# Scheme Delivery Framework 2

Buyer: NATIONAL HIGHWAYS  
Current stage: Tender  
OCID: ocds-h6vhtk-0515f3

[View canonical contract page](https://d3tenders.com/contract/?ocid=ocds-h6vhtk-0515f3)  
[Download OCDS JSON](https://d3tenders.com/contract/ocds-h6vhtk-0515f3.json)

## Summary

The procurement process initiated by National Highways, titled "Scheme Delivery Framework 2 (SDF2)," is designed to enhance and maintain the Strategic Road Network (SRN) across the United Kingdom, comprising over 4,500 miles of essential motorways and A roads. The ongoing initiative is currently at the tender stage, following an active status as of 29th September 2025. With a project value of approximately £14.5 billion, SDF2 represents a substantial commitment to the improvements of major infrastructure over an eight-year period, starting from 15th September 2027. This tender covers numerous locations across the UK, targeting a broad range of construction and maintenance activities, particularly in the construction work for highways and roads within the CPV code 45000000 category. Business stakeholders should note that the expression of interest deadline is set for 14th November 2025, with the final award slated for 1st June 2027.

This expansive framework contract, managed through the Competitive Flexible Procedure, offers promising opportunities for various types of businesses, particularly those specialising in construction, civil engineering, and maintenance services of roads and related infrastructure. Small and medium-sized enterprises (SMEs) and voluntary, community and social enterprises (VCSEs) are encouraged to participate due to its inclusive approach. The procurement process involves both open and selective methodologies, providing ample chances for innovation and long-term strategic partnerships. Suppliers capable of delivering high-quality infrastructure solutions, including innovative technologies and sustainable practices, stand to gain significantly by becoming preferred partners in this high-value, multi-lot framework agreement. The project's strategic importance and sheer scale present substantial growth potential, making it an attractive prospect for businesses aiming to leave a notable mark on the UK's transport infrastructure landscape.

## Notice

National Highways Scheme Delivery Framework 2 (SDF2) will play a pivotal role in renewing and enhancing England's Strategic Road Network (SRN). Covering over 4,500 miles of motorways and major A roads, the SRN is a vital component of the UK's transport infrastructure, carrying a third of all traffic and two-thirds of freight. SDF2 is designed to ensure this network remains dependable, durable, and safe, while also delivering value for money. SDF2 builds on the foundations of its predecessor frameworks - the original Scheme Delivery Framework (SDF) and the Pavement Delivery Framework (PDF). With an estimated value of PS14.5 billion and a projected 8-year duration, SDF2 represents a significant investment in the future of the UK's road infrastructure. The framework will focus on renewing and maintaining existing assets, with a strong emphasis on collaboration, standardisation, and productivity. It aims to focus spending on long-term asset improvements rather than temporary fixes, while simplifying commercial models to reduce administrative burden. SDF2 will be an enabled framework to facilitate usage by Lower Thames Crossing (LTC) and Maintenance and Response (M&R) suppliers. The new framework represents a forward-looking approach by National Highways aimed at delivering high-quality, efficient infrastructure projects that align with the evolving needs of stakeholders and road users. While the SDF has facilitated numerous successful projects across the SRN, the SDF2 is expected to build on this foundation with innovations and improvements that respond to emerging demands in safety, transport and sustainability. In late 2024, National Highways held an extensive round of preliminary market engagement, consisting of six face-to-face workshops and two online events, designed to incorporate input from the supply chain. The feedback gathered at market engagement informed the development of the SDF2 strategy, and material from the events can be found here: https://highways.sharepoint.com/:f:/s/NationalHighwaysProcurement-MaterialforExternalRelease/EjbLGgLNyFFKiYPsSEatBR4BI28Sv1e4-xZToGq2cfyZ9g?e=3Tx80E For more information on the operation of SDF2, please refer to the Information Memorandum.

### Lot Information

Main Contractor (National)

This Lot 1 is for more complex Work Orders for which the Client requires a single prime supplier to both deliver (via self-delivery and sub-contracts) and manage schemes which could include any or all of the scope for other Lots (excluding the design Lots), including the option to deliver scheme(s) as design & build. The Lot covers the supply of products, materials, plant, equipment and people to carry out construction, removal activities and Framework Mobilisation. The procurement procedure for this Lot will be Process 1.

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

General Civils, Drainage & Concrete (North East)

This Lot (2/NE) covers the supply of products, materials, plant, equipment and people to carry out construction and removal activities, including: * highway drainage assets, * pipes, * ditches, * swales, * ponds, * the control and disposal of contaminated material, * associated technology works, * earthworks, * ducting, * kerbing, * footways, * rigid pavement, * retexturing of exposed concrete pavement, * site clearance, * brick, block and stonework, * piling, * temporary works required to ensure a safe method of working, * demolition, * structural steelworks, * reinforced earth abutments, * wingwalls, * retaining walls, * concrete, * asbestos removal (planned), * earthwork stabilisation, * counterfort drains, * soil nailing, * grounder anchors, * slope netting (rock and soil), * rock slope works including dowels, bolts, scaling, buttressing, dentition, shotcrete, and * 'innovative' stabilisation techniques, such as electrokinetic osmosis, fibre reinforced soil, soil mixing and the use of geosynthetics to reinforce soil. This Lot covers all works related to drainage as defined by series 500 of the "Manual of Contract Documents for Highway Works Volume 1 Specification for Highway Works" (or any subsequent iteration). This Lot covers delivery and management of all other Lot areas excluding Lot 1 (Main Contractor), Lot 4 (Tunnels), Lot 5.1 (Technology Design) and Lot 5.2 (Design). Other duties This lot also includes the following activities * the delivery and management of works associated with or ancillary to the activities set out above, * design of their works (optional) * Framework Mobilisation, * mobilisation for the purpose of the activities set out above, * pre-construction services, * early engagement, * undertaking the principal contractor role as required by the Client, * undertaking the principal designer role as required by the Client (optional), * undertaking the lead contractor role as required by any Work Order, * the provision of welfare facilities, * the management of network occupancy, * community and * the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 2 is 20.

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

General Civils, Drainage & Concrete (North West)

This Lot (2/NW) covers the supply of products, materials, plant, equipment and people to carry out construction and removal activities, including: * highway drainage assets, * pipes, * ditches, * swales, * ponds, * the control and disposal of contaminated material, * associated technology works, * earthworks, * ducting, * kerbing, * footways, * rigid pavement, * retexturing of exposed concrete pavement, * site clearance, * brick, block and stonework, * piling, * temporary works required to ensure a safe method of working, * demolition, * structural steelworks, * reinforced earth abutments, * wingwalls, * retaining walls, * concrete, * asbestos removal (planned), * earthwork stabilisation, * counterfort drains, * soil nailing, * grounder anchors, * slope netting (rock and soil), * rock slope works including dowels, bolts, scaling, buttressing, dentition, shotcrete, and * 'innovative' stabilisation techniques, such as electrokinetic osmosis, fibre reinforced soil, soil mixing and the use of geosynthetics to reinforce soil. This Lot covers all works related to drainage as defined by series 500 of the "Manual of Contract Documents for Highway Works Volume 1 Specification for Highway Works" (or any subsequent iteration). This Lot covers delivery and management of all other Lot areas excluding Lot 1 (Main Contractor), Lot 4 (Tunnels), Lot 5.1 (Technology Design) and Lot 5.2 (Design). Other duties This lot also includes the following activities * the delivery and management of works associated with or ancillary to the activities set out above, * design of their works (optional) * Framework Mobilisation, * mobilisation for the purpose of the activities set out above, * pre-construction services, * early engagement, * undertaking the principal contractor role as required by the Client, * undertaking the principal designer role as required by the Client (optional), * undertaking the lead contractor role as required by any Work Order, * the provision of welfare facilities, * the management of network occupancy, * community and * the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 2 is 20.

