---
title: "Network Rail Eastern Routes Partnership Framework"
ocid: "ocds-h6vhtk-03ad6c"
canonical_url: "https://d3tenders.com/contract/?ocid=ocds-h6vhtk-03ad6c"
markdown_url: "https://d3tenders.com/contract/ocds-h6vhtk-03ad6c.md"
json_url: "https://d3tenders.com/contract/ocds-h6vhtk-03ad6c.json"
source: "Find A Tender Service"
current_stage: "Award"
buyer: "NETWORK RAIL INFRASTRUCTURE LTD"
published: "2024-09-06"
---

# Network Rail Eastern Routes Partnership Framework

Buyer: NETWORK RAIL INFRASTRUCTURE LTD  
Current stage: Award  
OCID: ocds-h6vhtk-03ad6c

[View canonical contract page](https://d3tenders.com/contract/?ocid=ocds-h6vhtk-03ad6c)  
[Download OCDS JSON](https://d3tenders.com/contract/ocds-h6vhtk-03ad6c.json)

## Summary

Network Rail Infrastructure Ltd (NR) has successfully concluded the procurement process for the Eastern Routes Partnership (ERP) framework. The initiative, focusing on construction work within the rail sector, is central to NR’s Strategic Business Plan (SBP) for the Eastern Region. The ERP encompasses a broad array of works, including structural, geotechnical, signalling, telecoms, and distribution projects across various lots such as Generalist Buildings & Civils, Specialist Structures, and more. The ERP initially covers a 5-year period with potential yearly extensions up to an additional 5 years. The latest contract awards were finalised on 6th September 2024. Key suppliers include Amalgamated Construction Ltd, BAM Nuttall Ltd, Morgan Sindall Construction & Infrastructure Ltd, and others, highlighting a collaborative procurement approach using a negotiated procedure with a prior call for competition.

The ERP framework offers significant growth opportunities for a diverse range of businesses, particularly those with expertise in complex civil engineering, structural works, signalling, and telecom systems. SMEs and new entrants are actively encouraged to participate, especially in specialised lots, ensuring innovation and competitive pricing. The partnership includes mechanisms like a pain-gain incentive, which rewards efficiency, making it ideal for businesses capable of aligning with NR's collaborative and performance-driven culture. Companies looking to leverage their expertise in rail construction, electrical and mechanical works, and advanced geotechnical engineering will find ample prospects within this framework, helping them secure steady work and contribute to the region's infrastructural enhancements.

## Notice

Network Rail Infrastructure Ltd (NR) has sought Partners to appoint to the Eastern Routes Partnership (ERP) framework. The ERP is the main route to market for the Eastern Region to support the delivery of projects under NR's Strategic Business Plan (SBP), as well as other projects with a core technical discipline. The geographical scope of the ERP is the Eastern Region. (https://www.networkrail.co.uk/running-the-railway/our-regions/eastern/). The initial term of the ERP is 5 years (plus a 2 month mobilisation) with an option to extend the ERP by yearly increments up to a further 5 years. The ERP comprises two levels: Generalist and Specialist. The process for allocating projects is set out at Section VI.3. NR has actively encouraged SMEs, new entrants and/or discipline experts to participate in the process for the Specialist level. For the Generalist level, NR has engaged suppliers able to take on projects with increased complexity/stakeholder management, which possess the ability to deliver the volumes required against the desired unit rates to deliver the SBP. The values for each Lot are estimates only, based on SBP budgets rather than delivery plan values. As such, they are not guaranteed and do not act as a minimum or maximum workbank value for the control period nor a guarantee as to volume split of work-type. A Partnership Agreement sits alongside the ERP and comprises NR and the Generalist contractors. Specialist contractors may join the Partnership if the ERP is extended beyond the initial 5 years. The core Partnership aims are to: a) create a collaborative environment; b) hold NR and all Partner-contractors to account; and c) undertake the efficiency challenge in delivering the ERP workbank safely. The ERP includes a pain-gain incentive mechanism, based on the difference between the Annual Actual Cost and the Annual Project Target cost. The Annual Project Target Costs are all derived from the Client's budget. A Portfolio Incentivisation Fund will also be set up at a Partnership Level, distributing savings across Partner-contractors.

