# Freeze Dryer Phase II

Buyer: MHRA  
Current stage: Tender  
OCID: ocds-h6vhtk-045066

[View canonical contract page](https://d3tenders.com/contract/?ocid=ocds-h6vhtk-045066)  
[Download OCDS JSON](https://d3tenders.com/contract/ocds-h6vhtk-045066.json)

## Summary

The MHRA, Ministry of Health, has issued a tender titled "Freeze Dryer Phase II" for hardware consultancy services. The procurement process is currently in the tender stage. The value of the contract is £600,000 GBP, with a contract period of 1080 days. The tender deadline is April 15, 2024. The location for delivery is NIBSC, Potters Bar, Hertfordshire, UK, and the industry category is services.

This procurement opportunity presents a chance for businesses offering hardware consultancy services to engage with the MHRA. The tender evaluation criteria include quality, social value, and pricing considerations. The procurement method is selective, following a competitive procedure with negotiation. Successful bidders will have the opportunity to provide ongoing contract support beyond the warranty period. The anticipated contract start date is June 24, 2024, offering long-term growth prospects for qualified suppliers.

## Notice

To replace the PLC hardware for CS15 and CS150 with up-to-date equivalents that align with the Schneider upgrade path.
To replace the HMI hardware for CS15 and CS150 with up-to-date equivalents that align with those used in Phase 1.
To recreate the functionality of CS15 and CS150 PLCs like-for-like following the Schneider upgrade path.
To re-create the CS15 and CS150 HMIs and allow for development of further requirement defined in collaboration with the MHRA.

### Lot Information

Lot 1

To replace the PLC hardware for CS15 and CS150 with up-to-date equivalents that align with the Schneider upgrade path.
To replace the HMI hardware for CS15 and CS150 with up-to-date equivalents that align with those used in Phase 1.
To recreate the functionality of CS15 and CS150 PLCs like-for-like following the Schneider upgrade path.
To re-create the CS15 and CS150 HMIs and allow for development of further requirement defined in collaboration with the MHRA.
1. Project Definition
- All parties to agree scope and ensure that everything is available for project commencement. 
- MHRA to provide any existing software backups (PLC / SCADA source code).
- For software that is not available (such as the HMI), the supplier is expected to work with the MHRA to develop the requirements for the HMI.
- Both parties to agree deliverable format (e.g. schematic updates).
2. Part Selection
- Using the information gathered at the project definition stage, the supplier will select updated hardware and software packages for the PLCs, HMIs, SCADAs, data historian and anti-virus software.
3. Electrical Design
- With appropriate parts selected, the supplier will need to assess how the electrical design will be impacted by the proposed changes.
- These impacts should be minimised wherever possible.
- However, if changes are required, the supplier will need to modify any schematics while aligning with appropriate standards.
4. Software Development
- Software development for the PLC, HMI, SCADA and Data Historian can be started following on from part selection.
- This will require the supplier to migrate functionality where possible.
- Where the code cannot be migrated, the functionality will need to be replicated.
- The HMI should be re-built to meet the requirements based on existing SCADA screens and workshops held with MHRA operators.
5. FAT (Factory Acceptance Testing)
- The control cabinets and associated hardware shall not be moved from the MHRA facility.
- FAT is expected to test as much of the new software and hardware as possible without replicating site hardware.
6. Plant Upgrades
- This will include the MHRA ensuring that appropriate ethernet connection shall be made available and new virtual machines are available.
7. SAT (Site Acceptance Testing)
- SAT will need to be staggered to reduce any concurrent downtime to the freeze dryers. This will require testing and commissioning only one freeze dryer at a time.
- SAT is expected to test all software and hardware associated with the replacement hardware and the existing site hardware.
8. On-going contract Support
- Support is expected for the warranty of the system following from SAT and moving onto general support for the years following the warranty end.
- During these periods, the supplier is expected to ensure that recommend patches will not cause un-planned downtime.
- It is desired that the supplier can also provide support for the Phase 1 system (CS100).

Options: Agency will have one twelve month extension option

## Key Details

| Field | Value |
| --- | --- |
| Publication source | Find A Tender Service |
| Latest notice | https://www.find-tender.service.gov.uk/Notice/011295-2024 |
| Notice type | Planning Notice |
| Procurement type | Standard |
| Procurement category | Services |
| Procurement method | Selective |
| Procurement method details | Competitive procedure with negotiation |
| Tender suitability | Not specified |
| Awardee scale | Not specified |
| All stages | Planning, Tender |

## Dates

| Field | Value |
| --- | --- |
| Publication date | 8 Apr 2024 |
| Submission deadline | 15 Apr 2024 |
| Future notice date | Not specified |
| Award date | Not specified |
| Contract period | Not specified |
| Recurrence | Not specified |

## Values

| Field | Value |
| --- | --- |
| Tender value | £600,000 |
| Lots value | £500,000 |
| Awards value | Not specified |
| Contracts value | Not specified |

## Status

| Field | Value |
| --- | --- |
| Tender status | Active |
| Lots status | Active |
| Awards status | Not specified |
| Contracts status | Not specified |

## Buyer

| Field | Value |
| --- | --- |
| Main buyer | MHRA |
| Locality | LONDON |
| Post town | East London |
| Postcode | E14 4PU |
| Country | England |
| ITL 1 | TLI London |
| ITL 2 | TLI4 Inner London - East |
| ITL 3 | TLI42 Tower Hamlets |
| Local authority | Tower Hamlets |
| Electoral ward | Canary Wharf |
| Westminster constituency | Poplar and Limehouse |
| Delivery location | TLH23 Hertfordshire CC |

## CPV Codes

### Divisions

- 42 - Industrial machinery
- 72 - IT services: consulting, software development, Internet and support

### Codes

- 42961200 - Scada or equivalent system
- 72100000 - Hardware consultancy services

## Release History

- 8 Apr 2024 at 14:25 - Planning - Planning Notice - https://www.find-tender.service.gov.uk/Notice/011295-2024

## Notice URLs

- https://health-family.force.com/s/Welcome
- https://www.cedr.com/
- https://www.gov.uk/
- https://www.gov.uk/government/organisations/medicines-and-healthcare-products-regulatory-agency

## Provenance

This Markdown file is an alternate public rendering of the D3 Tenders contract record. The canonical page is https://d3tenders.com/contract/?ocid=ocds-h6vhtk-045066. The underlying structured data is available as OCDS JSON at https://d3tenders.com/contract/ocds-h6vhtk-045066.json.