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

General Civils, Drainage & Concrete (South East)

This Lot (2/SE) covers the supply of products, materials, plant, equipment and people to carry out construction and removal activities, including: * highway drainage assets, * pipes, * ditches, * swales, * ponds, * the control and disposal of contaminated material, * associated technology works, * earthworks, * ducting, * kerbing, * footways, * rigid pavement, * retexturing of exposed concrete pavement, * site clearance, * brick, block and stonework, * piling, * temporary works required to ensure a safe method of working, * demolition, * structural steelworks, * reinforced earth abutments, * wingwalls, * retaining walls, * concrete, * asbestos removal (planned), * earthwork stabilisation, * counterfort drains, * soil nailing, * grounder anchors, * slope netting (rock and soil), * rock slope works including dowels, bolts, scaling, buttressing, dentition, shotcrete, and * 'innovative' stabilisation techniques, such as electrokinetic osmosis, fibre reinforced soil, soil mixing and the use of geosynthetics to reinforce soil. This Lot covers all works related to drainage as defined by series 500 of the "Manual of Contract Documents for Highway Works Volume 1 Specification for Highway Works" (or any subsequent iteration). This Lot covers delivery and management of all other Lot areas excluding Lot 1 (Main Contractor), Lot 4 (Tunnels), Lot 5.1 (Technology Design) and Lot 5.2 (Design). Other duties This lot also includes the following activities * the delivery and management of works associated with or ancillary to the activities set out above, * design of their works (optional) * Framework Mobilisation, * mobilisation for the purpose of the activities set out above, * pre-construction services, * early engagement, * undertaking the principal contractor role as required by the Client, * undertaking the principal designer role as required by the Client (optional), * undertaking the lead contractor role as required by any Work Order, * the provision of welfare facilities, * the management of network occupancy, * community and * the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 2 is 20.

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

General Civils, Drainage & Concrete (South West)

This Lot (2/SW) covers the supply of products, materials, plant, equipment and people to carry out construction and removal activities, including: * highway drainage assets, * pipes, * ditches, * swales, * ponds, * the control and disposal of contaminated material, * associated technology works, * earthworks, * ducting, * kerbing, * footways, * rigid pavement, * retexturing of exposed concrete pavement, * site clearance, * brick, block and stonework, * piling, * temporary works required to ensure a safe method of working, * demolition, * structural steelworks, * reinforced earth abutments, * wingwalls, * retaining walls, * concrete, * asbestos removal (planned), * earthwork stabilisation, * counterfort drains, * soil nailing, * grounder anchors, * slope netting (rock and soil), * rock slope works including dowels, bolts, scaling, buttressing, dentition, shotcrete, and * 'innovative' stabilisation techniques, such as electrokinetic osmosis, fibre reinforced soil, soil mixing and the use of geosynthetics to reinforce soil. This Lot covers all works related to drainage as defined by series 500 of the "Manual of Contract Documents for Highway Works Volume 1 Specification for Highway Works" (or any subsequent iteration). This Lot covers delivery and management of all other Lot areas excluding Lot 1 (Main Contractor), Lot 4 (Tunnels), Lot 5.1 (Technology Design) and Lot 5.2 (Design). Other duties This lot also includes the following activities * the delivery and management of works associated with or ancillary to the activities set out above, * design of their works (optional) * Framework Mobilisation, * mobilisation for the purpose of the activities set out above, * pre-construction services, * early engagement, * undertaking the principal contractor role as required by the Client, * undertaking the principal designer role as required by the Client (optional), * undertaking the lead contractor role as required by any Work Order, * the provision of welfare facilities, * the management of network occupancy, * community and * the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 2 is 20.

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

General Civils, Drainage & Concrete (Midlands)

This Lot (2/M) covers the supply of products, materials, plant, equipment and people to carry out construction and removal activities, including: * highway drainage assets, * pipes, * ditches, * swales, * ponds, * the control and disposal of contaminated material, * associated technology works, * earthworks, * ducting, * kerbing, * footways, * rigid pavement, * retexturing of exposed concrete pavement, * site clearance, * brick, block and stonework, * piling, * temporary works required to ensure a safe method of working, * demolition, * structural steelworks, * reinforced earth abutments, * wingwalls, * retaining walls, * concrete, * asbestos removal (planned), * earthwork stabilisation, * counterfort drains, * soil nailing, * grounder anchors, * slope netting (rock and soil), * rock slope works including dowels, bolts, scaling, buttressing, dentition, shotcrete, and * 'innovative' stabilisation techniques, such as electrokinetic osmosis, fibre reinforced soil, soil mixing and the use of geosynthetics to reinforce soil. This Lot covers all works related to drainage as defined by series 500 of the "Manual of Contract Documents for Highway Works Volume 1 Specification for Highway Works" (or any subsequent iteration). This Lot covers delivery and management of all other Lot areas excluding Lot 1 (Main Contractor), Lot 4 (Tunnels), Lot 5.1 (Technology Design) and Lot 5.2 (Design). Other duties This lot also includes the following activities * the delivery and management of works associated with or ancillary to the activities set out above, * design of their works (optional) * Framework Mobilisation, * mobilisation for the purpose of the activities set out above, * pre-construction services, * early engagement, * undertaking the principal contractor role as required by the Client, * undertaking the principal designer role as required by the Client (optional), * undertaking the lead contractor role as required by any Work Order, * the provision of welfare facilities, * the management of network occupancy, * community and * the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 2 is 20.

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

General Civils, Drainage & Concrete (East of England)

This Lot (2/E) covers the supply of products, materials, plant, equipment and people to carry out construction and removal activities, including: * highway drainage assets, * pipes, * ditches, * swales, * ponds, * the control and disposal of contaminated material, * associated technology works, * earthworks, * ducting, * kerbing, * footways, * rigid pavement, * retexturing of exposed concrete pavement, * site clearance, * brick, block and stonework, * piling, * temporary works required to ensure a safe method of working, * demolition, * structural steelworks, * reinforced earth abutments, * wingwalls, * retaining walls, * concrete, * asbestos removal (planned), * earthwork stabilisation, * counterfort drains, * soil nailing, * grounder anchors, * slope netting (rock and soil), * rock slope works including dowels, bolts, scaling, buttressing, dentition, shotcrete, and * 'innovative' stabilisation techniques, such as electrokinetic osmosis, fibre reinforced soil, soil mixing and the use of geosynthetics to reinforce soil. This Lot covers all works related to drainage as defined by series 500 of the "Manual of Contract Documents for Highway Works Volume 1 Specification for Highway Works" (or any subsequent iteration). This Lot covers delivery and management of all other Lot areas excluding Lot 1 (Main Contractor), Lot 4 (Tunnels), Lot 5.1 (Technology Design) and Lot 5.2 (Design). Other duties This lot also includes the following activities * the delivery and management of works associated with or ancillary to the activities set out above, * design of their works (optional) * Framework Mobilisation, * mobilisation for the purpose of the activities set out above, * pre-construction services, * early engagement, * undertaking the principal contractor role as required by the Client, * undertaking the principal designer role as required by the Client (optional), * undertaking the lead contractor role as required by any Work Order, * the provision of welfare facilities, * the management of network occupancy, * community and * the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 2 is 20.

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

Pavements (North East)

This Lot (3/NE) covers: * highway maintenance, renewal, small improvements and associated services for pavements and * the supply of materials, plant, equipment and people to carry out surfacing and pavement construction operations including o bituminous and associated concrete pavement repairs, o surface restoration techniques, o planning, o paving, o retexturing, o high friction surfacing, o iron work adjustment and renewal, o cold applied ultra-thin surfacing (CAUTS), o hydraulically bound mixtures, o in-situ and ex-situ recycling, o loops and associated works, o footway surfacing and asphalt kerbing and o temporary works. Other duties This lot also includes the following activities * the delivery and management of works with or ancillary to the activities set out above, * design of their works (optional) * Framework Mobilisation, * mobilisation for the purpose of the activities set out above, * the provision of welfare facilities, * undertaking the principal contractor role as required by the Client, * undertaking the principal designer role as required by the Client (optional), * the delivery of incident response (rapid response), * pre-construction services, * early engagement, * community and * the provision of Urgent Works The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 3 is 15.

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

Pavements (North West)

This Lot (3/NW) covers: * highway maintenance, renewal, small improvements and associated services for pavements and * the supply of materials, plant, equipment and people to carry out surfacing and pavement construction operations including o bituminous and associated concrete pavement repairs, o surface restoration techniques, o planning, o paving, o retexturing, o high friction surfacing, o iron work adjustment and renewal, o cold applied ultra-thin surfacing (CAUTS), o hydraulically bound mixtures, o in-situ and ex-situ recycling, o loops and associated works, o footway surfacing and asphalt kerbing and o temporary works. Other duties This lot also includes the following activities * the delivery and management of works with or ancillary to the activities set out above, * design of their works (optional) * Framework Mobilisation, * mobilisation for the purpose of the activities set out above, * the provision of welfare facilities, * undertaking the principal contractor role as required by the Client, * undertaking the principal designer role as required by the Client (optional), * the delivery of incident response (rapid response), * pre-construction services, * early engagement, * community and * the provision of Urgent Works The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 3 is 15.