### Lot Information

Lot 1

Supplier briefing event to share indicative plans across the region for future procurement activities and key strategic themes. Whilst there will not be an opportunity to ask questions during the event, please feel free to submit a question in advance which NR may or may not (at its discretion) be able to cover in the briefing. As a reminder, this is not a call for competition.

Lot 1A Generalist Buildings & Civils

The scope of work type to be delivered includes but not limited to the following:- Building/civils and associated mechanical and electrical works for: Buildings (Station & Lineside), Light Maintenance Depots, Maintenance Delivery Units, Platform, Canopies, Train sheds, Footbridges, Car Parks and roads and Asbestos contaminated buildings. Mechanical & Electrical (M&E) for: Lifts and escalators, Cable route works, Mechanical, Electrical, Depot plant, Lifts and Escalators and Cable route works Structural works for: Underbridges, Preventative Tunnel interventions, Culverts, Overbridges, Tunnel Repair, Retaining structures, Footbridges, Equipment support structures (signal posts/OLE gantries) and Scour Works Geotechnic works for: Earthwork Embankment, Condition monitoring, Earthwork Soil Cutting, Earthwork Rock Cuttings, Drainage and Off-Track. Additional information: The lot value is for guidance only and is based on the projected spend for the 10-year framework duration with estimated uplifts.

Options: The initial term of the framework will be 5 years (plus a 2 month mobilisation period) with an option, to extend in yearly increments up to a further 5 years.

Lot 1B Specialist Structures

The scope of work type to be delivered is Primarily that of Structures and associated works but may also include and not limited to the following:- Building/civils and associated mechanical and electrical works for: Buildings (Station & Lineside), Light Maintenance Depots, Maintenance Delivery Units, Platform, Canopies, Train sheds, Footbridges, Car Parks and roads and Asbestos contaminated buildings. Mechanical & Electrical (M&E) for: Lifts and escalators, Cable route works, Mechanical, Electrical, Depot plant, Lifts and Escalators and Cable route works Structural works for: Underbridges, Preventative Tunnel interventions, Culverts, Overbridges, Tunnel Repair, Retaining structures, Footbridges, Equipment support structures (signal posts/OLE gantries) and Scour Works Could include Geotechnic works for: Earthwork Embankment, Condition monitoring, Earthwork Soil Cutting, Earthwork Rock Cuttings, Drainage and Off-Track. Additional information: The lot value is for guidance only and is based on the projected spend for the 10-year framework duration with estimated uplifts.

Options: The initial term of the framework will be 5 years (plus a 2 month mobilisation period) with an option, to extend in yearly increments up to a further 5 years.

Lot 1C Specialist Geotechnical

The scope of work type to be delivered is Primarily that of Geotechnical and associated works but may also include and not limited to the following:- Building/civils and associated mechanical and electrical works for: Buildings (Station & Lineside), Light Maintenance Depots, Maintenance Delivery Units, Platform, Canopies, Train sheds, Footbridges, Car Parks and roads and Asbestos contaminated buildings. Mechanical & Electrical (M&E) for: Lifts and escalators, Cable route works, Mechanical, Electrical, Depot plant, Lifts and Escalators and Cable route works Optional Structural works for: Underbridges, Preventative Tunnel interventions, Culverts, Overbridges, Tunnel Repair, Retaining structures, Footbridges, Equipment support structures (signal posts/OLE gantries) and Scour Works Geotechnic works for: Earthwork Embankment, Condition monitoring, Earthwork Soil Cutting, Earthwork Rock Cuttings, Drainage and Off-Track. Additional information: The lot value is for guidance only and is based on the projected spend for the 10-year framework duration with estimated uplifts.

Options: The initial term of the framework will be 5 years (plus a 2 month mobilisation period) with an option, to extend in yearly increments up to a further 5 years.

