# CP7 Eastern Region Renewals and Minor Enhancements

Buyer: NETWORK RAIL INFRASTRUCTURE LTD  
Current stage: Tender  
OCID: ocds-h6vhtk-030b8e

[View canonical contract page](https://d3tenders.com/contract/?ocid=ocds-h6vhtk-030b8e)  
[Download OCDS JSON](https://d3tenders.com/contract/ocds-h6vhtk-030b8e.json)

## Summary

The procurement process is being conducted by Network Rail Infrastructure Ltd for the project titled "CP7 Eastern Region Renewals and Minor Enhancements," primarily in the construction industry. The tender is currently in the active stage with submissions due by 13th May 2022. The procurement encompasses various regions including Anglia, East Coast, East Midlands, and North & East routes in the UK. The overall estimated value of the framework is between £3.5 billion and £4 billion, and it aims to appoint multiple construction partners across five key lots with a project duration of up to ten years.

This tender presents significant opportunities for construction companies, especially those experienced in rail services, civil engineering, and integrated multi-discipline projects. Businesses that can offer innovative solutions in productivity, sustainability, and collaborative approaches could thrive in this competitive bidding environment. Companies interested in participating should prepare their submissions to meet the rigorous selection criteria set by Network Rail, which emphasises strategic alignment, capability, and economic stability.

## Notice

Network Rail propose to procure renewals and minor enhancement adopting an integrated multi-discipline rail system approach that is flexible with a focus on productivity and passenger outcomes. Network Rail has set 5 strategic focus areas - a railway system approach; capabilities; productivity; collaborative behaviours; and sustainability. All these focus areas support the Agile Client Eastern (ACE) Capital Delivery operating model. Further information on the ACE operating model can be found within the Procurement Documents. Two Partnerships (North/South) will be created in the Eastern region. Key to their success will be aligned objectives and collaborative behaviours, where Network Rail will create competitive tension and adopt an incentivisation mechanism that will drive enhanced performance whilst fostering a culture of continuous improvement, quality driven outputs and delivering innovative solutions. The partners can undertake works and/or services in relation to the scope of their Lot and in addition undertake those works as part of Work Orders led by other partners. For example, the Structures, Geotechnics and Buildings partner can undertake the Structures, Geotechnics and Buildings works associated with a Signalling or OLE Works Order. In addition, where it provides value for money to do so for Network Rail, the partner may undertake works that are reasonably necessary to be supplied or installed contemporaneously with the Work Order. This could include but is not limited to the adjustment of Overhead Lines or track when undertaking a bridge replacement by a Lot 1 or 2 Structures, Geotechnics and Buildings partner. The Framework terms and conditions will provide NR with the flexibility to request partners to undertake CP7 work bank projects in both the North and South partnership regions. Network Rail is looking to appoint 14 construction partners to deliver the CP7 renewals and minor enhancement works across the Eastern Region. In addition, 5 secondary suppliers will also be appointed per Lot who sits outside the partnership. The partners will be appointed across 5 Lots as follows:- Lot 1 Structures, Geotechnics & Buildings (North): 3 partners plus 1 secondary supplier Lot 2 Structures, Geotechnics & Buildings (South): 3 partners plus 1 secondary supplier Lot 3 Signalling and Telecoms North & South: 4 partners (2 per partnership region) plus 1 secondary supplier Lot 4 Electrification & Power - Contact Systems North & South: 2 partners (1 per partnership region) plus 1 secondary supplier Lot 5 Electrification & Power - Distribution and Plant North & South: 2 partners (1 per partnership region) plus 1 secondary supplier The partners will be responsible for the design and construction works for the CP7 work bank for their respective Lot. The partners will be appointed via a Framework and a Partnering Agreement. The partners may also be asked to undertake emergency works and services. The Framework duration will be 5 years with an option to extend by a further 5 years with a 4-month mobilisation period and a further period to complete outstanding works. The contract is divided into 5 Lots. Tenders may be submitted for a maximum of 2 Lots. The estimated total value of the Framework will be within the range of PS3,500,000,000 to PS4,000,000,000 for the 10-year duration.

### Lot Information

Structures, Geotechnics & Buildings (North)

Network Rail is looking to appoint construction partners to deliver the building & civils work bank. The scope of work type to be delivered includes but not limited to the following:- Building/civils and associated mechanical and electrical works for: stations, depots, maintenance delivery units and lineside buildings Structural works for: footbridges, overbridges, underbridges, tunnels, retaining walls and culverts Geotechnic works for: earthwork cuttings and embankments, rock cuttings, drainage and piling. The scope of works may also include Asbestos removal. Additional information: The lot value is for guidance only and is based on the projected spend for the 10 year framework duration.