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

Pavements (South East)

This Lot (3/SE) covers: * highway maintenance, renewal, small improvements and associated services for pavements and * the supply of materials, plant, equipment and people to carry out surfacing and pavement construction operations including o bituminous and associated concrete pavement repairs, o surface restoration techniques, o planning, o paving, o retexturing, o high friction surfacing, o iron work adjustment and renewal, o cold applied ultra-thin surfacing (CAUTS), o hydraulically bound mixtures, o in-situ and ex-situ recycling, o loops and associated works, o footway surfacing and asphalt kerbing and o temporary works. Other duties This lot also includes the following activities * the delivery and management of works with or ancillary to the activities set out above, * design of their works (optional) * Framework Mobilisation, * mobilisation for the purpose of the activities set out above, * the provision of welfare facilities, * undertaking the principal contractor role as required by the Client, * undertaking the principal designer role as required by the Client (optional), * the delivery of incident response (rapid response), * pre-construction services, * early engagement, * community and * the provision of Urgent Works The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 3 is 15.

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

Pavements (South West)

This Lot (3/SW) covers: * highway maintenance, renewal, small improvements and associated services for pavements and * the supply of materials, plant, equipment and people to carry out surfacing and pavement construction operations including o bituminous and associated concrete pavement repairs, o surface restoration techniques, o planning, o paving, o retexturing, o high friction surfacing, o iron work adjustment and renewal, o cold applied ultra-thin surfacing (CAUTS), o hydraulically bound mixtures, o in-situ and ex-situ recycling, o loops and associated works, o footway surfacing and asphalt kerbing and o temporary works. Other duties This lot also includes the following activities * the delivery and management of works with or ancillary to the activities set out above, * design of their works (optional) * Framework Mobilisation, * mobilisation for the purpose of the activities set out above, * the provision of welfare facilities, * undertaking the principal contractor role as required by the Client, * undertaking the principal designer role as required by the Client (optional), * the delivery of incident response (rapid response), * pre-construction services, * early engagement, * community and * the provision of Urgent Works The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 3 is 15.

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

Pavements (Midlands)

This Lot (3/M) covers: * highway maintenance, renewal, small improvements and associated services for pavements and * the supply of materials, plant, equipment and people to carry out surfacing and pavement construction operations including o bituminous and associated concrete pavement repairs, o surface restoration techniques, o planning, o paving, o retexturing, o high friction surfacing, o iron work adjustment and renewal, o cold applied ultra-thin surfacing (CAUTS), o hydraulically bound mixtures, o in-situ and ex-situ recycling, o loops and associated works, o footway surfacing and asphalt kerbing and o temporary works. Other duties This lot also includes the following activities * the delivery and management of works with or ancillary to the activities set out above, * design of their works (optional) * Framework Mobilisation, * mobilisation for the purpose of the activities set out above, * the provision of welfare facilities, * undertaking the principal contractor role as required by the Client, * undertaking the principal designer role as required by the Client (optional), * the delivery of incident response (rapid response), * pre-construction services, * early engagement, * community and * the provision of Urgent Works The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 3 is 15.

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

Pavements (East of England)

This Lot (3/E) covers: * highway maintenance, renewal, small improvements and associated services for pavements and * the supply of materials, plant, equipment and people to carry out surfacing and pavement construction operations including o bituminous and associated concrete pavement repairs, o surface restoration techniques, o planning, o paving, o retexturing, o high friction surfacing, o iron work adjustment and renewal, o cold applied ultra-thin surfacing (CAUTS), o hydraulically bound mixtures, o in-situ and ex-situ recycling, o loops and associated works, o footway surfacing and asphalt kerbing and o temporary works. Other duties This lot also includes the following activities * the delivery and management of works with or ancillary to the activities set out above, * design of their works (optional) * Framework Mobilisation, * mobilisation for the purpose of the activities set out above, * the provision of welfare facilities, * undertaking the principal contractor role as required by the Client, * undertaking the principal designer role as required by the Client (optional), * the delivery of incident response (rapid response), * pre-construction services, * early engagement, * community and * the provision of Urgent Works The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 3 is 15.

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

Tunnels (National)

This Lot 4 covers the supply of materials, plant, equipment and people to carry out construction, commissioning, integrated commissioning, integrated testing and removal activities within and related to road tunnels, including the option to deliver scheme(s) as design & build. Scope includes but not limited to * electrical systems, * mechanical systems, * technology systems and * design and installation of temporary works. Suppliers may be provided with specialist technology assets by the Client. Other duties This Lot also includes the following activities * Framework Mobilisation, * mobilisation for the purpose of the activities set out above, * carrying out surveys, * fault finding and diagnostics, * pre-construction services, * early engagement, * undertaking the principal designer role as required by the Client, * undertaking the principal contractor role as required by the Client, * the provision of welfare facilities, * the delivery of incident response (rapid response), * the management of network occupancy, * community and * the provision of Urgent Works. The procurement procedure for this Lot will be Process 2.

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

Technology Design (North East, North West & Midlands)

This Lot (5.1/North) covers the design of highway maintenance, renewal and small improvement and associated services with a primary focus on technology including: * structures, * landscaping, * pavements, * drainage, * traffic modelling, * traffic signals, * geometrical designs, * geotechnics, * technology, * lighting, * motorway communications, * environmental, * noise quality (including non-invasive surveys), * air quality (including non-invasive surveys), * vehicle restraint systems, * depots, * preparation of contract documents, * site supervision and * stakeholder engagement/consultation. Other duties This Lot also includes the following activities: * Framework Mobilisation, * framework mobilisation for the purpose of the activities set out above, * carrying out surveys (intrusive and non-intrusive), * pre-construction services, * early engagement, * undertaking the principal designer role as required by the Client, * the provision of welfare facilities, * the management of network occupancy, * community and * the provision of Urgent Works. The procurement procedure for this Lot will be Process 1. The maximum number of suppliers to be invited to tender for both Sublots within Lot 5.1 is 8

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

Technology Design (South East, South West & East of England)

This Lot (5.1/South) covers the design of highway maintenance, renewal and small improvement and associated services with a primary focus on technology including: * structures, * landscaping, * pavements, * drainage, * traffic modelling, * traffic signals, * geometrical designs, * geotechnics, * technology, * lighting, * motorway communications, * environmental, * noise quality (including non-invasive surveys), * air quality (including non-invasive surveys), * vehicle restraint systems, * depots, * preparation of contract documents, * site supervision and * stakeholder engagement/consultation. Other duties This Lot also includes the following activities: * Framework Mobilisation, * framework mobilisation for the purpose of the activities set out above, * carrying out surveys (intrusive and non-intrusive), * pre-construction services, * early engagement, * undertaking the principal designer role as required by the Client, * the provision of welfare facilities, * the management of network occupancy, * community and * the provision of Urgent Works. The procurement procedure for this Lot will be Process 1. The maximum number of suppliers to be invited to tender for both Sublots within Lot 5.1 is 8

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

Design (North East)

This Lot (5.2/NE) covers the design of highway maintenance, renewal and improvement and associated services. The primary focus is on non-technology assets including: * structures, * landscaping, * pavements, * drainage, * earthworks, * traffic signals and signs, * geometrical designs, * geotechnics, * lighting, * motorway communications, * environmental, * noise quality (including non-invasive surveys), * air quality (including non-invasive surveys), * vehicle restraint systems, * depots, * preparation of contract documents, * site supervision, * stakeholder engagement/consultation * non-technology schemes that have technology design. Other duties This Lot also includes the following activities; * Framework Mobilisation, * framework mobilisation for the purpose of the activities set out in above, * carrying out surveys (intrusive and non-intrusive), * early engagement, * design validation, * undertaking the principal designer role as required by the Client, * the management of network occupancy, * undertaking the role of technical advisor as required by the Client, * undertaking the role of independent works examiner as required by the Client, * modelling services (e.g. traffic and economic), * supporting governance submissions for both the Client and DfT, * creating business cases in line with the Treasury green book requirements, * land referencing, * planning submissions including development consent orders (DCO), * the delivery of incident response (rapid response), * demobilisation, * community and * the provision of Urgent Works. The procurement procedure for this Lot will be Process 1. The maximum number of suppliers to be invited to tender for all Sublots within Lot 5.2 is 15

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

Design (North West)