Lot 2A Generalist Signaling and Telecoms

The scope of work type to be delivered includes but not limited to the following:- Interlocking & NX panels works for: Re-wire/Life extend. Route Relay Interlocking alterations to account for any new trackside works. Alterations to existing Solid State Interlockings (SSI) to account for any new trackside works. Entrance Exit (NX) panel updates. Level Crossing Predictor/Controller works for: Level crossing Life Extension Works (LEW) for all types of crossings. Level crossings renewals for all types of level crossings. Conversion of mechanical winding barriers. Transmission / Network works for: Intelligent infrastructure installations. TDM renewals. Provision of FTNX / FTNX points of presence in signaling equipment rooms (inc. REBs). Remove of obsolete equipment - transmission (CCTV, TDM & FDM). Track/Way Side (Equipment Housing, Power, Terminals, Signals, Points, Train Detection) works for: Life Extension works. Including signal conversion, location case renewal and re-wire. Intelligent infrastructure installations. Alterations to signaling power supplies. Track circuit conversions. Ground frame conversion to Ground Switch Panel (GSP) Provision of staff protection systems. Targeting component renewals - HABDs / REBs / LOCs. Cable route works including multi core cable renewals. AWS, TPWS renewal. Signaling Bonding works. Additional information: The lot value is for guidance only and is based on the projected spend for the 10-year framework duration with estimated uplifts.

Options: The initial term of the framework will be 5 years (plus a 2 month mobilisation period) with an option, to extend in yearly increments up to a further 5 years.

Lot 2B Specialist Signaling

The scope of work type to be delivered is Primarily that of Signaling and associated works but may also include and not limited to the following:- Interlocking & NX panels works for: Re-wire/Life extend. Route Relay Interlocking alterations to account for any new trackside works. Alterations to existing Solid State Interlockings (SSI) to account for any new trackside works. Entrance Exit (NX) panel updates. Level Crossing Predictor/Controller works for: Level crossing Life Extension Works (LEW) for all types of crossings. Level crossings renewals for all types of level crossings. Conversion of mechanical winding barriers. Transmission / Network works for: Intelligent infrastructure installations. TDM renewals. Provision of FTNX / FTNX points of presence in signaling equipment rooms (inc. REBs). Remove of obsolete equipment - transmission (CCTV, TDM & FDM). Track/Way Side (Equipment Housing, Power, Terminals, Signals, Points, Train Detection) works for: Life Extension works. Including signal conversion, location case renewal and re-wire. Intelligent infrastructure installations. Alterations to signaling power supplies. Track circuit conversions. Ground frame conversion to Ground Switch Panel (GSP) Provision of staff protection systems. Targeting component renewals - HABDs / REBs / LOCs. Cable route works including multi core cable renewals. AWS, TPWS renewal. Signaling Bonding works. Additional information: The lot value is for guidance only and is based on the projected spend for the 10-year framework duration with estimated uplifts.

Options: The initial term of the framework will be 5 years (plus a 2 month mobilisation period) with an option, to extend in yearly increments up to a further 5 years.

Lot 2C Specialist Telecoms

The scope of work type to be delivered is Primarily that of Telecommunications and associated works but may also include and not limited to the following:- Interlocking & NX panels works for: Re-wire/Life extend. Route Relay Interlocking alterations to account for any new trackside works. Alterations to existing Solid State Interlockings (SSI) to account for any new trackside works. Entrance Exit (NX) panel updates. Level Crossing Predictor/Controller works for: Level crossing Life Extension Works (LEW) for all types of crossings. Level crossings renewals for all types of level crossings. Conversion of mechanical winding barriers. Transmission / Network works for: Intelligent infrastructure installations. TDM renewals. Provision of FTNX / FTNX points of presence in signaling equipment rooms (inc. REBs). Remove of obsolete equipment - transmission (CCTV, TDM & FDM). Track/Way Side (Equipment Housing, Power, Terminals, Signals, Points, Train Detection) works for: Life Extension works. Including signal conversion, location case renewal and re-wire. Intelligent infrastructure installations. Alterations to signalling power supplies. Track circuit conversions. Ground frame conversion to Ground Switch Panel (GSP) Provision of staff protection systems. Targeting component renewals - HABDs / REBs / LOCs. Cable route works including multi core cable renewals. AWS, TPWS renewal. Signaling Bonding works. Additional information: The lot value is for guidance only and is based on the projected spend for the 10-year framework duration with estimated uplifts.

Options: The initial term of the framework will be 5 years (plus a 2 month mobilisation period) with an option, to extend in yearly increments up to a further 5 years.

