3C 8C; MCPHILLIPS (WELLINGTON) LIMITED R3: 6R, R5: 1R 6C; MCPHILLIPS (WELLINGTON) LIMITED R3: 6R, R5: 6C; MELDRUM STRUCTURAL AND CIVIL ENGINEERING LIMITED R2: 3C; MILDREN CONSTRUCTION LIMITED R4: 6C 8R, R6: 6C 8C; MILESTONE INFRASTRUCTURE LIMITED R3: 1C 3C, R4: 1C 3C, R6: 1C 3C; MILESTONE INFRASTRUCTURE LIMITED R3: 1C, R4: 1C, R6: 1C; MONTEL CIVIL ENGINEERING LIMITED R3: 1C 3C, R4: 1C 3C; MONTEL CIVIL ENGINEERING LIMITED R4: 1C; MORGAN SINDALL CONSTRUCTION & INFRASTRUCTURE LIMITED R1A: 1C 2C 4C 7C, R1B: 1C 2C 4C 7C, R1C: 4C 7C, R1D: 4C 7C, R2: 1C 2C 3C 4C 6C 7C, R3: 1C 2C 3C 4C 6C 7C, R4: 2C, R5: 1C 2C 3C 4C 6C 7C, R6: 1C 2C 3C 4C 6C 7C 8C; OSBORNE INFRASTRUCTURE LIMITED R2: 1C 2C, R3: 1C 2C, R4: 1C 2C, R6: 1C 2C; OSBORNE INFRASTRUCTURE LIMITED R2: 1R 2C, R3: 1R 2C, R4: 1C 2C, R6: 1C 2C; O’BRIEN CONTRACTORS LIMITED R3: 2C 4C; P CASEY & CO LTD R2: 6R; P.P. O’CONNOR GROUP LIMITED R2: 4R 5C 6R 7R 8R, R3: 5C 6R 7R 8R, R5: 4R 5C 6R 7R 8R; PBS CONSTRUCTION (NORTH EAST) LIMITED R2: 1R 3R 4C; RJ MCLEOD (CONTRACTORS) LIMITED R1A: 1C 3C 4C 7C, R1B: 1C 3C 4C 7C, R1C: 1C 3C 4C 7C, R1D: 1C 3C 4C 7C; RJ MCLEOD (CONTRACTORS) LIMITED R1A: 1C 3C 4R 7C, R1B: 1C 3C 4R 7C, R1C: 1C 3C 4R 7C, R1D: 1C 3C 4R 7C; RJ MCLEOD (CONTRACTORS) LIMITED R1A: 1C 3R 4C 7R, R1B: 1C 3R 4C 7R, R1C: 1C 3R 4C 7R, R1D: 1C 3R 4C 7C; RJ MCLEOD (CONTRACTORS) LIMITED R1A: 7C, R1B: 7C, R1C: 7C, R1D: 7C; SIR ROBERT MCALPINE LIMITED R2: 1C, R3: 1C, R4: 1C, R6: 1C; SIR ROBERT MCALPINE LIMITED R2: 1C, R3: 1R, R4: 1C, R6: 1C; VINCI CONSTRUCTION UK LIMITED R2: 1C 2C 4C 5C 6C 7C 8C, R3: 1C 2C 4C 5C 6C 7C 8C, R4: 1C 2C 4C 5C 6C 7C 8C, R5: 1C 2C 4C 5C 6C 7C 8C, R6: 1C 2C 4C 5C 6C 7C 8C; VINCI CONSTRUCTION UK LIMITED R2: 2C 4C 5C 6C 7C 8C, R3: 2C 4C 5C 6C 7C 8C, R4: 2C 4C 5C 6C 7C 8C, R5: 2C 4C 5C 6C 7C 8C, R6: 2C 4C 5C 6C 7C 8C; VINCI CONSTRUCTION UK LIMITED R2: 4C 6C 7C, R3: 4C 6C 7C, R4: 4C 6C 7C, R5: 4C 6C 7C, R6: 4C 6C 7C; VINCI CONSTRUCTION UK LIMITED R2: 4C 7C, R3: 4C 7C, R4: 4C 7C, R5: 4C 7C, R6: 4C 7C; VOLKERFITZPATRICK LIMITED R1A: 2C 3C 4C 5C 7C 8C, R1B: 2C 3C 4C 5C 7C 8C, R1C: 2C 3C 4C 5C 7C 8C, R1D: 1C 2C 3C 4C 5C 7C 8C, R2: 2R 3C 4C 5C 7C 8C, R3: 1R 2R 3C 4C 5C 7C 8C, R4: 1R 2C 3C 4C 5C 7C 8C, R5: 1C 2C 3C 4C 5C 7C 8C, R6: 1R 2R 3C 4C 5C 7C 8C, R7: 8C; VOLKERFITZPATRICK LIMITED R1A: 2C 3C 4C 5C 7C 8C, R1B: 2C 3C 4C 5C 7C 8C, R1C: 2C 3C 4C 5C 7C 8C, R1D: 1C 2C 3C 4C 5C 7C 8C, R2: 2R 3C 4C 5C 7C 8C, R3: 2R 3C 4C 5C 7C 8C 9C, R4: 1R 2R 3C 4C 5C 7C 8C 9C, R5: 2C 3C 4C 5C 7C 8C, R6: 1R 2R 3C 4C 5C 7C 8C 9C, R7: 8C; VOLKERFITZPATRICK LIMITED R1A: 3C 4C 5C 7C 8C, R1B: 3C 4C 5C 7C 8C, R1C: 3C 4C 5C 7C 8C, R1D: 1C 2C 3C 4C 5C 7C 8C, R2: 2C 3R 4C 5C 7C 8C, R3: 1R 2C 3R 4C 5C 7C 8C 9C, R4: 2C 3C 4C 5C 7C 8C 9C, R5: 2C 3C 4C 5C 7C 8C, R6: 1C 2C 3C 4C 5C 7C 8C 9C; VOLKERFITZPATRICK LIMITED R1A: 3C 4C 5C 7C 8C, R1B: 3C 4C 5C 7C 8C, R1C: 3C 4C 5C 7C 8C, R1D: 1C 2C 3C 4C 5C 7C 8C, R2: 2R 3C 4C 5C 7C 8C, R3: 2R 3C 4C 5C 7C 8C 9C, R4: 2C 3C 4C 5C 7C 8C 9C, R5: 2C 3C 4C 5C 7C 8C, R6: 1R 2R 3C 4C 5C 7C 8C 9C, R7: 8C; WHITEHOUSE CONSTRUCTION CO. LIMITED R3: 4R 6C 8C 9C; WHITEMOUNTAIN QUARRIES LIMITED R2: 8C, R3: 8C, R4: 8C, R5: 1R 8C, R6: 8C, R7: 1C 8C; WHITEMOUNTAIN QUARRIES LIMITED R2: 8C, R3: 8C, R4: 8C, R5: 1R 8C, R6: 8C, R7: 1R 8C; WHITEMOUNTAIN QUARRIES LIMITED R2: 8C, R3: 8C, R4: 8R, R5: 1R 8C, R6: 8C, R7: 1C 8C; WINVIC CONSTRUCTION LIMITED R3: 2R, R6: 2R; WINVIC CONSTRUCTION LIMITED R6: 2R |