This Lot (5.2/NW) covers the design of highway maintenance, renewal and improvement and associated services. The primary focus is on non-technology assets including: * structures, * landscaping, * pavements, * drainage, * earthworks, * traffic signals and signs, * geometrical designs, * geotechnics, * lighting, * motorway communications, * environmental, * noise quality (including non-invasive surveys), * air quality (including non-invasive surveys), * vehicle restraint systems, * depots, * preparation of contract documents, * site supervision, * stakeholder engagement/consultation * non-technology schemes that have technology design. Other duties This Lot also includes the following activities; * Framework Mobilisation, * framework mobilisation for the purpose of the activities set out in above, * carrying out surveys (intrusive and non-intrusive), * early engagement, * design validation, * undertaking the principal designer role as required by the Client, * the management of network occupancy, * undertaking the role of technical advisor as required by the Client, * undertaking the role of independent works examiner as required by the Client, * modelling services (e.g. traffic and economic), * supporting governance submissions for both the Client and DfT, * creating business cases in line with the Treasury green book requirements, * land referencing, * planning submissions including development consent orders (DCO), * the delivery of incident response (rapid response), * demobilisation, * community and * the provision of Urgent Works. The procurement procedure for this Lot will be Process 1. The maximum number of suppliers to be invited to tender for all Sublots within Lot 5.2 is 15

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

Design (South East)

This Lot (5.2/SE) covers the design of highway maintenance, renewal and improvement and associated services. The primary focus is on non-technology assets including: * structures, * landscaping, * pavements, * drainage, * earthworks, * traffic signals and signs, * geometrical designs, * geotechnics, * lighting, * motorway communications, * environmental, * noise quality (including non-invasive surveys), * air quality (including non-invasive surveys), * vehicle restraint systems, * depots, * preparation of contract documents, * site supervision, * stakeholder engagement/consultation * non-technology schemes that have technology design. Other duties This Lot also includes the following activities; * Framework Mobilisation, * framework mobilisation for the purpose of the activities set out in above, * carrying out surveys (intrusive and non-intrusive), * early engagement, * design validation, * undertaking the principal designer role as required by the Client, * the management of network occupancy, * undertaking the role of technical advisor as required by the Client, * undertaking the role of independent works examiner as required by the Client, * modelling services (e.g. traffic and economic), * supporting governance submissions for both the Client and DfT, * creating business cases in line with the Treasury green book requirements, * land referencing, * planning submissions including development consent orders (DCO), * the delivery of incident response (rapid response), * demobilisation, * community and * the provision of Urgent Works. The procurement procedure for this Lot will be Process 1. The maximum number of suppliers to be invited to tender for all Sublots within Lot 5.2 is 15

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

Design (South West)

This Lot (5.2/SW) covers the design of highway maintenance, renewal and improvement and associated services. The primary focus is on non-technology assets including: * structures, * landscaping, * pavements, * drainage, * earthworks, * traffic signals and signs, * geometrical designs, * geotechnics, * lighting, * motorway communications, * environmental, * noise quality (including non-invasive surveys), * air quality (including non-invasive surveys), * vehicle restraint systems, * depots, * preparation of contract documents, * site supervision, * stakeholder engagement/consultation * non-technology schemes that have technology design. Other duties This Lot also includes the following activities; * Framework Mobilisation, * framework mobilisation for the purpose of the activities set out in above, * carrying out surveys (intrusive and non-intrusive), * early engagement, * design validation, * undertaking the principal designer role as required by the Client, * the management of network occupancy, * undertaking the role of technical advisor as required by the Client, * undertaking the role of independent works examiner as required by the Client, * modelling services (e.g. traffic and economic), * supporting governance submissions for both the Client and DfT, * creating business cases in line with the Treasury green book requirements, * land referencing, * planning submissions including development consent orders (DCO), * the delivery of incident response (rapid response), * demobilisation, * community and * the provision of Urgent Works. The procurement procedure for this Lot will be Process 1. The maximum number of suppliers to be invited to tender for all Sublots within Lot 5.2 is 15

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

Design (Midlands)

This Lot (5.2/M) covers the design of highway maintenance, renewal and improvement and associated services. The primary focus is on non-technology assets including: * structures, * landscaping, * pavements, * drainage, * earthworks, * traffic signals and signs, * geometrical designs, * geotechnics, * lighting, * motorway communications, * environmental, * noise quality (including non-invasive surveys), * air quality (including non-invasive surveys), * vehicle restraint systems, * depots, * preparation of contract documents, * site supervision, * stakeholder engagement/consultation * non-technology schemes that have technology design. Other duties This Lot also includes the following activities; * Framework Mobilisation, * framework mobilisation for the purpose of the activities set out in above, * carrying out surveys (intrusive and non-intrusive), * early engagement, * design validation, * undertaking the principal designer role as required by the Client, * the management of network occupancy, * undertaking the role of technical advisor as required by the Client, * undertaking the role of independent works examiner as required by the Client, * modelling services (e.g. traffic and economic), * supporting governance submissions for both the Client and DfT, * creating business cases in line with the Treasury green book requirements, * land referencing, * planning submissions including development consent orders (DCO), * the delivery of incident response (rapid response), * demobilisation, * community and * the provision of Urgent Works. The procurement procedure for this Lot will be Process 1. The maximum number of suppliers to be invited to tender for all Sublots within Lot 5.2 is 15

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

Design (East of England)

This Lot (5.2/E) covers the design of highway maintenance, renewal and improvement and associated services. The primary focus is on non-technology assets including: * structures, * landscaping, * pavements, * drainage, * earthworks, * traffic signals and signs, * geometrical designs, * geotechnics, * lighting, * motorway communications, * environmental, * noise quality (including non-invasive surveys), * air quality (including non-invasive surveys), * vehicle restraint systems, * depots, * preparation of contract documents, * site supervision, * stakeholder engagement/consultation * non-technology schemes that have technology design. Other duties This Lot also includes the following activities; * Framework Mobilisation, * framework mobilisation for the purpose of the activities set out in above, * carrying out surveys (intrusive and non-intrusive), * early engagement, * design validation, * undertaking the principal designer role as required by the Client, * the management of network occupancy, * undertaking the role of technical advisor as required by the Client, * undertaking the role of independent works examiner as required by the Client, * modelling services (e.g. traffic and economic), * supporting governance submissions for both the Client and DfT, * creating business cases in line with the Treasury green book requirements, * land referencing, * planning submissions including development consent orders (DCO), * the delivery of incident response (rapid response), * demobilisation, * community and * the provision of Urgent Works. The procurement procedure for this Lot will be Process 1. The maximum number of suppliers to be invited to tender for all Sublots within Lot 5.2 is 15

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

Traffic Management (North East)

This Lot (6/NE) covers the design, supply of materials, plant and people and equipment for the: * installation, maintenance and removal of temporary traffic management, * installation, maintenance and removal of temporary safety barrier systems, * installation, maintenance and removal of temporary speed enforcement systems, * installation, maintenance and removal of temporary CCTV systems, * management of breakdown recovery services, * installation, maintenance and removal of temporary road markings and road studs and * removal of existing road markings and road studs. Other duties This Lot also includes the following activities: * Framework Mobilisation, * mobilisation for the purpose of the activities set out above, * pre-construction services, * early engagement, * undertaking the principal contractor role as required by the Client, * the provision of welfare facilities, * the management of network occupancy and * community and * the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 6 is 15

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

Traffic Management (North West)

This Lot (6/NW) covers the design, supply of materials, plant and people and equipment for the: * installation, maintenance and removal of temporary traffic management, * installation, maintenance and removal of temporary safety barrier systems, * installation, maintenance and removal of temporary speed enforcement systems, * installation, maintenance and removal of temporary CCTV systems, * management of breakdown recovery services, * installation, maintenance and removal of temporary road markings and road studs and * removal of existing road markings and road studs. Other duties This Lot also includes the following activities: * Framework Mobilisation, * mobilisation for the purpose of the activities set out above, * pre-construction services, * early engagement, * undertaking the principal contractor role as required by the Client, * the provision of welfare facilities, * the management of network occupancy and * community and * the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 6 is 15

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

Traffic Management (South East)

This Lot (6/SE) covers the design, supply of materials, plant and people and equipment for the: * installation, maintenance and removal of temporary traffic management, * installation, maintenance and removal of temporary safety barrier systems, * installation, maintenance and removal of temporary speed enforcement systems, * installation, maintenance and removal of temporary CCTV systems, * management of breakdown recovery services, * installation, maintenance and removal of temporary road markings and road studs and * removal of existing road markings and road studs. Other duties This Lot also includes the following activities: * Framework Mobilisation, * mobilisation for the purpose of the activities set out above, * pre-construction services, * early engagement, * undertaking the principal contractor role as required by the Client, * the provision of welfare facilities, * the management of network occupancy and * community and * the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 6 is 15

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

Traffic Management (South West)