Lot 3A Generalist Contact Systems

The scope of work type to be delivered includes but not limited to the following:- AC/DC contact systems works for: Structure renewal & refurbishment. Geotechnical assessment. Overhead Line Equipment (OLE) campaign changes (rectification of known issues). OLE re-wire. Crossover/Section insulator replacement (including potential re-design if required). Section insulator replacement. Mid-life refurbishment. Neutral section replacement (including carrier wire style neutral section design & installation). Solid conductor beam refurbishment (& bonding). OLE switch replacement. Ancillary conductor re-wire. Other Items included in the Scope: Forensic analysis (root cause analysis of failures). Isolation instructions and/or isolation diagram corrections, correlation and reviews . Legacy equipment renewal (design knowledge required) this includes Mechanically Independent Registration and any conversion of headspans. Survey e.g. drone, point cloud, etc. for structures. Tunnel renewals (fixed overhead line equipment, steelwork). Mitigations at reduced clearance locations (flashover mitigations). Traction bonding renewal. Additional information: The lot value is for guidance only and is based on the projected spend for the 10-year framework duration with estimated uplifts.

Options: The initial term of the framework will be 5 years (plus a 2 month mobilisation period) with an option, to extend in yearly increments up to a further 5 years.

Lot 3B Specialist Contact Systems

The scope of work type to be delivered includes but not limited to the following:- AC/DC contact systems works for: Structure renewal & refurbishment. Geotechnical assessment. Overhead Line Equipment (OLE) campaign changes (rectification of known issues). OLE re-wire. Crossover/Section insulator replacement (including potential re-design if required). Section insulator replacement. Mid-life refurbishment. Neutral section replacement (including carrier wire style neutral section design & installation). Solid conductor beam refurbishment (& bonding). OLE switch replacement. Ancillary conductor re-wire. Other Items included in the Scope: Forensic analysis (root cause analysis of failures). Isolation instructions and/or isolation diagram corrections, correlation and reviews . Legacy equipment renewal (design knowledge required) this includes Mechanically Independent Registration and any conversion of headspans. Survey e.g. drone, point cloud, etc. for structures. Tunnel renewals (fixed overhead line equipment, steelwork). Mitigations at reduced clearance locations (flashover mitigations). Traction bonding renewal. Additional information: The lot value is for guidance only and is based on the projected spend for the 10-year framework duration with estimated uplifts.

Options: The initial term of the framework will be 5 years (plus a 2 month mobilisation period) with an option, to extend in yearly increments up to a further 5 years.

Lot 4A Generalist Distribution & Plant

The scope of work type to be delivered includes but not limited to the following:- HV traction distribution works for: HV Substation Renewal/Refurbishment. SCADA modifications inc control room updates. OLE power connections (switch relocation / redesign). Traction derived signalling power supplies. Signalling power works for replacement of signalling power supply equipment Lighting and associated LV distribution works for: Walkway lighting and columns. Operational lighting (buffer stops etc.). Rail yard lighting and columns. Tunnel lighting. Level crossing CCTV and lighting. Other works: Lineside operational equipment and monitoring (Wheelchex/Panchex, etc). Drainage pumps and associated equipment. Low voltage and control equipment. Points heating. Control Centre power resilience. Swing bridge controls replacement. Additional information: The lot value is for guidance only and is based on the projected spend for the 10-year framework duration with estimated uplifts.

Options: The initial term of the framework will be 5 years (plus a 2 month mobilisation period) with an option, to extend in yearly increments up to a further 5 years.

Lot 4B Specialist Distribution & Plant

The scope of work type to be delivered includes but not limited to the following:- HV traction distribution works for: HV Substation Renewal/Refurbishment. SCADA modifications inc control room updates. OLE power connections (switch relocation / redesign). Traction derived signalling power supplies. Signalling power works for replacement of signalling power supply equipment Lighting and associated LV distribution works for: Walkway lighting and columns. Operational lighting (buffer stops etc.). Rail yard lighting and columns. Tunnel lighting. Level crossing CCTV and lighting. Other works: Lineside operational equipment and monitoring (Wheelchex/Panchex, etc). Drainage pumps and associated equipment. Low voltage and control equipment. Points heating. Control Centre power resilience. Swing bridge controls replacement. Additional information: The lot value is for guidance only and is based on the projected spend for the 10-year framework duration with estimated uplifts.

Options: The initial term of the framework will be 5 years (plus a 2 month mobilisation period) with an option, to extend in yearly increments up to a further 5 years.