Renewal: The initial term of the framework will be 5 years (plus mobilisation period) with an option, subject to the successful supplier's performance during the initial term and on-going need by Network Rail to extend for a further period up to 5 years. The estimated total value of Lot 1 will be within the range of PS750,000,000 to PS850,000,000 for the 10-year duration.

Structures, Geotechnics & Buildings (South)

Network Rail is looking to appoint construction partners to deliver the building & civils work bank. The scope of work type to be delivered includes but not limited to the following:- Building/civils and associated mechanical and electrical works for: stations, depots, maintenance delivery units and lineside buildings Structural works for: footbridges, overbridges, underbridges, tunnels, retaining walls and culverts Geotechnic works for: earthwork cuttings and embankments, rock cuttings, drainage and piling The scope of works may also include Asbestos removal. Additional information: The lot value is for guidance only and is based on the projected spend for the 10 year framework duration.

Renewal: The initial term of the framework will be 5 years (plus mobilisation period) with an option, subject to the successful supplier's performance during the initial term and on-going need by Network Rail to extend for a further period up to 5 years. The estimated total value of Lot 2 will be within the range of PS750,000,000 to PS850,000,000 for the 10-year duration.

Signalling & Telecoms

Network Rail is looking to appoint construction partners to deliver the signalling and telecoms work bank. The scope of work type to be delivered includes but not limited to the following:- Refurb and partial: signal renewals, signal conversions, point conversion, track circuit conversions Refurb: ground frame conversion to Ground Switch Panel (GSP), alterations to scalable IECC / West Cad, provision of staff protection systems, location case renewals including minor alterations to signalling power supplies, TDM renewals, removal of obsolete equipment - transmission (CCTV, TDM & FDM), targeting component renewals - HABDs / REBs, Provision of FTNX / FTNX points of presence in signalling equipment rooms (inc. REBs) Partial: interlocking re-lock, interlocking re-control, re-platform of interlocking Minor works: intelligent infrastructure installations, alterations to existing Solid State Interlockings (SSI), alterations to Track Protections Systems Level crossings: level crossing Life Extension Works (LEW) for all types of crossings, level crossings renewals for all types of level crossings, conversion of mechanical winding barriers, conversion of level crossings interlockings to processor based systems Additional information: The lot value is for guidance only and is based on the projected spend for the 10-year framework duration.

Renewal: The initial term of the framework will be 5 years (plus mobilisation period) with an option, subject to the successful supplier's performance during the initial term and on-going need by Network Rail to extend for a further period up to 5 years. The estimated total value of Lot 3 will be within the range of PS1,100,000,000 to PS1,300,000,000 for the 10-year duration.

Electrification & Power - Contact Systems

Network Rail is looking to appoint construction partners to deliver the contact systems work bank. The scope of work type to be delivered includes but not limited to the following:- AC Contact systems (OLE): OHL-Structure Renewal, structural, civils, overhead line installation, OLE design, structural assessment, design, refurbishment and renewal (as required), geotechnical assessment, OLE campaign changes, Insulator renewals (public areas / general campaign changes), dropper renewals, cantilever adjustments, OLE Re-wire, contact wire renewal (including the use of High Output plant (wiring trains)), catenary wire renewal (including the use of High Output plant (wiring trains)), crossovers (including potential re-design if required), section insulator, mid-life refurbishment, carrier wire style neutral section ,OLE power connections (switch relocation / redesign) DC Contact systems: solid conductor beam refurbishment (+ bonding), alterations to existing Solid State Interlockings (SSI), alterations to Track Protections Systems Other: pantograph monitoring systems, forensic analysis (root cause analysis of failures), isolation diagram corrections and reviews, legacy equipment renewal (design knowledge required), surveys e.g. drone, point cloud, etc. for structures, tunnel renewals (fixed overhead line equipment, steelwork), SCADA / isolations, reduced clearance locations resulting in flashovers Additional information: The lot value is for guidance only and is based on the projected spend for the 10-year framework duration.

Renewal: The initial term of the framework will be 5 years (plus mobilisation period) with an option, subject to the successful supplier's performance during the initial term and on-going need by Network Rail to extend for a further period up to 5 years. The estimated total value of Lot 4 will be within the range of PS450,000,000 to PS480,000,000 for the 10-year duration.