This Lot (6/SW) covers the design, supply of materials, plant and people and equipment for the: * installation, maintenance and removal of temporary traffic management, * installation, maintenance and removal of temporary safety barrier systems, * installation, maintenance and removal of temporary speed enforcement systems, * installation, maintenance and removal of temporary CCTV systems, * management of breakdown recovery services, * installation, maintenance and removal of temporary road markings and road studs and * removal of existing road markings and road studs. Other duties This Lot also includes the following activities: * Framework Mobilisation, * mobilisation for the purpose of the activities set out above, * pre-construction services, * early engagement, * undertaking the principal contractor role as required by the Client, * the provision of welfare facilities, * the management of network occupancy and * community and * the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 6 is 15

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

Traffic Management (Midlands)

This Lot (6/M) covers the design, supply of materials, plant and people and equipment for the: * installation, maintenance and removal of temporary traffic management, * installation, maintenance and removal of temporary safety barrier systems, * installation, maintenance and removal of temporary speed enforcement systems, * installation, maintenance and removal of temporary CCTV systems, * management of breakdown recovery services, * installation, maintenance and removal of temporary road markings and road studs and * removal of existing road markings and road studs. Other duties This Lot also includes the following activities: * Framework Mobilisation, * mobilisation for the purpose of the activities set out above, * pre-construction services, * early engagement, * undertaking the principal contractor role as required by the Client, * the provision of welfare facilities, * the management of network occupancy and * community and * the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 6 is 15

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

Traffic Management (East of England)

This Lot (6/E) covers the design, supply of materials, plant and people and equipment for the: * installation, maintenance and removal of temporary traffic management, * installation, maintenance and removal of temporary safety barrier systems, * installation, maintenance and removal of temporary speed enforcement systems, * installation, maintenance and removal of temporary CCTV systems, * management of breakdown recovery services, * installation, maintenance and removal of temporary road markings and road studs and * removal of existing road markings and road studs. Other duties This Lot also includes the following activities: * Framework Mobilisation, * mobilisation for the purpose of the activities set out above, * pre-construction services, * early engagement, * undertaking the principal contractor role as required by the Client, * the provision of welfare facilities, * the management of network occupancy and * community and * the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 6 is 15

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

Structures (North East)

This Lot (7/NE) covers the supply of materials, plant and people for the: * installation of temporary works, * application of maintenance painting systems including specialist corrosion protection systems, * removal, installation and repair of concrete on highway structures, * removal, installation and repair of concrete bridge parapets, * removal, installation and repair of bridge bearings and * remove, repair and installation of cathodic protection. Other duties This lot also includes the following activities * the delivery and management of works associated with or ancillary to the activities set out above, * design of their works (optional) * Framework Mobilisation, * mobilisation for the purpose of the activities set out above, * pre-construction services, * undertaking the principal contractor role as required by the Client, * the provision of welfare facilities, * the management of network occupancy, * community and * the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 7 is 15

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

Structures (North West)

This Lot (7/NW) covers the supply of materials, plant and people for the: * installation of temporary works, * application of maintenance painting systems including specialist corrosion protection systems, * removal, installation and repair of concrete on highway structures, * removal, installation and repair of concrete bridge parapets, * removal, installation and repair of bridge bearings and * remove, repair and installation of cathodic protection. Other duties This lot also includes the following activities * the delivery and management of works associated with or ancillary to the activities set out above, * design of their works (optional) * Framework Mobilisation, * mobilisation for the purpose of the activities set out above, * pre-construction services, * undertaking the principal contractor role as required by the Client, * the provision of welfare facilities, * the management of network occupancy, * community and * the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 7 is 15

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

Structures (South East)

This Lot (7/SE) covers the supply of materials, plant and people for the: * installation of temporary works, * application of maintenance painting systems including specialist corrosion protection systems, * removal, installation and repair of concrete on highway structures, * removal, installation and repair of concrete bridge parapets, * removal, installation and repair of bridge bearings and * remove, repair and installation of cathodic protection. Other duties This lot also includes the following activities * the delivery and management of works associated with or ancillary to the activities set out above, * design of their works (optional) * Framework Mobilisation, * mobilisation for the purpose of the activities set out above, * pre-construction services, * undertaking the principal contractor role as required by the Client, * the provision of welfare facilities, * the management of network occupancy, * community and * the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 7 is 15

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

Structures (South West)

This Lot (7/SW) covers the supply of materials, plant and people for the: * installation of temporary works, * application of maintenance painting systems including specialist corrosion protection systems, * removal, installation and repair of concrete on highway structures, * removal, installation and repair of concrete bridge parapets, * removal, installation and repair of bridge bearings and * remove, repair and installation of cathodic protection. Other duties This lot also includes the following activities * the delivery and management of works associated with or ancillary to the activities set out above, * design of their works (optional) * Framework Mobilisation, * mobilisation for the purpose of the activities set out above, * pre-construction services, * undertaking the principal contractor role as required by the Client, * the provision of welfare facilities, * the management of network occupancy, * community and * the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 7 is 15

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

Structures (Midlands)

This Lot (7/M) covers the supply of materials, plant and people for the: * installation of temporary works, * application of maintenance painting systems including specialist corrosion protection systems, * removal, installation and repair of concrete on highway structures, * removal, installation and repair of concrete bridge parapets, * removal, installation and repair of bridge bearings and * remove, repair and installation of cathodic protection. Other duties This lot also includes the following activities * the delivery and management of works associated with or ancillary to the activities set out above, * design of their works (optional) * Framework Mobilisation, * mobilisation for the purpose of the activities set out above, * pre-construction services, * undertaking the principal contractor role as required by the Client, * the provision of welfare facilities, * the management of network occupancy, * community and * the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 7 is 15

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

Structures (East of England)

This Lot (7/E) covers the supply of materials, plant and people for the: * installation of temporary works, * application of maintenance painting systems including specialist corrosion protection systems, * removal, installation and repair of concrete on highway structures, * removal, installation and repair of concrete bridge parapets, * removal, installation and repair of bridge bearings and * remove, repair and installation of cathodic protection. Other duties This lot also includes the following activities * the delivery and management of works associated with or ancillary to the activities set out above, * design of their works (optional) * Framework Mobilisation, * mobilisation for the purpose of the activities set out above, * pre-construction services, * undertaking the principal contractor role as required by the Client, * the provision of welfare facilities, * the management of network occupancy, * community and * the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 7 is 15

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

Joints & Waterproofing (North East)

This Lot (8/NE) covers the supply of materials, plant and people for the installation, removal of and repair work to: * highways structure expansion joints, * waterproofing systems, * associated concrete repair, * testing of existing waterproofing systems, and * installation, maintenance and removal of any temporary works required to ensure a safe method of working. Other duties This Lot also includes the following activities: * the delivery and management of works associated with or ancillary to the activities set out above * design of their works (optional) * Framework Mobilisation, * mobilisation for the purpose of the activities set out above, * undertaking the principal contractor role as required by the Client, * pre-construction services, * the provision of welfare facilities, * the management of network occupancy, * community and * the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 8 is 15

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

Joints & Waterproofing (North West)

This Lot (8/NW) covers the supply of materials, plant and people for the installation, removal of and repair work to: * highways structure expansion joints, * waterproofing systems, * associated concrete repair, * testing of existing waterproofing systems, and * installation, maintenance and removal of any temporary works required to ensure a safe method of working. Other duties This Lot also includes the following activities: * the delivery and management of works associated with or ancillary to the activities set out above * design of their works (optional) * Framework Mobilisation, * mobilisation for the purpose of the activities set out above, * undertaking the principal contractor role as required by the Client, * pre-construction services, * the provision of welfare facilities, * the management of network occupancy, * community and * the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 8 is 15

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

Joints & Waterproofing (South East)

This Lot (8/SE) covers the supply of materials, plant and people for the installation, removal of and repair work to: * highways structure expansion joints, * waterproofing systems, * associated concrete repair, * testing of existing waterproofing systems, and * installation, maintenance and removal of any temporary works required to ensure a safe method of working. Other duties This Lot also includes the following activities: * the delivery and management of works associated with or ancillary to the activities set out above * design of their works (optional) * Framework Mobilisation, * mobilisation for the purpose of the activities set out above, * undertaking the principal contractor role as required by the Client, * pre-construction services, * the provision of welfare facilities, * the management of network occupancy, * community and * the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 8 is 15

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

Joints & Waterproofing (South West)

This Lot (8/SW) covers the supply of materials, plant and people for the installation, removal of and repair work to: * highways structure expansion joints, * waterproofing systems, * associated concrete repair, * testing of existing waterproofing systems, and * installation, maintenance and removal of any temporary works required to ensure a safe method of working. Other duties This Lot also includes the following activities: * the delivery and management of works associated with or ancillary to the activities set out above * design of their works (optional) * Framework Mobilisation, * mobilisation for the purpose of the activities set out above, * undertaking the principal contractor role as required by the Client, * pre-construction services, * the provision of welfare facilities, * the management of network occupancy, * community and * the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 8 is 15