Lot 1A Generalist Buildings & Civils

The scope of work type to be delivered includes but not limited to the following:- Building/civils and associated mechanical and electrical works for: Buildings (Station & Lineside), Light Maintenance Depots, Maintenance Delivery Units, Platform, Canopies, Train sheds, Footbridges, Car Parks and roads and Asbestos contaminated buildings. Mechanical & Electrical (M&E) for: Lifts and escalators, Cable route works, Mechanical, Electrical, Depot plant, Lifts and Escalators and Cable route works. Structural works for: Underbridges, Preventative Tunnel interventions, Culverts, Overbridges, Tunnel Repair, Retaining structures, Footbridges, Equipment support structures (signal posts/OLE gantries) and Scour Works. Geotechnical works for: Earthwork Embankment, Condition monitoring, Earthwork Soil Cutting, Earthwork Rock Cuttings, Drainage and Off-Track. Additional information: The lot value is for guidance only and is based on the projected spend for the 10-year framework duration with estimated uplifts

Options: The initial term of the framework will be 5 years (plus a 2 month mobilisation period) with an option, to extend in yearly increments up to a further 5 years.

Lot 1B Specialist Structures

The scope of work type to be delivered is Primarily that of Structures and associated works but may also include and not limited to the following:- Building/civils and associated mechanical and electrical works for: Buildings (Station & Lineside), Light Maintenance Depots, Maintenance Delivery Units, Platform, Canopies, Train sheds, Footbridges, Car Parks and roads and Asbestos contaminated buildings. Mechanical & Electrical (M&E) for: Lifts and escalators, Cable route works, Mechanical, Electrical, Depot plant, Lifts and Escalators and Cable route works. Structural works for: Underbridges, Preventative Tunnel interventions, Culverts, Overbridges, Tunnel Repair, Retaining structures, Footbridges, Equipment support structures (signal posts/OLE gantries) and Scour Works. Could include Geotechnic works for: Earthwork Embankment, Condition monitoring, Earthwork Soil Cutting, Earthwork Rock Cuttings, Drainage and Off-Track. Additional information: The lot value is for guidance only and is based on the projected spend for the 10-year framework duration with estimated uplifts.

Options: The initial term of the framework will be 5 years (plus a 2 month mobilisation period) with an option, to extend in yearly increments up to a further 5 years.

Lot 1C Specialist Geotechnical

The scope of work type to be delivered is Primarily that of Geotechnical and associated works but may also include and not limited to the following:- Building/civils and associated mechanical and electrical works for: Buildings (Station & Lineside), Light Maintenance Depots, Maintenance Delivery Units, Platform, Canopies, Train sheds, Footbridges, Car Parks and roads and Asbestos contaminated buildings. Mechanical & Electrical (M&E) for: Lifts and escalators, Cable route works, Mechanical, Electrical, Depot plant, Lifts and Escalators and Cable route works. Optional Structural works for: Underbridges, Preventative Tunnel interventions, Culverts, Overbridges, Tunnel Repair, Retaining structures, Footbridges, Equipment support structures (signal posts/OLE gantries) and Scour Works. Geotechnic works for: Earthwork Embankment, Condition monitoring, Earthwork Soil Cutting, Earthwork Rock Cuttings, Drainage and Off-Track. Additional information: The lot value is for guidance only and is based on the projected spend for the 10-year framework duration with estimated uplifts.

Options: The initial term of the framework will be 5 years (plus a 2 month mobilisation period) with an option, to extend in yearly increments up to a further 5 years.

Lot 2A Generalist Signalling and Telecoms

The scope of work type to be delivered includes but not limited to the following:- Interlocking & NX panels works for: Re-wire/Life extend. Route Relay Interlocking alterations to account for any new trackside works. Alterations to existing Solid State Interlockings (SSI) to account for any new trackside works. Entrance Exit (NX) panel updates. Level Crossing Predictor/Controller works for: Level crossing Life Extension Works (LEW) for all types of crossings. Level crossings renewals for all types of level crossings. Conversion of mechanical winding barriers. Transmission / Network works for: Intelligent infrastructure installations. TDM renewals. Provision of FTNX / FTNX points of presence in signaling equipment rooms (inc. REBs). Remove of obsolete equipment - transmission (CCTV, TDM & FDM). Track/Way Side (Equipment Housing, Power, Terminals, Signals, Points, Train Detection) works for: Life Extension works. Including signal conversion, location case renewal and re-wire. Intelligent infrastructure installations. Alterations to signaling power supplies. Track circuit conversions. Ground frame conversion to Ground Switch Panel (GSP) Provision of staff protection systems. Targeting component renewals - HABDs / REBs / LOCs. Cable route works including multi core cable renewals. AWS, TPWS renewal. Signaling Bonding works. Additional information: The lot value is for guidance only and is based on the projected spend for the 10-year framework duration with estimated uplifts

