title: "North Campus - Industry Hub"
ocid: "ocds-h6vhtk-0398ae"
canonical_url: "https://d3tenders.com/contract/?ocid=ocds-h6vhtk-0398ae"
markdown_url: "https://d3tenders.com/contract/ocds-h6vhtk-0398ae.md"
json_url: "https://d3tenders.com/contract/ocds-h6vhtk-0398ae.json"
source: "Find A Tender Service"
current_stage: "Award"
buyer: "BURNLEY COLLEGE"
published: "2023-06-07"
---

# North Campus - Industry Hub

Buyer: BURNLEY COLLEGE  
Current stage: Award  
OCID: ocds-h6vhtk-0398ae

[View canonical contract page](https://d3tenders.com/contract/?ocid=ocds-h6vhtk-0398ae)  
[Download OCDS JSON](https://d3tenders.com/contract/ocds-h6vhtk-0398ae.json)

## Summary

The North Campus - Industry Hub procurement process by Burnley College involves the development of new infrastructure and landscaping elements, including the construction of the Industry Hub building. The project is at the award stage, with a contract worth £10,795,600 signed on 6th June 2023. The procurement method used is an open procedure, and the project is set to mobilise in early April 2023. The location for the project is at the North Campus of Burnley College in Burnley, BB12 0AN. The main procurement category is for works in the construction industry.

This tender for the North Campus - Industry Hub project presents significant business growth opportunities for construction companies specialising in works projects. The contract includes design and build services, with a focus on quality criteria such as resource plan, programme, and health and safety. Interested businesses should be prepared for the submission deadline of 1st March 2023 and ensure compliance with the tender's selection criteria and submission terms. The project offers a chance to contribute to the transformation of the college's facilities and create lasting infrastructure for the local community.

## Notice

This project comprises the development of the newly acquired North campus be developed to include: the construction of the new Industry Hub building; as well the construction of new infrastructure and landscaping elements. The proposed works will be procured through a single stage Design & Build route, based on RIBA Stage 4 Design information. The Works will be instructed in two phases: * Phase 1 being the delivery of the infrastructure and landscaping package only; and * Phase 2 being the delivery of the infrastructure and landscaping package, as well as the a new Industry Hub building. The proposed works noted under Phase 2, notably the construction of the new Industry Hub building will be dependent upon a successful funding applications.

### Lot Information

Lot 1

In late 2019, the College carried out a review of the campus and accommodation strategy, leading to a study for a strategic master plan in March 2020. The master plan identified a number of sites on the existing campus, including the teaching building and Sports building extension. The land to the North of the existing site was identified as the ideal location for an extension to the campus and would provide the College with medium-long term development capacity, the" North Campus" as it has become known. Instead of simply forming an extended version of the existing campus, the opportunity has been taken to re-think the character of a place for learning. Providing excellent teaching space is a pre-requisite, as is ensuring buildings have a low energy demand with low emissions leading towards net zero carbon is a key objective of the design. In complete contrast to the existing campus is the integration of green landscape space and buildings. Although close to the town centre with its retail parks and car parks, the North campus is envisaged as a haven with buildings in soft landscape, where proximity to nature becomes part of the student experience at Burnley College. At the heart of the North Campus is a green space, almost a park with buildings around the perimeter. The need to deal with water has been treated as a positive with storage capacity built into a central lake with swales. This will create a range of distinctive planting zones with various habitats. A linear pedestrian route that will link future buildings defines the eastern edge of the green space, it will also accommodate cafe and social learning zones that spill out from the ground floors of teaching buildings. From upper floors it is expected that the design of the proposed buildings can take advantage of views towards Pendle and South towards the viaduct. The central area will include a small sports area to supplement the all-weather pitch on the main campus. This will be provided managed sports provision that will be available for community just as existing facilities are. At the South end of the site a combination of ramp and steps will deal with the change in level between the current and proposed campus. There is also potential to incorporate a trim trail around the perimeter of the site and incorporate a performance space to the south of the industry hub with permanent seating as a landscape feature. Between the linear route and the Calder is the future development zone for teaching buildings. This zone stays outside the 8m easement along the river required by the Environment Agency. Whilst there will be access along the river, it is seen as secondary with minimal footfall. It is intended to be a quite space with limited lighting at night At the North end of the site will be the Industry Hub. The building will terminate the view and create something of a barrier to motorway noise, but as a two storey structure will not block the views of trees beyond. The ground floor social spaces are linked to a south facing external terrace that will have views of the viaduct and townscape beyond. The scope of the procurement is to appoint a Principal Contractor for the delivery of the North Campus - Industry Hub project. The successful tenderer/contractor awarded such a contract must be fully available to mobilise in early April 2023. The Contract terms and conditions will be JCT Design & Build Building Contract (2016),with Special Conditions, which are available as part of the ITT. The College has procured Project Team and Design Services to complete up to RIBA Stage 4. The following Design Disciplines are proposed to be novated to the Principal Contractor. * Architect (lead Designer) - ABW Architects * Landscape Designer - Milieu Landscape Design * Civil & Structural Engineering Consultants - Waterman Group.