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

Joints & Waterproofing (Midlands)

This Lot (8/M) covers the supply of materials, plant and people for the installation, removal of and repair work to: * highways structure expansion joints, * waterproofing systems, * associated concrete repair, * testing of existing waterproofing systems, and * installation, maintenance and removal of any temporary works required to ensure a safe method of working. Other duties This Lot also includes the following activities: * the delivery and management of works associated with or ancillary to the activities set out above * design of their works (optional) * Framework Mobilisation, * mobilisation for the purpose of the activities set out above, * undertaking the principal contractor role as required by the Client, * pre-construction services, * the provision of welfare facilities, * the management of network occupancy, * community and * the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 8 is 15

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

Joints & Waterproofing (East of England)

This Lot (8/E) covers the supply of materials, plant and people for the installation, removal of and repair work to: * highways structure expansion joints, * waterproofing systems, * associated concrete repair, * testing of existing waterproofing systems, and * installation, maintenance and removal of any temporary works required to ensure a safe method of working. Other duties This Lot also includes the following activities: * the delivery and management of works associated with or ancillary to the activities set out above * design of their works (optional) * Framework Mobilisation, * mobilisation for the purpose of the activities set out above, * undertaking the principal contractor role as required by the Client, * pre-construction services, * the provision of welfare facilities, * the management of network occupancy, * community and * the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 8 is 15

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

Landscaping (North East)

This Lot (9/NE) covers the supply of materials, plant and people to carry out landscaping and ecology works including: * weed control, * wildlife control, * ground preparation, * seeding, * turfing, * boundary fencing, * planting, * watering, * tree and shrub maintenance, * creation and management of waterbodies as and any other ecological measures and * landscape clearance. Other duties This Lot also includes the following activities: * the delivery and management of works associated with or ancillary to the activities set out in section above, * design of their works (optional) * Framework Mobilisation, * mobilisation for the purpose of the activities set out in section above, * undertaking the principal contractor role as required by the Client, * pre-construction services, * the provision of welfare facilities, * the management of network occupancy, * community and * the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 9 is 20

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

Landscaping (North West)

This Lot (9/NW) covers the supply of materials, plant and people to carry out landscaping and ecology works including: * weed control, * wildlife control, * ground preparation, * seeding, * turfing, * boundary fencing, * planting, * watering, * tree and shrub maintenance, * creation and management of waterbodies as and any other ecological measures and * landscape clearance. Other duties This Lot also includes the following activities: * the delivery and management of works associated with or ancillary to the activities set out in section above, * design of their works (optional) * Framework Mobilisation, * mobilisation for the purpose of the activities set out in section above, * undertaking the principal contractor role as required by the Client, * pre-construction services, * the provision of welfare facilities, * the management of network occupancy, * community and * the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 9 is 20

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

Landscaping (South East)

This Lot (9/SE) covers the supply of materials, plant and people to carry out landscaping and ecology works including: * weed control, * wildlife control, * ground preparation, * seeding, * turfing, * boundary fencing, * planting, * watering, * tree and shrub maintenance, * creation and management of waterbodies as and any other ecological measures and * landscape clearance. Other duties This Lot also includes the following activities: * the delivery and management of works associated with or ancillary to the activities set out in section above, * design of their works (optional) * Framework Mobilisation, * mobilisation for the purpose of the activities set out in section above, * undertaking the principal contractor role as required by the Client, * pre-construction services, * the provision of welfare facilities, * the management of network occupancy, * community and * the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 9 is 20

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

Landscaping (South West)

This Lot (9/SW) covers the supply of materials, plant and people to carry out landscaping and ecology works including: * weed control, * wildlife control, * ground preparation, * seeding, * turfing, * boundary fencing, * planting, * watering, * tree and shrub maintenance, * creation and management of waterbodies as and any other ecological measures and * landscape clearance. Other duties This Lot also includes the following activities: * the delivery and management of works associated with or ancillary to the activities set out in section above, * design of their works (optional) * Framework Mobilisation, * mobilisation for the purpose of the activities set out in section above, * undertaking the principal contractor role as required by the Client, * pre-construction services, * the provision of welfare facilities, * the management of network occupancy, * community and * the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 9 is 20

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

Landscaping (Midlands)

This Lot (9/M) covers the supply of materials, plant and people to carry out landscaping and ecology works including: * weed control, * wildlife control, * ground preparation, * seeding, * turfing, * boundary fencing, * planting, * watering, * tree and shrub maintenance, * creation and management of waterbodies as and any other ecological measures and * landscape clearance. Other duties This Lot also includes the following activities: * the delivery and management of works associated with or ancillary to the activities set out in section above, * design of their works (optional) * Framework Mobilisation, * mobilisation for the purpose of the activities set out in section above, * undertaking the principal contractor role as required by the Client, * pre-construction services, * the provision of welfare facilities, * the management of network occupancy, * community and * the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 9 is 20

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

Landscaping (East of England)

This Lot (9/E) covers the supply of materials, plant and people to carry out landscaping and ecology works including: * weed control, * wildlife control, * ground preparation, * seeding, * turfing, * boundary fencing, * planting, * watering, * tree and shrub maintenance, * creation and management of waterbodies as and any other ecological measures and * landscape clearance. Other duties This Lot also includes the following activities: * the delivery and management of works associated with or ancillary to the activities set out in section above, * design of their works (optional) * Framework Mobilisation, * mobilisation for the purpose of the activities set out in section above, * undertaking the principal contractor role as required by the Client, * pre-construction services, * the provision of welfare facilities, * the management of network occupancy, * community and * the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 9 is 20

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

Road Markings (North East)

This Lot (10/NE) covers the supply of materials, plant and people for the installation and removal of: * highway road markings, * road studs, * installation and removal of temporary road markings and road studs, * high friction surfacing, * crack sealing and * pavement joint repair. Other duties This Lot also includes the following activities: * the delivery and management of works associated with or ancillary to the activities set out in above, * design of their works (optional) * Framework Mobilisation, * mobilisation for the purpose of the activities set out in above, * undertaking the principal contractor role as required by the Client, * pre-construction services, * the provision of welfare facilities, * the management of network occupancy, * community and * the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 10 is 20

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

Road Markings (North West)

This Lot (10/NW) covers the supply of materials, plant and people for the installation and removal of: * highway road markings, * road studs, * installation and removal of temporary road markings and road studs, * high friction surfacing, * crack sealing and * pavement joint repair. Other duties This Lot also includes the following activities: * the delivery and management of works associated with or ancillary to the activities set out in above, * design of their works (optional) * Framework Mobilisation, * mobilisation for the purpose of the activities set out in above, * undertaking the principal contractor role as required by the Client, * pre-construction services, * the provision of welfare facilities, * the management of network occupancy, * community and * the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 10 is 20

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

Road Markings (South East)

This Lot (10/SE) covers the supply of materials, plant and people for the installation and removal of: * highway road markings, * road studs, * installation and removal of temporary road markings and road studs, * high friction surfacing, * crack sealing and * pavement joint repair. Other duties This Lot also includes the following activities: * the delivery and management of works associated with or ancillary to the activities set out in above, * design of their works (optional) * Framework Mobilisation, * mobilisation for the purpose of the activities set out in above, * undertaking the principal contractor role as required by the Client, * pre-construction services, * the provision of welfare facilities, * the management of network occupancy, * community and * the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 10 is 20

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

Road Markings (South West)

This Lot (10/SW) covers the supply of materials, plant and people for the installation and removal of: * highway road markings, * road studs, * installation and removal of temporary road markings and road studs, * high friction surfacing, * crack sealing and * pavement joint repair. Other duties This Lot also includes the following activities: * the delivery and management of works associated with or ancillary to the activities set out in above, * design of their works (optional) * Framework Mobilisation, * mobilisation for the purpose of the activities set out in above, * undertaking the principal contractor role as required by the Client, * pre-construction services, * the provision of welfare facilities, * the management of network occupancy, * community and * the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 10 is 20

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

Road Markings (Midlands)

This Lot (10/M) covers the supply of materials, plant and people for the installation and removal of: * highway road markings, * road studs, * installation and removal of temporary road markings and road studs, * high friction surfacing, * crack sealing and * pavement joint repair. Other duties This Lot also includes the following activities: * the delivery and management of works associated with or ancillary to the activities set out in above, * design of their works (optional) * Framework Mobilisation, * mobilisation for the purpose of the activities set out in above, * undertaking the principal contractor role as required by the Client, * pre-construction services, * the provision of welfare facilities, * the management of network occupancy, * community and * the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 10 is 20