Options: The initial term of the framework will be 5 years (plus a 2 month mobilisation period) with an option, to extend in yearly increments up to a further 5 years.

Lot 2B Specialist Signaling

The scope of work type to be delivered is Primarily that of Signaling and associated works but may also include and not limited to the following:- Interlocking & NX panels works for: Re-wire/Life extend. Route Relay Interlocking alterations to account for any new trackside works. Alterations to existing Solid State Interlockings (SSI) to account for any new trackside works. Entrance Exit (NX) panel updates. Level Crossing Predictor/Controller works for: Level crossing Life Extension Works (LEW) for all types of crossings. Level crossings renewals for all types of level crossings. Conversion of mechanical winding barriers. Transmission / Network works for: Intelligent infrastructure installations. TDM renewals. Provision of FTNX / FTNX points of presence in signaling equipment rooms (inc. REBs). Remove of obsolete equipment - transmission (CCTV, TDM & FDM). Track/Way Side (Equipment Housing, Power, Terminals, Signals, Points, Train Detection) works for: Life Extension works. Including signal conversion, location case renewal and re-wire. Intelligent infrastructure installations. Alterations to signaling power supplies. Track circuit conversions. Ground frame conversion to Ground Switch Panel (GSP) Provision of staff protection systems. Targeting component renewals - HABDs / REBs / LOCs. Cable route works including multi core cable renewals. AWS, TPWS renewal. Signaling Bonding works. Additional information: The lot value is for guidance only and is based on the projected spend for the 10-year framework duration with estimated uplifts.

Options: The initial term of the framework will be 5 years (plus a 2 month mobilisation period) with an option, to extend in yearly increments up to a further 5 years.

Lot 2C Specialist Telecoms

The scope of work type to be delivered is Primarily that of Telecommunications and associated works but may also include and not limited to the following:- Interlocking & NX panels works for: Re-wire/Life extend. Route Relay Interlocking alterations to account for any new trackside works. Alterations to existing Solid State Interlockings (SSI) to account for any new trackside works. Entrance Exit (NX) panel updates. Level Crossing Predictor/Controller works for: Level crossing Life Extension Works (LEW) for all types of crossings. Level crossings renewals for all types of level crossings. Conversion of mechanical winding barriers. Transmission / Network works for: Intelligent infrastructure installations. TDM renewals. Provision of FTNX / FTNX points of presence in signaling equipment rooms (inc. REBs). Remove of obsolete equipment - transmission (CCTV, TDM & FDM). Track/Way Side (Equipment Housing, Power, Terminals, Signals, Points, Train Detection) works for: Life Extension works. Including signal conversion, location case renewal and re-wire. Intelligent infrastructure installations. Alterations to signalling power supplies. Track circuit conversions. Ground frame conversion to Ground Switch Panel (GSP) Provision of staff protection systems. Targeting component renewals - HABDs / REBs / LOCs. Cable route works including multi core cable renewals. AWS, TPWS renewal. Signaling Bonding works. Additional information: The lot value is for guidance only and is based on the projected spend for the 10-year framework duration with estimated uplifts.

Options: The initial term of the framework will be 5 years (plus a 2 month mobilisation period) with an option, to extend in yearly increments up to a further 5 years.