## Key Details

| Field | Value |
| --- | --- |
| Publication source | Find A Tender Service |
| Latest notice | https://www.find-tender.service.gov.uk/Notice/016106-2023 |
| Notice type | Tender Notice |
| Procurement type | Standard |
| Procurement category | Works |
| Procurement method | Open |
| Procurement method details | Open procedure |
| Tender suitability | Not specified |
| Awardee scale | Large |
| All stages | Tender, Award |

## Dates

| Field | Value |
| --- | --- |
| Publication date | 7 Jun 2023 |
| Submission deadline | 1 Mar 2023 |
| Future notice date | Not specified |
| Award date | 5 Jun 2023 |
| Contract period | Not specified |
| Recurrence | Not specified |

## Values

| Field | Value |
| --- | --- |
| Tender value | £10,000,000 |
| Lots value | £10,000,000 |
| Awards value | Not specified |
| Contracts value | £10,795,600 |

## Status

| Field | Value |
| --- | --- |
| Tender status | Complete |
| Lots status | Cancelled |
| Awards status | Active |
| Contracts status | Active |

## Buyer

| Field | Value |
| --- | --- |
| Main buyer | BURNLEY COLLEGE |
| Locality | BURNLEY |
| Post town | Blackburn |
| Postcode | BB12 0AN |
| Country | England |
| ITL 1 | TLD North West (England) |
| ITL 2 | TLD4 Lancashire |
| ITL 3 | TLD46 East Lancashire |
| Local authority | Burnley |
| Electoral ward | Daneshouse with Stoneyholme |
| Westminster constituency | Burnley |
| Delivery location | TLD46 East Lancashire |

## Supplier

| Field | Value |
| --- | --- |
| Number of suppliers | 1 |
| Supplier names | JOHN TURNER CONSTRUCTION GROUP |

## CPV Codes

### Divisions

- 45 - Construction work
- 71 - Architectural, construction, engineering and inspection services

### Codes

- 45000000 - Construction work
- 45100000 - Site preparation work
- 45200000 - Works for complete or part construction and civil engineering work
- 45300000 - Building installation work
- 45400000 - Building completion work
- 45500000 - Hire of construction and civil engineering machinery and equipment with operator
- 71200000 - Architectural and related services
- 71300000 - Engineering services
- 71400000 - Urban planning and landscape architectural services
- 71500000 - Construction-related services
- 71600000 - Technical testing, analysis and consultancy services
- 71700000 - Monitoring and control services

## Release History

- 7 Jun 2023 at 10:23 - Award - Award Notice - https://www.find-tender.service.gov.uk/Notice/016106-2023
- 18 Jan 2023 at 18:00 - Tender - Tender Notice - https://www.find-tender.service.gov.uk/Notice/001610-2023

## Notice URLs

- http://www.burnley.ac.uk
- http://www.burnley.ac.uk/newbuildtender

## Provenance