## CPV Codes

### Divisions

- 45 - Construction work

### Codes

- 45200000 - Works for complete or part construction and civil engineering work
- 45220000 - Engineering works and construction works
- 45221000 - Construction work for bridges and tunnels, shafts and subways
- 45222000 - Construction work for engineering works except bridges, tunnels, shafts and subways
- 45230000 - Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork
- 45231000 - Construction work for pipelines, communication and power lines
- 45232000 - Ancillary works for pipelines and cables
- 45233000 - Construction, foundation and surface works for highways, roads
- 45234000 - Construction work for railways and cable transport systems
- 45235000 - Construction work for airfields, runways and manoeuvring surfaces
- 45236000 - Flatwork
- 45240000 - Construction work for water projects
- 45241000 - Harbour construction works
- 45242000 - Waterside leisure facilities construction work
- 45243000 - Coastal-defence works
- 45244000 - Marine construction works
- 45245000 - Dredging and pumping works for water treatment plant installations
- 45246000 - River regulation and flood control works
- 45247000 - Construction work for dams, canals, irrigation channels and aqueducts
- 45248000 - Construction work for hydro-mechanical structures
- 45250000 - Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry
- 45251000 - Construction works for power plants and heating plants
- 45251120 - Hydro-electric plant construction work
- 45251160 - Wind-power installation works
- 45252000 - Construction works for sewage treatment plants, purification plants and refuse incineration plants
- 45253000 - Construction work for chemical-processing plant
- 45254000 - Construction work for mining and manufacturing
- 45255000 - Construction work for the oil and gas industry

## Release History

- 3 Jul 2022 at 20:51 - Award - Award Notice - https://www.find-tender.service.gov.uk/Notice/018086-2022
- 20 Sep 2021 at 08:43 - Tender - Tender Notice - https://www.find-tender.service.gov.uk/Notice/023278-2021
- 14 Jun 2021 at 08:28 - Planning - Planning Notice - https://www.find-tender.service.gov.uk/Notice/013291-2021

## Notice URLs

- https://in-tendhost.co.uk/pagabo
- https://in-tendhost.co.uk/pagabo/aspx/home
- https://qefacilities.co.uk
- https://www.qefacilities.co.uk

## Provenance

This Markdown file is an alternate public rendering of the D3 Tenders contract record. The canonical page is https://d3tenders.com/contract/?ocid=ocds-h6vhtk-02bb5e. The underlying structured data is available as OCDS JSON at https://d3tenders.com/contract/ocds-h6vhtk-02bb5e.json.