Lot 3A Generalist Contact Systems

The scope of work type to be delivered includes but not limited to the following:- AC/DC contact systems works for: Structure renewal & refurbishment. Geotechnical assessment. Overhead Line Equipment (OLE) campaign changes (rectification of known issues). OLE re-wire. Crossover/Section insulator replacement (including potential re-design if required). Section insulator replacement. Mid-life refurbishment. Neutral section replacement (including carrier wire style neutral section design & installation). Solid conductor beam refurbishment (& bonding). OLE switch replacement. Ancillary conductor re-wire. Other Items included in the Scope: Forensic analysis (root cause analysis of failures). Isolation instructions and/or isolation diagram corrections, correlation and reviews . Legacy equipment renewal (design knowledge required) this includes Mechanically Independent Registration and any conversion of headspans. Survey e.g. drone, point cloud, etc. for structures. Tunnel renewals (fixed overhead line equipment, steelwork). Mitigations at reduced clearance locations (flashover mitigations). Traction bonding renewal. Additional information: The lot value is for guidance only and is based on the projected spend for the 10-year framework duration with estimated uplifts.

Options: The initial term of the framework will be 5 years (plus a 2 month mobilisation period) with an option, to extend in yearly increments up to a further 5 years.

Lot 3B Specialist Contact Systems

The scope of work type to be delivered includes but not limited to the following:- AC/DC contact systems works for: Structure renewal & refurbishment. Geotechnical assessment. Overhead Line Equipment (OLE) campaign changes (rectification of known issues). OLE re-wire. Crossover/Section insulator replacement (including potential re-design if required). Section insulator replacement. Mid-life refurbishment. Neutral section replacement (including carrier wire style neutral section design & installation). Solid conductor beam refurbishment (& bonding). OLE switch replacement. Ancillary conductor re-wire. Other Items included in the Scope: Forensic analysis (root cause analysis of failures). Isolation instructions and/or isolation diagram corrections, correlation and reviews . Legacy equipment renewal (design knowledge required) this includes Mechanically Independent Registration and any conversion of headspans. Survey e.g. drone, point cloud, etc. for structures. Tunnel renewals (fixed overhead line equipment, steelwork). Mitigations at reduced clearance locations (flashover mitigations). Traction bonding renewal. Additional information: The lot value is for guidance only and is based on the projected spend for the 10-year framework duration with estimated uplifts.

Options: The initial term of the framework will be 5 years (plus a 2 month mobilisation period) with an option, to extend in yearly increments up to a further 5 years.

Lot 4A Generalist Distribution & Plant

The scope of work type to be delivered includes but not limited to the following:- HV traction distribution works for: HV Substation Renewal/Refurbishment. SCADA modifications inc control room updates. OLE power connections (switch relocation / redesign). Traction derived signalling power supplies. Signalling power works for replacement of signalling power supply equipment Lighting and associated LV distribution works for: Walkway lighting and columns. Operational lighting (buffer stops etc.). Rail yard lighting and columns. Tunnel lighting. Level crossing CCTV and lighting. Other works: Lineside operational equipment and monitoring (Wheelchex/Panchex, etc). Drainage pumps and associated equipment. Low voltage and control equipment. Points heating. Control Centre power resilience. Swing bridge controls replacement. Additional information: The lot value is for guidance only and is based on the projected spend for the 10-year framework duration with estimated uplifts.

Options: The initial term of the framework will be 5 years (plus a 2 month mobilisation period) with an option, to extend in yearly increments up to a further 5 years.

Lot 4B Specialist Distribution & Plant

The scope of work type to be delivered includes but not limited to the following:- HV traction distribution works for: HV Substation Renewal/Refurbishment. SCADA modifications inc control room updates. OLE power connections (switch relocation / redesign). Traction derived signalling power supplies. Signalling power works for replacement of signalling power supply equipment Lighting and associated LV distribution works for: Walkway lighting and columns. Operational lighting (buffer stops etc.). Rail yard lighting and columns. Tunnel lighting. Level crossing CCTV and lighting. Other works: Lineside operational equipment and monitoring (Wheelchex/Panchex, etc). Drainage pumps and associated equipment. Low voltage and control equipment. Points heating. Control Centre power resilience. Swing bridge controls replacement. Additional information: The lot value is for guidance only and is based on the projected spend for the 10-year framework duration with estimated uplifts.

Options: The initial term of the framework will be 5 years (plus a 2 month mobilisation period) with an option, to extend in yearly increments up to a further 5 years.