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

Road Markings (East of England)

This Lot (10/E) covers the supply of materials, plant and people for the installation and removal of: * highway road markings, * road studs, * installation and removal of temporary road markings and road studs, * high friction surfacing, * crack sealing and * pavement joint repair. Other duties This Lot also includes the following activities: * the delivery and management of works associated with or ancillary to the activities set out in above, * design of their works (optional) * Framework Mobilisation, * mobilisation for the purpose of the activities set out in above, * undertaking the principal contractor role as required by the Client, * pre-construction services, * the provision of welfare facilities, * the management of network occupancy, * community and * the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 10 is 20

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

Signs & Lighting (North East)

This Lot (11/NE) covers the supply of materials, plant, products and people for the installation, removal and commissioning of: * road lighting and * traffic signs and other highway electrical equipment (excluding roadside technology assets). Other duties This Lot also includes the following activities: * the delivery and management of works associated with or ancillary to the activities set out in above, * design of their works (optional) * Framework Mobilisation, * mobilisation for the purpose of section above, * pre-construction services, * elements of supplier design, * the provision of welfare facilities, * undertaking the principal contractor role as required by the Client, * the management of network occupancy, * temporary works, * community and * the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 11 is 20

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

Signs & Lighting (North West)

This Lot (11/NW) covers the supply of materials, plant, products and people for the installation, removal and commissioning of: * road lighting and * traffic signs and other highway electrical equipment (excluding roadside technology assets). Other duties This Lot also includes the following activities: * the delivery and management of works associated with or ancillary to the activities set out in above, * design of their works (optional) * Framework Mobilisation, * mobilisation for the purpose of section above, * pre-construction services, * elements of supplier design, * the provision of welfare facilities, * undertaking the principal contractor role as required by the Client, * the management of network occupancy, * temporary works, * community and * the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 11 is 20

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

Signs & Lighting (South East)

This Lot (11/SE) covers the supply of materials, plant, products and people for the installation, removal and commissioning of: * road lighting and * traffic signs and other highway electrical equipment (excluding roadside technology assets). Other duties This Lot also includes the following activities: * the delivery and management of works associated with or ancillary to the activities set out in above, * design of their works (optional) * Framework Mobilisation, * mobilisation for the purpose of section above, * pre-construction services, * elements of supplier design, * the provision of welfare facilities, * undertaking the principal contractor role as required by the Client, * the management of network occupancy, * temporary works, * community and * the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 11 is 20

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

Signs & Lighting (South West)

This Lot (11/SW) covers the supply of materials, plant, products and people for the installation, removal and commissioning of: * road lighting and * traffic signs and other highway electrical equipment (excluding roadside technology assets). Other duties This Lot also includes the following activities: * the delivery and management of works associated with or ancillary to the activities set out in above, * design of their works (optional) * Framework Mobilisation, * mobilisation for the purpose of section above, * pre-construction services, * elements of supplier design, * the provision of welfare facilities, * undertaking the principal contractor role as required by the Client, * the management of network occupancy, * temporary works, * community and * the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 11 is 20

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

Signs & Lighting (Midlands)

This Lot (11/M) covers the supply of materials, plant, products and people for the installation, removal and commissioning of: * road lighting and * traffic signs and other highway electrical equipment (excluding roadside technology assets). Other duties This Lot also includes the following activities: * the delivery and management of works associated with or ancillary to the activities set out in above, * design of their works (optional) * Framework Mobilisation, * mobilisation for the purpose of section above, * pre-construction services, * elements of supplier design, * the provision of welfare facilities, * undertaking the principal contractor role as required by the Client, * the management of network occupancy, * temporary works, * community and * the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 11 is 20

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

Signs & Lighting (East of England)

This Lot (11/E) covers the supply of materials, plant, products and people for the installation, removal and commissioning of: * road lighting and * traffic signs and other highway electrical equipment (excluding roadside technology assets). Other duties This Lot also includes the following activities: * the delivery and management of works associated with or ancillary to the activities set out in above, * design of their works (optional) * Framework Mobilisation, * mobilisation for the purpose of section above, * pre-construction services, * elements of supplier design, * the provision of welfare facilities, * undertaking the principal contractor role as required by the Client, * the management of network occupancy, * temporary works, * community and * the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 11 is 20

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

Vehicle Restraint Systems / Road Restraint Systems (North East)

This Lot (12/NE) covers the supply of materials, plant and people for the: * installation and removal of road restraint systems (vehicle and pedestrian), * installation and repair of non-concrete bridge parapets, * push tests of existing road restraint systems, * temporary works and * installation and removal of highway fencing and environmental barrier. Other duties This Lot also includes the following activities: * the delivery and management of works associated with or ancillary to the activities set out in above, * design of their works (optional) * Framework Mobilisation, * mobilisation for the purpose of above, * pre-construction services, * undertaking the principal contractor role as required by the Client, * the provision of welfare facilities, * the management of network occupancy, * community and * the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 12 is 20

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

Vehicle Restraint Systems / Road Restraint Systems (North West)

This Lot (12/NW) covers the supply of materials, plant and people for the: installation and removal of road restraint systems (vehicle and pedestrian), * installation and repair of non-concrete bridge parapets, * push tests of existing road restraint systems, * temporary works and * installation and removal of highway fencing and environmental barrier. Other duties This Lot also includes the following activities: * the delivery and management of works associated with or ancillary to the activities set out in above, * design of their works (optional) * Framework Mobilisation, * mobilisation for the purpose of above, * pre-construction services, * undertaking the principal contractor role as required by the Client, * the provision of welfare facilities, * the management of network occupancy, * community and * the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 12 is 20

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

Vehicle Restraint Systems / Road Restraint Systems (South East)

This Lot (12/SE) covers the supply of materials, plant and people for the: installation and removal of road restraint systems (vehicle and pedestrian), * installation and repair of non-concrete bridge parapets, * push tests of existing road restraint systems, * temporary works and * installation and removal of highway fencing and environmental barrier. Other duties This Lot also includes the following activities: * the delivery and management of works associated with or ancillary to the activities set out in above, * design of their works (optional) * Framework Mobilisation, * mobilisation for the purpose of above, * pre-construction services, * undertaking the principal contractor role as required by the Client, * the provision of welfare facilities, * the management of network occupancy, * community and * the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 12 is 20

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

Vehicle Restraint Systems / Road Restraint Systems (South West)

This Lot (12/SW) covers the supply of materials, plant and people for the: installation and removal of road restraint systems (vehicle and pedestrian), * installation and repair of non-concrete bridge parapets, * push tests of existing road restraint systems, * temporary works and * installation and removal of highway fencing and environmental barrier. Other duties This Lot also includes the following activities: * the delivery and management of works associated with or ancillary to the activities set out in above, * design of their works (optional) * Framework Mobilisation, * mobilisation for the purpose of above, * pre-construction services, * undertaking the principal contractor role as required by the Client, * the provision of welfare facilities, * the management of network occupancy, * community and * the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 12 is 20

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

Vehicle Restraint Systems / Road Restraint Systems (Midlands)

This Lot (12/M) covers the supply of materials, plant and people for the: installation and removal of road restraint systems (vehicle and pedestrian), * installation and repair of non-concrete bridge parapets, * push tests of existing road restraint systems, * temporary works and * installation and removal of highway fencing and environmental barrier. Other duties This Lot also includes the following activities: * the delivery and management of works associated with or ancillary to the activities set out in above, * design of their works (optional) * Framework Mobilisation, * mobilisation for the purpose of above, * pre-construction services, * undertaking the principal contractor role as required by the Client, * the provision of welfare facilities, * the management of network occupancy, * community and * the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 12 is 20

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

Vehicle Restraint Systems / Road Restraint Systems (East of England)

This Lot (12/E) covers the supply of materials, plant and people for the: installation and removal of road restraint systems (vehicle and pedestrian), * installation and repair of non-concrete bridge parapets, * push tests of existing road restraint systems, * temporary works and * installation and removal of highway fencing and environmental barrier. Other duties This Lot also includes the following activities: * the delivery and management of works associated with or ancillary to the activities set out in above, * design of their works (optional) * Framework Mobilisation, * mobilisation for the purpose of above, * pre-construction services, * undertaking the principal contractor role as required by the Client, * the provision of welfare facilities, * the management of network occupancy, * community and * the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 12 is 20

Options: National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.

