title: "DfI TRAM T-1151 Interim Surfacing Framework"
ocid: "ocds-h6vhtk-04e593"
canonical_url: "https://d3tenders.com/contract/?ocid=ocds-h6vhtk-04e593"
markdown_url: "https://d3tenders.com/contract/ocds-h6vhtk-04e593.md"
json_url: "https://d3tenders.com/contract/ocds-h6vhtk-04e593.json"
source: "Find A Tender Service"
current_stage: "Award"
buyer: "DFI TRANSPORT AND ROAD ASSET MANAGEMENT TRAM"
published: "2025-11-13"
---

# DfI TRAM T-1151 Interim Surfacing Framework

Buyer: DFI TRANSPORT AND ROAD ASSET MANAGEMENT TRAM  
Current stage: Award  
OCID: ocds-h6vhtk-04e593

[View canonical contract page](https://d3tenders.com/contract/?ocid=ocds-h6vhtk-04e593)  
[Download OCDS JSON](https://d3tenders.com/contract/ocds-h6vhtk-04e593.json)

## Summary

The Department for Infrastructure (DfI) has successfully completed the procurement process for the "DfI TRAM T-1151 Interim Surfacing Framework," a significant project under the works category focusing on road asset maintenance and civil engineering in Northern Ireland. This open procedure resulted in frameworks covering areas such as Strabane, Armagh, Derry, Banbridge and Craigavon, Fermanagh, and Ards and North Down, with the overall contract value totalling £95 million. Key activities include asphalt surfacing, street furniture adjustment, and carriageway drainage improvements, with contracts signed on 12 November 2025 and 3 September 2025 for different lots. The framework covers six areas with values ranging from £50,000 to £5 million, ensuring competitive procurement and enabling multiple suppliers to work within defined geographic locations.

This framework presents expansive growth opportunities for companies in the construction and civil engineering sectors, particularly those with capabilities in road surfacing and infrastructure enhancement. The procurement restricted individual suppliers to a maximum number of lots, promoting healthy competition and diversification. This framework is especially attractive for SMEs as they are encouraged to participate in multiple lot tenders. Companies involved in interim asphalt surfacing, traffic management, and related road maintenance services will find numerous chances to secure consistent work across Northern Ireland, fostering business growth and market presence. The awarded contracts reflect a balance of quality, social value, and cost considerations, offering a dynamic environment for both established and smaller firms to thrive.

## Notice

RAM Interim Surfacing Framework will include the following work activities: laying various types of asphalt surfacing by mechanical means and by hand; reshaping of carriageways; adjustment of street furniture to new levels; adjustment/provision of kerblines; adjustment/provision of carriageway drainage systems; Temporary Traffic Management; road marking/studs; and other associated ancillary works. The Framework will comprise of six area Lots (Works Orders valued PS50k to PS750k) and a Project Lot (projects valued PS750k to PS5m) covering the following areas: - ISF W4 - Strabane; - ISF S3 - Armagh; - ISF W6 - Derry; - ISF S4 - Banbridge and Craigavon; - ISF W7 - Fermanagh; and - ISF S5 - Ards and North Down.

### Lot Information

ISF P1 Projects Lot

RAM Interim Surfacing Framework will include the following work activities: laying various types of asphalt surfacing by mechanical means and by hand; reshaping of carriageways; adjustment of street furniture to new levels; adjustment/provision of kerblines; adjustment/provision of carriageway drainage systems; Temporary Traffic Management; road marking/studs; and other associated ancillary works. The Framework will comprise of six area Lots (Works Orders valued PS50k to PS750k) and a Project Lot (projects valued PS750k to PS5m) covering the following areas: - ISF W4 - Strabane; - ISF S3 - Armagh; - ISF W6 - Derry; - ISF S4 - Banbridge and Craigavon; - ISF W7 - Fermanagh; and - ISF S5 - Ards and North Down.

Renewal: Initial duration is 27 months, there is an option to extend this contract up to a maximum of 3 months at the discretion of the Contracting Authority.

ISF S4 Banbridge and Craigavon

RAM Interim Surfacing Framework will include the following work activities: laying various types of asphalt surfacing by mechanical means and by hand; reshaping of carriageways; adjustment of street furniture to new levels; adjustment/provision of kerblines; adjustment/provision of carriageway drainage systems; Temporary Traffic Management; road marking/studs; and other associated ancillary works. The Framework will comprise of six area Lots (Works Orders valued PS50k to PS750k) and a Project Lot (projects valued PS750k to PS5m) covering the following areas: - ISF W4 - Strabane; - ISF S3 - Armagh; - ISF W6 - Derry; - ISF S4 - Banbridge and Craigavon; - ISF W7 - Fermanagh; and - ISF S5 - Ards and North Down.