Electrification & Power - Distribution & Plant

Network Rail is looking to appoint construction partners to deliver the distribution and power work bank. The scope of work type to be delivered includes but not limited to the following:- HV non-traction distribution, HV traction distribution plant, HV circuit breakers, Switchgear units, transformers, signalling power (inc. DNO supplies), lighting and associated LV distribution, LV non-traction distribution, walkway lighting and columns., operational lighting (buffer stops etc.), Rail yard lighting and columns, Tunnel lighting, Level crossing CCTV and lighting, Lineside operational equipment and monitoring devices (e.g. wheelchex and panchax, trackside drainage pumps (including tunnel drainage pumps) and ventilation, points heating systems (inc. DNO supplies, heat retainers, remote monitoring) Swing bridge controls replacement Additional information: The lot value is for guidance only and is based on the projected spend for the 10-year framework duration.

Renewal: The initial term of the framework will be 5 years (plus mobilisation period) with an option, subject to the successful supplier's performance during the initial term and on-going need by Network Rail to extend for a further period up to 5 years. The estimated total value of Lot 5 will be within the range of PS450,000,000 to PS520,000,000 for the 10-year duration.

## Key Details

| Field | Value |
| --- | --- |
| Publication source | Find A Tender Service |
| Latest notice | https://www.find-tender.service.gov.uk/Notice/009427-2022 |
| Notice type | Planning Notice |
| Procurement type | Framework |
| Procurement category | Works |
| Procurement method | Selective |
| Procurement method details | Competitive procedure with negotiation |
| Tender suitability | Not specified |
| Awardee scale | Not specified |
| All stages | Planning, Tender |

## Dates

| Field | Value |
| --- | --- |
| Publication date | 7 Apr 2022 |
| Submission deadline | 13 May 2022 |
| Future notice date | 30 Mar 2022 |
| Award date | Not specified |
| Contract period | Not specified |
| Recurrence | Not specified |

## Values

| Field | Value |
| --- | --- |
| Tender value | £4,000,000,000 |
| Lots value | £3,000,000,000 |
| Awards value | Not specified |
| Contracts value | Not specified |

## Status

| Field | Value |
| --- | --- |
| Tender status | Active |
| Lots status | Active |
| Awards status | Not specified |
| Contracts status | Not specified |

## Buyer

| Field | Value |
| --- | --- |
| Main buyer | NETWORK RAIL INFRASTRUCTURE LTD |
| Locality | LONDON |
| Post town | North West London |
| Postcode | NW1 2DN |
| Country | England |
| ITL 1 | TLI London |
| ITL 2 | TLI3 Inner London - West |
| ITL 3 | TLI36 Camden |
| Local authority | Camden |
| Electoral ward | Regent's Park |
| Westminster constituency | Holborn and St Pancras |
| Delivery location | Not specified |

## CPV Codes

### Divisions

- 45 - Construction work
- 71 - Architectural, construction, engineering and inspection services

### Codes

- 45000000 - Construction work
- 45100000 - Site preparation work
- 45200000 - Works for complete or part construction and civil engineering work
- 45210000 - Building construction work
- 45213320 - Construction work for buildings relating to railway transport
- 45213321 - Railway station construction work
- 45221112 - Railway bridge construction work
- 45232210 - Overhead line construction
- 45234000 - Construction work for railways and cable transport systems
- 45234115 - Railway signalling works
- 45234116 - Track construction works
- 45300000 - Building installation work
- 45315400 - High voltage installation work
- 45315600 - Low-voltage installation work
- 71311230 - Railway engineering services

## Release History

- 7 Apr 2022 at 17:38 - Tender - Tender Notice - https://www.find-tender.service.gov.uk/Notice/009427-2022
- 14 Jan 2022 at 22:45 - Planning - Planning Notice - https://www.find-tender.service.gov.uk/Notice/001269-2022

## Notice URLs

- http://www.networkrail.co.uk
- https://networkrail.bravosolution.co.uk
- https://www.find-tender.service.gov.uk/Notice/001269-2022
- https://www.find-tender.service.gov.uk/Notice/013277-2021
- https://www.find-tender.service.gov.uk/Notice/024158-2021
- https://www.networkrail.bravosolution.co.uk/

## Provenance

This Markdown file is an alternate public rendering of the D3 Tenders contract record. The canonical page is https://d3tenders.com/contract/?ocid=ocds-h6vhtk-030b8e. The underlying structured data is available as OCDS JSON at https://d3tenders.com/contract/ocds-h6vhtk-030b8e.json.