---
title: "Cost estimating support to Technical Programme"
ocid: "ocds-h6vhtk-0317eb"
canonical_url: "https://d3tenders.com/contract/?ocid=ocds-h6vhtk-0317eb"
markdown_url: "https://d3tenders.com/contract/ocds-h6vhtk-0317eb.md"
json_url: "https://d3tenders.com/contract/ocds-h6vhtk-0317eb.json"
source: "Find A Tender Service"
current_stage: "Planning"
buyer: "RADIOACTIVE WASTE MANAGEMENT LIMITED"
published: "2022-02-16"
---

# Cost estimating support to Technical Programme

Buyer: RADIOACTIVE WASTE MANAGEMENT LIMITED  
Current stage: Planning  
OCID: ocds-h6vhtk-0317eb

[View canonical contract page](https://d3tenders.com/contract/?ocid=ocds-h6vhtk-0317eb)  
[Download OCDS JSON](https://d3tenders.com/contract/ocds-h6vhtk-0317eb.json)

## Summary

The procurement process involves Radioactive Waste Management Limited as the buying organisation seeking cost estimating support for their Technical Programme. This tender, titled "Cost estimating support to Technical Programme," falls within the architectural, construction, engineering, and inspection services industry category. The procurement is currently in the planning stage, with key dates including a future notice expected on 17th February 2022. The total contract value is £1,500,000, and services are anticipated to be delivered throughout the UK over the next three years.

This tender presents significant opportunities for businesses specialising in cost estimation, modelling, and project management, particularly those with experience in large-scale engineering projects. Firms capable of delivering detailed cost analysis and risk assessments for high-value projects, including those involving complex infrastructure, will be well-suited to compete. Additionally, those familiar with government procurement processes and the specific requirements outlined by Radioactive Waste Management Limited will have an advantage in the forthcoming competitive phases.

## Notice

RWM requires a supplier to provide cost estimation and modelling support to the in-house Cost and Estimating Team over the next 3 years for the following components of the above scope * T2 Projects: this will largely involve supporting work package managers (WPMs) and project managers (PMs) with producing their baseline cost estimate at the work package or project initiation stage before handover to ongoing cost management. There will be a small number of larger value (tens of millions of pounds) projects that will deliver scope in T2, these will require production of baseline cost estimate, including base estimate, uncertainty and risk, cost estimate report, verification and validation (V&V), approval; costing inputs to project business cases; supplier cost assurance / validation; responding to independent review queries and recommendations. * Large value T3 Projects: these projects could have a value of hundreds of millions of pounds and a duration greater than 10 years, deliverables will include costing inputs to project business cases, primarily production of baseline cost estimates, including base estimate, uncertainty and risk (schedule and cost quantitative risk analysis), cost estimate report, V&V, audit trail, approval, responding to independent review queries and recommendations, and evaluating supplier bids. * Tranches 3, 4, 5 and 6, at appropriate levels of detail given tranche 5 is expected to have a duration of over 100 years. * Overall GDF Programme Cost Model: the existing integrated GDF whole life cost (WLC) includes estimates for the facility construction, operation and closure for a range of scenarios and assumptions, these will need to be updated as site selection progresses and Programme uncertainty and options reduce. * Procurement "Should Cost" Models and bid evaluation. * Other cost studies to support the NDA Group and RWM

### Lot Information

Lot 1

RWM requires a supplier to provide cost estimation and modelling support to the in-house Cost and Estimating Team over the next 3 years for the following components of the above scope: * T2 Projects: this will largely involve supporting work package managers (WPMs) and project managers (PMs) with producing their baseline cost estimate at the work package or project initiation stage before handover to ongoing cost management. There will be a small number of larger value (tens of millions of pounds) projects that will deliver scope in T2, these will require production of baseline cost estimate, including base estimate, uncertainty and risk, cost estimate report, verification and validation (V&V), approval; costing inputs to project business cases; supplier cost assurance / validation; responding to independent review queries and recommendations. * Large value T3 Projects: these projects could have a value of hundreds of millions of pounds and a duration greater than 10 years, deliverables will include costing inputs to project business cases, primarily production of baseline cost estimates, including base estimate, uncertainty and risk (schedule and cost quantitative risk analysis), cost estimate report, V&V, audit trail, approval, responding to independent review queries and recommendations, and evaluating supplier bids. * Tranches 3, 4, 5 and 6, at appropriate levels of detail given tranche 5 is expected to have a duration of over 100 years. * Overall GDF Programme Cost Model: the existing integrated GDF whole life cost (WLC) includes estimates for the facility construction, operation and closure for a range of scenarios and assumptions, these will need to be updated as site selection progresses and Programme uncertainty and options reduce. * Procurement "Should Cost" Models and bid evaluation. * Other cost studies to support the NDA Group and RWM

## Key Details

| Field | Value |
| --- | --- |
| Publication source | Find A Tender Service |
| Latest notice | https://www.find-tender.service.gov.uk/Notice/004431-2022 |
| Notice type | Planning Notice |
| Procurement type | Standard |
| Procurement category | Services |
| Procurement method | Not Specified |
| Procurement method details | Not specified |
| Tender suitability | Not specified |
| Awardee scale | Not specified |
| All stages | Planning |

## Dates

| Field | Value |
| --- | --- |
| Publication date | 16 Feb 2022 |
| Submission deadline | Not specified |
| Future notice date | 17 Feb 2022 |
| Award date | Not specified |
| Contract period | Not specified |
| Recurrence | Not specified |

## Values

| Field | Value |
| --- | --- |
| Tender value | £1,500,000 |
| Lots value | Not specified |
| Awards value | Not specified |
| Contracts value | Not specified |

## Status

| Field | Value |
| --- | --- |
| Tender status | Planned |
| Lots status | Planned |
| Awards status | Not specified |
| Contracts status | Not specified |

## Buyer

| Field | Value |
| --- | --- |
| Main buyer | RADIOACTIVE WASTE MANAGEMENT LIMITED |
| Locality | DIDCOT |
| Post town | Oxford |
| Postcode | OX11 0GD |
| Country | England |
| ITL 1 | TLJ South East (England) |
| ITL 2 | TLJ1 Berkshire, Buckinghamshire and Oxfordshire |
| ITL 3 | TLJ14 Oxfordshire CC |
| Local authority | Vale of White Horse |
| Electoral ward | Hendreds |
| Westminster constituency | Didcot and Wantage |
| Delivery location | Not specified |

## CPV Codes

### Divisions

- 71 - Architectural, construction, engineering and inspection services

### Codes

- 71000000 - Architectural, construction, engineering and inspection services

## Release History

- 16 Feb 2022 at 14:55 - Planning - Planning Notice - https://www.find-tender.service.gov.uk/Notice/004431-2022

## Notice URLs

- https://gov.uk/nda
- https://sharedsystems.eu-supply.com/login.asp

## Provenance

This Markdown file is an alternate public rendering of the D3 Tenders contract record. The canonical page is https://d3tenders.com/contract/?ocid=ocds-h6vhtk-0317eb. The underlying structured data is available as OCDS JSON at https://d3tenders.com/contract/ocds-h6vhtk-0317eb.json.