Options: If the Authority is unable, for any reason, to award new Frameworks or to put in place an alternative regime to replace a Framework on its termination or expiry, any Call-Off Contract established under the Framework may be extended beyond the stated maximum contract term for a further period or periods up to a maximum of three additional months.

Renewal: Initial duration is 25 months, there is an option to extend this contract up to a maximum of 3 months at the discretion of the Contracting Authority.

ISF S3 Armagh

RAM Interim Surfacing Framework will include the following work activities: laying various types of asphalt surfacing by mechanical means and by hand; reshaping of carriageways; adjustment of street furniture to new levels; adjustment/provision of kerblines; adjustment/provision of carriageway drainage systems; Temporary Traffic Management; road marking/studs; and other associated ancillary works. The Framework will comprise of six area Lots (Works Orders valued PS50k to PS750k) and a Project Lot (projects valued PS750k to PS5m) covering the following areas: - ISF W4 - Strabane; - ISF S3 - Armagh; - ISF W6 - Derry; - ISF S4 - Banbridge and Craigavon; - ISF W7 - Fermanagh; and - ISF S5 - Ards and North Down.

Options: If the Authority is unable, for any reason, to award new Frameworks or to put in place an alternative regime to replace a Framework on its termination or expiry, any Call-Off Contract established under the Framework may be extended beyond the stated maximum contract term for a further period or periods up to a maximum of three additional months.

Renewal: Initial duration is 15 months, there is an option to extend this contract up to a maximum of 3 months at the discretion of the Contracting Authority.

ISF W7 Fermanagh

RAM Interim Surfacing Framework will include the following work activities: laying various types of asphalt surfacing by mechanical means and by hand; reshaping of carriageways; adjustment of street furniture to new levels; adjustment/provision of kerblines; adjustment/provision of carriageway drainage systems; Temporary Traffic Management; road marking/studs; and other associated ancillary works. The Framework will comprise of six area Lots (Works Orders valued PS50k to PS750k) and a Project Lot (projects valued PS750k to PS5m) covering the following areas: - ISF W4 - Strabane; - ISF S3 - Armagh; - ISF W6 - Derry; - ISF S4 - Banbridge and Craigavon; - ISF W7 - Fermanagh; and - ISF S5 - Ards and North Down.

Options: If the Authority is unable, for any reason, to award new Frameworks or to put in place an alternative regime to replace a Framework on its termination or expiry, any Call-Off Contract established under the Framework may be extended beyond the stated maximum contract term for a further period or periods up to a maximum of three additional months.

Renewal: Initial duration is 22 months, there is an option to extend this contract up to a maximum of 3 months at the discretion of the Contracting Authority.

ISF S5 Ards and North Down

RAM Interim Surfacing Framework will include the following work activities: laying various types of asphalt surfacing by mechanical means and by hand; reshaping of carriageways; adjustment of street furniture to new levels; adjustment/provision of kerblines; adjustment/provision of carriageway drainage systems; Temporary Traffic Management; road marking/studs; and other associated ancillary works. The Framework will comprise of six area Lots (Works Orders valued PS50k to PS750k) and a Project Lot (projects valued PS750k to PS5m) covering the following areas: - ISF W4 - Strabane; - ISF S3 - Armagh; - ISF W6 - Derry; - ISF S4 - Banbridge and Craigavon; - ISF W7 - Fermanagh; and - ISF S5 - Ards and North Down.

Options: If the Authority is unable, for any reason, to award new Frameworks or to put in place an alternative regime to replace a Framework on its termination or expiry, any Call-Off Contract established under the Framework may be extended beyond the stated maximum contract term for a further period or periods up to a maximum of three additional months.

Renewal: Initial duration is 22 Months, there is an option to extend this contract up to a maximum of 3 months at the discretion of the Contracting Authority.

ISF W6 Derry

RAM Interim Surfacing Framework will include the following work activities: laying various types of asphalt surfacing by mechanical means and by hand; reshaping of carriageways; adjustment of street furniture to new levels; adjustment/provision of kerblines; adjustment/provision of carriageway drainage systems; Temporary Traffic Management; road marking/studs; and other associated ancillary works. The Framework will comprise of six area Lots (Works Orders valued PS50k to PS750k) and a Project Lot (projects valued PS750k to PS5m) covering the following areas: - ISF W4 - Strabane; - ISF S3 - Armagh; - ISF W6 - Derry; - ISF S4 - Banbridge and Craigavon; - ISF W7 - Fermanagh; and - ISF S5 - Ards and North Down.

Options: If the Authority is unable, for any reason, to award new Frameworks or to put in place an alternative regime to replace a Framework on its termination or expiry, any Call-Off Contract established under the Framework may be extended beyond the stated maximum contract term for a further period or periods up to a maximum of three additional months.

