---
title: "UKRI-3443 Battery Energy Storage System for the ASPIRE-II Project"
ocid: "ocds-h6vhtk-042951"
canonical_url: "https://d3tenders.com/contract/?ocid=ocds-h6vhtk-042951"
markdown_url: "https://d3tenders.com/contract/ocds-h6vhtk-042951.md"
json_url: "https://d3tenders.com/contract/ocds-h6vhtk-042951.json"
source: "Find A Tender Service"
current_stage: "Tender"
buyer: "UK RESEARCH & INNOVATION"
published: "2023-12-21"
---

# UKRI-3443 Battery Energy Storage System for the ASPIRE-II Project

Buyer: UK RESEARCH & INNOVATION  
Current stage: Tender  
OCID: ocds-h6vhtk-042951

[View canonical contract page](https://d3tenders.com/contract/?ocid=ocds-h6vhtk-042951)  
[Download OCDS JSON](https://d3tenders.com/contract/ocds-h6vhtk-042951.json)

## Summary

The UK Research & Innovation is inviting tenders for the procurement of a Battery Energy Storage System for the ASPIRE-II Project. The procurement process is currently in the active planning stage. The contract value is £250,000 GBP, with the tender period ending on 25th January 2024. The contracting authority is located in Swindon, United Kingdom, and the industry category is "Batteries".

This tender opportunity for the Battery Energy Storage System presents an opening for businesses, specifically those involved in renewable energy solutions and manufacturing of battery systems. Small and medium enterprises (SMEs) are encouraged to participate in the procurement process. The submission method is written, with details available on the UK Research & Innovation website. The project aims to demonstrate ammonia production powered by renewable energy sources, fostering innovation and sustainability in the energy sector.

## Notice

The ASPIRE II project aims to create an Ammonia Synthesis Plant powered solely by renewable energy. It aims to prove the plant's reliability in off-grid settings with varying climates. Featuring four main subsystems and the capability to adjust ammonia production based on available renewable power, the Battery Energy Storage System (BESS) seeks to manage fluctuations between plant consumption and variable renewable energy sources.

### Lot Information

Lot 1

The Ammonia Synthesis Plant using Intermittent Renewable Energy 2 (ASPIRE II) project is a demonstration plant which will be built to generate green ammonia using only renewable energy sources. The goal of the project is to prove the system can operate reliably in off grid locations with varying climates. The plant includes four main subsystems, a nitrogen generator, a hydrogen generator, a flexible ammonia synthesis loop and a thermal store. A key requirement of the plant is that the ammonia production rate can be flexed in proportion to the available renewable power. The response rate of the largest load, the electrolyser, is of the order 2 seconds and consumes some 80% of the energy required for the plant. This response rate is key to facilitating tracking of the renewable power however we expect some imbalance between plant power consumption and available renewable power especially when the available renewable power fluctuates rapidly. We envisage the BESS will bridge these imbalances and that the charge status of the BESS will be used as a signal to control the plant generation rate. The demonstrator will be built at the Rutherford Appleton Laboratory in Oxfordshire.

## Key Details

| Field | Value |
| --- | --- |
| Publication source | Find A Tender Service |
| Latest notice | https://www.find-tender.service.gov.uk/Notice/037737-2023 |
| Notice type | Tender Notice |
| Procurement type | Standard |
| Procurement category | Goods |
| Procurement method | Open |
| Procurement method details | Open procedure |
| Tender suitability | Not specified |
| Awardee scale | Not specified |
| All stages | Tender |

## Dates

| Field | Value |
| --- | --- |
| Publication date | 21 Dec 2023 |
| Submission deadline | 25 Jan 2024 |
| Future notice date | Not specified |
| Award date | Not specified |
| Contract period | Not specified |
| Recurrence | Not specified |

## Values

| Field | Value |
| --- | --- |
| Tender value | £250,000 |
| Lots value | £250,000 |
| Awards value | Not specified |
| Contracts value | Not specified |

## Status

| Field | Value |
| --- | --- |
| Tender status | Active |
| Lots status | Active |
| Awards status | Not specified |
| Contracts status | Not specified |

## Buyer

| Field | Value |
| --- | --- |
| Main buyer | UK RESEARCH & INNOVATION |
| Locality | SWINDON |
| Post town | Swindon |
| Postcode | SN2 1FL |
| Country | England |
| ITL 1 | TLK South West (England) |
| ITL 2 | TLK7 Gloucestershire and Wiltshire |
| ITL 3 | TLK71 Swindon |
| Local authority | Swindon |
| Electoral ward | Rodbourne Cheney |
| Westminster constituency | Swindon North |
| Delivery location | TLJ14 Oxfordshire CC |

## CPV Codes

### Divisions

- 31 - Electrical machinery, apparatus, equipment and consumables; lighting

### Codes

- 31440000 - Batteries

## Release History

- 21 Dec 2023 at 16:06 - Tender - Tender Notice - https://www.find-tender.service.gov.uk/Notice/037737-2023

## Notice URLs

- http://www.ukri.org
- https://ukri.delta-esourcing.com
- https://ukri.delta-esourcing.com/respond/H857SYYG9Z
- https://ukri.delta-esourcing.com/tenders/UK-UK-Swindon:-Batteries./H857SYYG9Z

## Provenance

This Markdown file is an alternate public rendering of the D3 Tenders contract record. The canonical page is https://d3tenders.com/contract/?ocid=ocds-h6vhtk-042951. The underlying structured data is available as OCDS JSON at https://d3tenders.com/contract/ocds-h6vhtk-042951.json.