## Key Details

| Field | Value |
| --- | --- |
| Publication source | Find A Tender Service |
| Latest notice | https://www.find-tender.service.gov.uk/Notice/060400-2025 |
| Notice type | UK4 - Tender Notice |
| Procurement type | Framework |
| Procurement category | Works |
| Procurement method | Selective |
| Procurement method details | Competitive flexible procedure |
| Tender suitability | SME, VCSE |
| Awardee scale | Not specified |
| All stages | Planning, Tender |

## Dates

| Field | Value |
| --- | --- |
| Publication date | 29 Sep 2025 |
| Submission deadline | 24 Oct 2025 |
| Future notice date | 22 Jan 2026 |
| Award date | Not specified |
| Contract period | 14 Sep 2027 - 15 Sep 2035 |
| Recurrence | Not specified |

## Values

| Field | Value |
| --- | --- |
| Tender value | £14,500,000,000 |
| Lots value | £9,087,873,051 |
| Awards value | Not specified |
| Contracts value | Not specified |

## Status

| Field | Value |
| --- | --- |
| Tender status | Active |
| Lots status | Active |
| Awards status | Not specified |
| Contracts status | Not specified |

## Buyer

| Field | Value |
| --- | --- |
| Main buyer | NATIONAL HIGHWAYS |
| Locality | GUILDFORD |
| Post town | Guildford |
| Postcode | GU1 4LZ |
| Country | England |
| ITL 1 | TLJ South East (England) |
| ITL 2 | TLJ2 Surrey, East and West Sussex |
| ITL 3 | TLJ25 West Surrey |
| Local authority | Guildford |
| Electoral ward | Stoke |
| Westminster constituency | Guildford |
| Delivery location | TLC North East (England), TLD North West (England), TLF East Midlands (England), TLG West Midlands (England), TLH East (England), TLJ South East (England), TLK South West (England) |

## CPV Codes

### Divisions

- 14 - Mining, basic metals and related products
- 31 - Electrical machinery, apparatus, equipment and consumables; lighting
- 34 - Transport equipment and auxiliary products to transportation
- 39 - Furniture (incl. office furniture), furnishings, domestic appliances (excl. lighting) and cleaning products
- 44 - Construction structures and materials; auxiliary products to construction (except electric apparatus)
- 45 - Construction work
- 50 - Repair and maintenance services
- 63 - Supporting and auxiliary transport services; travel agencies services
- 71 - Architectural, construction, engineering and inspection services
- 72 - IT services: consulting, software development, Internet and support
- 73 - Research and development services and related consultancy services
- 77 - Agricultural, forestry, horticultural, aquacultural and apicultural services
- 90 - Sewage, refuse, cleaning and environmental services
- 92 - Recreational, cultural and sporting services

### Codes

- 14213000 - Macadam, tarmac and tar sands
- 31000000 - Electrical machinery, apparatus, equipment and consumables; lighting
- 31500000 - Lighting equipment and electric lamps
- 31523000 - Illuminated signs and nameplates
- 31530000 - Parts of lamps and lighting equipment
- 34922100 - Road markings
- 34923000 - Road traffic-control equipment
- 34928100 - Crash barriers
- 34928110 - Road barriers
- 34928300 - Safety barriers
- 34928500 - Street-lighting equipment
- 34928510 - Street-lighting columns
- 34970000 - Traffic-monitoring equipment
- 34972000 - Traffic-flow measuring system
- 34992000 - Signs and illuminated signs
- 34992100 - Illuminated traffic signs
- 34993100 - Tunnel lighting
- 39293300 - Artificial grass
- 44000000 - Construction structures and materials; auxiliary products to construction (except electric apparatus)
- 44112000 - Miscellaneous building structures
- 44210000 - Structures and parts of structures
- 44212120 - Structures of bridges
- 44212300 - Structures and parts
- 44212317 - Scaffolding structures
- 44212320 - Miscellaneous structures
- 44212380 - Parts of structures
- 45000000 - Construction work
- 45111240 - Ground-drainage work
- 45112700 - Landscaping work
- 45200000 - Works for complete or part construction and civil engineering work
- 45213310 - Construction work for buildings relating to road transport
- 45221000 - Construction work for bridges and tunnels, shafts and subways
- 45221241 - Road tunnel construction work
- 45221247 - Tunnelling works
- 45221248 - Tunnel linings construction work
- 45223000 - Structures construction work
- 45223100 - Assembly of metal structures
- 45223110 - Installation of metal structures
- 45223500 - Reinforced-concrete structures
- 45223800 - Assembly and erection of prefabricated structures
- 45230000 - Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork
- 45233100 - Construction work for highways, roads
- 45233120 - Road construction works
- 45233121 - Main road construction works
- 45233130 - Construction work for highways
- 45233131 - Construction work for elevated highways
- 45233139 - Highway maintenance work
- 45233141 - Road-maintenance works
- 45233142 - Road-repair works
- 45233150 - Traffic-calming works
- 45233210 - Surface work for highways
- 45233220 - Surface work for roads
- 45233221 - Road-surface painting work
- 45233222 - Paving and asphalting works
- 45233223 - Carriageway resurfacing works
- 45233251 - Resurfacing works
- 45233280 - Erection of road-barriers
- 45233300 - Foundation work for highways, roads, streets and footpaths
- 45233310 - Foundation work for highways
- 45233320 - Foundation work for roads
- 45247200 - Construction work for dams and similar fixed structures
- 45262300 - Concrete work
- 45310000 - Electrical installation work
- 45316110 - Installation of road lighting equipment
- 45316210 - Installation of traffic monitoring equipment
- 45316211 - Installation of illuminated road signs
- 45316212 - Installation of traffic lights
- 45316213 - Installation of traffic guidance equipment
- 45340000 - Fencing, railing and safety equipment installation work
- 45442120 - Painting and protective-coating work of structures
- 45442121 - Painting work of structures
- 50000000 - Repair and maintenance services
- 50200000 - Repair, maintenance and associated services related to aircraft, railways, roads and marine equipment
- 50230000 - Repair, maintenance and associated services related to roads and other equipment
- 50232000 - Maintenance services of public-lighting installations and traffic lights
- 50232100 - Street-lighting maintenance services
- 50232110 - Commissioning of public lighting installations
- 50232200 - Traffic-signal maintenance services
- 63712000 - Support services for road transport
- 63712200 - Highway operation services
- 63712320 - Tunnel operation services
- 63712700 - Traffic control services
- 63712710 - Traffic monitoring services
- 71311000 - Civil engineering consultancy services
- 71320000 - Engineering design services
- 71322000 - Engineering design services for the construction of civil engineering works
- 71322500 - Engineering-design services for traffic installations
- 71356200 - Technical assistance services
- 71356300 - Technical support services
- 71530000 - Construction consultancy services
- 71631400 - Technical inspection services of engineering structures
- 72224000 - Project management consultancy services
- 73210000 - Research consultancy services
- 73300000 - Design and execution of research and development
- 73420000 - Pre-feasibility study and technological demonstration
- 77211300 - Tree-clearing services
- 77211400 - Tree-cutting services
- 77211500 - Tree-maintenance services
- 77211600 - Tree seeding
- 77310000 - Planting and maintenance services of green areas
- 77314100 - Grassing services
- 77340000 - Tree pruning and hedge trimming
- 77341000 - Tree pruning
- 90912000 - Blast-cleaning services for tubular structures
- 92534000 - Wildlife preservation services

## Release History

- 29 Sep 2025 at 09:57 - Tender - UK4 - Tender Notice - https://www.find-tender.service.gov.uk/Notice/060400-2025
- 16 May 2025 at 13:27 - Planning - UK1 - Pipeline Notice - https://www.find-tender.service.gov.uk/Notice/022269-2025

## Documents

- https://www.find-tender.service.gov.uk/Notice/060400-2025
  29th September 2025 - Tender notice on Find a Tender
- https://www.find-tender.service.gov.uk/Notice/022269-2025
  16th May 2025 - Pipeline notice on Find a Tender
- https://www.find-tender.service.gov.uk/Notice/Attachment/A-5622
- https://www.find-tender.service.gov.uk/Notice/Attachment/A-5623
- https://www.find-tender.service.gov.uk/Notice/Attachment/A-5624
- https://www.find-tender.service.gov.uk/Notice/Attachment/A-5625

## Notice URLs

- https://highways.sharepoint.com/:f:/s/NationalHighwaysProcurement-MaterialforExternalRelease/EjbLGgLNyFFKiYPsSEatBR4BI28Sv1e4-xZToGq2cfyZ9g?e=3Tx80E
- https://nationalhighways.co.uk
- https://nationalhighways.ukp.app.jaggaer.com/