Renewal: Initial duration is 15 months, there is an option to extend this contract up to a maximum of 3 months at the discretion of the Contracting Authority.

ISF W4 Strabane

RAM Interim Surfacing Framework will include the following work activities: laying various types of asphalt surfacing by mechanical means and by hand; reshaping of carriageways; adjustment of street furniture to new levels; adjustment/provision of kerblines; adjustment/provision of carriageway drainage systems; Temporary Traffic Management; road marking/studs; and other associated ancillary works. The Framework will comprise of six area Lots (Works Orders valued PS50k to PS750k) and a Project Lot (projects valued PS750k to PS5m) covering the following areas: - ISF W4 - Strabane; - ISF S3 - Armagh; - ISF W6 - Derry; - ISF S4 - Banbridge and Craigavon; - ISF W7 - Fermanagh; and - ISF S5 - Ards and North Down.

Options: If the Authority is unable, for any reason, to award new Frameworks or to put in place an alternative regime to replace a Framework on its termination or expiry, any Call-Off Contract established under the Framework may be extended beyond the stated maximum contract term for a further period or periods up to a maximum of three additional months.

Renewal: Initial duration is 15 months, there is an option to extend this contract up to a maximum of 3 months at the discretion of the Contracting Authority.

## Key Details

| Field | Value |
| --- | --- |
| Publication source | Find A Tender Service |
| Latest notice | https://www.find-tender.service.gov.uk/Notice/073374-2025 |
| Notice type | Tender Notice |
| Procurement type | Framework |
| Procurement category | Works |
| Procurement method | Open |
| Procurement method details | Open procedure |
| Tender suitability | Not specified |
| Awardee scale | Large, SME |
| All stages | Tender, Award |

## Dates

| Field | Value |
| --- | --- |
| Publication date | 13 Nov 2025 |
| Submission deadline | 16 Apr 2025 |
| Future notice date | Not specified |
| Award date | 2 Sep 2025 |
| Contract period | Not specified |
| Recurrence | Not specified |

## Values

| Field | Value |
| --- | --- |
| Tender value | £95,000,000 |
| Lots value | £95,000,000 |
| Awards value | Not specified |
| Contracts value | £95,000,000 |

## Status

| Field | Value |
| --- | --- |
| Tender status | Complete |
| Lots status | Cancelled |
| Awards status | Active |
| Contracts status | Active |

## Buyer

| Field | Value |
| --- | --- |
| Main buyer | DFI TRANSPORT AND ROAD ASSET MANAGEMENT TRAM |
| Additional buyers | DEPARTMENT FOR INFRASTRUCTURE |
| Locality | BELFAST |
| Post town | Northern Ireland |
| Postcode | BT7 2JA |
| Country | Northern Ireland |
| ITL 1 | TLN Northern Ireland |
| ITL 2 | TLN0 Northern Ireland |
| ITL 3 | TLN06 Belfast |
| Local authority | Belfast |
| Electoral ward | Central |
| Westminster constituency | Belfast South and Mid Down |
| Delivery location | TLN0 Northern Ireland, TLN07 Armagh City, Banbridge and Craigavon, TLN09 Ards and North Down, TLN0A Derry City and Strabane, TLN0G Fermanagh and Omagh |

## Supplier

| Field | Value |
| --- | --- |
| Number of suppliers | 6 |
| Supplier names | FP MCCANN; GIBSON QUARRIES BANBRIDGE; JOHN MCQUILLAN CONTRACTS; NORTHSTONE MATERIALS; PATRICK KEENAN; WHITEMOUNTAIN QUARRIES LTD T/A BREEDON |

## CPV Codes

### Divisions

- 45 - Construction work

### Codes

- 45200000 - Works for complete or part construction and civil engineering work
- 45230000 - Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork

## Release History

- 13 Nov 2025 at 08:58 - Award - Award Notice - https://www.find-tender.service.gov.uk/Notice/073374-2025
- 18 Apr 2025 at 08:35 - Tender - Tender Notice - https://www.find-tender.service.gov.uk/Notice/006430-2025
- 18 Apr 2025 at 08:35 - TenderUpdate - Tender Notice - https://www.find-tender.service.gov.uk/Notice/016082-2025
- 8 Apr 2025 at 08:15 - TenderUpdate - Tender Notice - https://www.find-tender.service.gov.uk/Notice/013530-2025

## Notice URLs

- https://etendersni.gov.uk/epps
- https://www.infrastructure-ni.gov.uk/publications/department-infrastructure-roads-works-and-maintenance-procurementenhancementprogramme

## Provenance

This Markdown file is an alternate public rendering of the D3 Tenders contract record. The canonical page is https://d3tenders.com/contract/?ocid=ocds-h6vhtk-04e593. The underlying structured data is available as OCDS JSON at https://d3tenders.com/contract/ocds-h6vhtk-04e593.json.