## Key Details

| Field | Value |
| --- | --- |
| Publication source | Find A Tender Service |
| Latest notice | https://www.find-tender.service.gov.uk/Notice/028599-2024 |
| Notice type | Planning Notice |
| Procurement type | Framework |
| Procurement category | Works |
| Procurement method | Selective |
| Procurement method details | Negotiated procedure with prior call for competition |
| Tender suitability | Not specified |
| Awardee scale | Large, SME |
| All stages | Planning, Tender, Award |

## Dates

| Field | Value |
| --- | --- |
| Publication date | 6 Sep 2024 |
| Submission deadline | 2 Jun 2023 |
| Future notice date | 8 Mar 2023 |
| Award date | 23 May 2024 |
| Contract period | Not specified |
| Recurrence | Not specified |

## Values

| Field | Value |
| --- | --- |
| Tender value | £3,500,000,000 |
| Lots value | £3,447,250,000 |
| Awards value | Not specified |
| Contracts value | £3,305,000,000 |

## Status

| Field | Value |
| --- | --- |
| Tender status | Complete |
| Lots status | Active, Cancelled, Planned |
| Awards status | Active |
| Contracts status | Active |

## Buyer

| Field | Value |
| --- | --- |
| Main buyer | NETWORK RAIL INFRASTRUCTURE LTD |
| Locality | LONDON |
| Post town | North West London |
| Postcode | NW1 2DN |
| Country | England |
| ITL 1 | TLI London |
| ITL 2 | TLI4 Inner London - East |
| ITL 3 | TLI45 Lambeth |
| Local authority | Lambeth |
| Electoral ward | Waterloo & South Bank |
| Westminster constituency | Vauxhall and Camberwell Green |
| Delivery location | Not specified |

## Supplier

| Field | Value |
| --- | --- |
| Number of suppliers | 14 |
| Supplier names | AMALGAMATED CONSTRUCTION; AMEY RAIL; ATKINSRÉALIS; BAM NUTTALL; CK RAIL SOLUTIONS; HAWTHORNE CONTRACT SERVICES; KELTBRAY RAIL; KELTBRAY RAIL LIMITED / LINBROOKE SERVICES LIMITED TOGETHER FORMING KELTBRAY LINBROOKE PARTNERSHIP (KLP; LOWERY; MORGAN SINDALL CONSTRUCTION & INFRASTRUCTURE; OCTAVIUS INFRASTRUCTURE; STORY CONTRACTING; TAZIKER INDUSTRIAL; TRACKWORK |

## CPV Codes

### Divisions

- 45 - Construction work
- 71 - Architectural, construction, engineering and inspection services

### Codes

- 45000000 - Construction work
- 45100000 - Site preparation work
- 45200000 - Works for complete or part construction and civil engineering work
- 45210000 - Building construction work
- 45213320 - Construction work for buildings relating to railway transport
- 45213321 - Railway station construction work
- 45221112 - Railway bridge construction work
- 45232210 - Overhead line construction
- 45232332 - Ancillary works for telecommunications
- 45234000 - Construction work for railways and cable transport systems
- 45234115 - Railway signalling works
- 45234116 - Track construction works
- 45300000 - Building installation work
- 45314000 - Installation of telecommunications equipment
- 45315400 - High voltage installation work
- 45315600 - Low-voltage installation work
- 45317300 - Electrical installation work of electrical distribution apparatus
- 71311230 - Railway engineering services
- 71332000 - Geotechnical engineering services

## Release History

- 6 Sep 2024 at 11:48 - Award - Award Notice - https://www.find-tender.service.gov.uk/Notice/028599-2024
- 21 Apr 2023 at 15:06 - Tender - Tender Notice - https://www.find-tender.service.gov.uk/Notice/011567-2023
- 1 Mar 2023 at 22:02 - Planning - Planning Notice - https://www.find-tender.service.gov.uk/Notice/006078-2023

## Notice URLs

- http://www.networkrail.com
- https://networkrail.bravosolution.co.uk/esop/toolkit/opportunity/current/55866/detail.si
- https://networkrail.bravosolution.co.uk/web/login.html
- https://networkrail.bravosolution.co.uk/web/login.html.
- https://www.networkrail.co.uk/running-the-railway/our-regions/eastern/

## Provenance

This Markdown file is an alternate public rendering of the D3 Tenders contract record. The canonical page is https://d3tenders.com/contract/?ocid=ocds-h6vhtk-03ad6c. The underlying structured data is available as OCDS JSON at https://d3tenders.com/contract/ocds-h6vhtk-03ad6c.json.
