title: "DE2957529 Appointment of an IST for New-Bridge Integrated College Loughbrickland"
ocid: "ocds-h6vhtk-02fe83"
canonical_url: "https://d3tenders.com/contract/?ocid=ocds-h6vhtk-02fe83"
markdown_url: "https://d3tenders.com/contract/ocds-h6vhtk-02fe83.md"
json_url: "https://d3tenders.com/contract/ocds-h6vhtk-02fe83.json"
source: "Find A Tender Service"
current_stage: "Award"
buyer: "THE TRUSTEES OF NEW-BRIDGE INTEGRATED COLLEGE"
published: "2021-12-08"
---

# DE2957529 Appointment of an IST for New-Bridge Integrated College Loughbrickland

Buyer: THE TRUSTEES OF NEW-BRIDGE INTEGRATED COLLEGE  
Current stage: Award  
OCID: ocds-h6vhtk-02fe83

[View canonical contract page](https://d3tenders.com/contract/?ocid=ocds-h6vhtk-02fe83)  
[Download OCDS JSON](https://d3tenders.com/contract/ocds-h6vhtk-02fe83.json)

## Summary

The procurement process involves the appointment of an Integrated Supply Team (IST) for the construction of the new Post-Primary School at New-Bridge Integrated College, located in Loughbrickland, UK. The process is governed by the Public Contracts Regulations 2015 and has reached the award stage, with the contract awarded on 26th November 2021. The value of the contract is approximately £20.6 million and it is expected to be carried out over a 30-month construction period. The tender follows a selective procurement method and falls under the industry category of works, specifically focusing on electrical installation work and construction for school buildings.

This tender presents significant opportunities for businesses involved in construction and educational infrastructure, particularly firms that specialise in electrical installations, mechanical engineering works, and large-scale building projects. The phased development approach allows businesses to showcase their capacity to manage complex projects while maintaining operational facilities. Companies experienced in similar environments, particularly those large enough to handle significant contracts, such as this one, would find this opportunity favourable for growth and expansion in the public sector.

## Notice

The project is for the design, supply, delivery, receiving, off-loading, setting into position, fixing, erection, building testing, commissioning and finishing in every respect of the new Post-Primary School for 670 pupils to include external hard play, synthetic and grass pitches, tennis courts, Sports Hall, School Meals Accommodation, car and bus parking and drop-off and a new entrance onto Donard View Road. The design has been completed to RIBA Stage 3. The successful IST will be responsible for completing RIBA Stage 4 onwards. It is proposed to construct the new school on the existing site with the grass pitches being developed on a newly purchased site adjacent to the existing. There are no established site services on the additional site. The main school building will be located on the middle portion of the site slightly further back on the site than the current main building of the School. It is anticipated that extensive phasing will be required with the school remaining fully operational during the construction period. By facilitating a phased development, a portion of the new school buildings are constructed on part of the footprint of the existing school buildings. This allows for a more efficient use of the site with no diversion of the mains sewer necessary. The estimated programme for the construction period is of the order of 30 months (overall incl pre-construction is 35 months approx). Full details will be provided in the ITT documentation.

### Lot Information

Lot 1

The project is for the design, supply, delivery, receiving, off-loading, setting into position, fixing, erection, building testing, commissioning and finishing in every respect of the new Post-Primary School for 670 pupils to include external hard play, synthetic and grass pitches, tennis courts, Sports Hall, School Meals Accommodation, car and bus parking and drop-off and a new entrance onto Donard View Road. The design has been completed to RIBA Stage 3. The successful IST will be responsible for completing RIBA Stage 4 onwards. It is proposed to construct the new school on the existing site with the grass pitches being developed on a newly purchased site adjacent to the existing. There are no established site services on the additional site. The main school building will be located on the middle portion of the site slightly further back on the site than the current main building of the School. It is anticipated that extensive phasing will be required with the school remaining fully operational during the construction period. By facilitating a phased development, a portion of the new school buildings are constructed on part of the footprint of the existing school buildings. This allows for a more efficient use of the site with no diversion of the mains sewer necessary. The estimated programme for the construction period is of the order of 30 months (overall incl pre-construction is 35 months approx). Full details will be provided in the ITT documentation.

## Key Details

| Field | Value |
| --- | --- |
| Publication source | Find A Tender Service |
| Latest notice | https://www.find-tender.service.gov.uk/Notice/030476-2021 |
| Notice type | Award Notice |
| Procurement type | Standard |
| Procurement category | Works |
| Procurement method | Selective |
| Procurement method details | Restricted procedure |
| Tender suitability | Not specified |
| Awardee scale | Large |
| All stages | Award |

## Dates

| Field | Value |
| --- | --- |
| Publication date | 8 Dec 2021 |
| Submission deadline | Not specified |
| Future notice date | Not specified |
| Award date | 26 Nov 2021 |
| Contract period | Not specified |
| Recurrence | Not specified |

## Values

| Field | Value |
| --- | --- |
| Tender value | Not specified |
| Lots value | Not specified |
| Awards value | Not specified |
| Contracts value | £20,599,220 |

## Status

| Field | Value |
| --- | --- |
| Tender status | Complete |
| Lots status | Cancelled |
| Awards status | Active |
| Contracts status | Active |

## Buyer

| Field | Value |
| --- | --- |
| Main buyer | THE TRUSTEES OF NEW-BRIDGE INTEGRATED COLLEGE |
| Locality | BANBRIDGE |
| Post town | Northern Ireland |
| Postcode | BT32 3LN |
| Country | Northern Ireland |
| ITL 1 | TLN Northern Ireland |
| ITL 2 | TLN0 Northern Ireland |
| ITL 3 | TLN07 Armagh City, Banbridge and Craigavon |
| Local authority | Armagh City, Banbridge and Craigavon |
| Electoral ward | Loughbrickland |
| Westminster constituency | South Down |
| Delivery location | TLN0 Northern Ireland |

## Supplier

| Field | Value |
| --- | --- |
| Number of suppliers | 1 |
| Supplier names | GANSON |

## CPV Codes

### Divisions

- 45 - Construction work

### Codes

- 45210000 - Building construction work
- 45214200 - Construction work for school buildings
- 45214220 - Secondary school construction work
- 45310000 - Electrical installation work
- 45351000 - Mechanical engineering installation works

## Release History

- 8 Dec 2021 at 10:25 - Award - Award Notice - https://www.find-tender.service.gov.uk/Notice/030476-2021

## Notice URLs

- https://etendersni.gov.uk/epps
- https://ted.europa.eu/udl?uri=TED:NOTICE:320302-2020:TEXT:EN:HTML

## Provenance

This Markdown file is an alternate public rendering of the D3 Tenders contract record. The canonical page is https://d3tenders.com/contract/?ocid=ocds-h6vhtk-02fe83. The underlying structured data is available as OCDS JSON at https://d3tenders.com/contract/ocds-h6vhtk-02fe83.json.