---
title: "London Gateway - Second Rail Terminal Phase 2"
ocid: "ocds-h6vhtk-066c43"
canonical_url: "https://d3tenders.com/contract/?ocid=ocds-h6vhtk-066c43"
markdown_url: "https://d3tenders.com/contract/ocds-h6vhtk-066c43.md"
json_url: "https://d3tenders.com/contract/ocds-h6vhtk-066c43.json"
source: "Find A Tender Service"
current_stage: "Tender"
buyer: "LONDON GATEWAY PORT LIMITED"
published: "2026-03-17"
---

# London Gateway - Second Rail Terminal Phase 2

Buyer: LONDON GATEWAY PORT LIMITED  
Current stage: Tender  
OCID: ocds-h6vhtk-066c43

[View canonical contract page](https://d3tenders.com/contract/?ocid=ocds-h6vhtk-066c43)  
[Download OCDS JSON](https://d3tenders.com/contract/ocds-h6vhtk-066c43.json)

## Summary

The procurement process initiated by London Gateway Port Limited involves the development of a second rail terminal at the London Gateway Port, Stanford le Hope, aiming to enhance rail freight capacity. Tagged under the category of railway construction works, and valued at £15 million, this project addresses a strategic expansion of intermodal capabilities to support sustainable logistics solutions. The procurement, active as of 17th March 2026, is structured as a competitive flexible procedure, requiring suppliers to meet selection criteria outlined in the prequalification questionnaire (PQQ). The expression of interest deadline is set for 13th April 2026, with contract work scheduled to begin in July 2026 and expected to last for 12 months. The project aims to provide a robust infrastructure to support robotic RMGC operations and reduce carbon impact, with a completion goal of enabling efficient goods movement across the UK.

This tender presents a significant opportunity for businesses in civil engineering, railway infrastructure, telecommunications, signalling, and electrical works to engage in the expansion of one of the UK's key logistics hubs. Companies with expertise in sustainable logistics solutions, and those capable of managing complex interfaces and integrations with existing infrastructure, are well-suited to compete. The selective procurement method ensures only capable suppliers, based on their technical capability and commercial proposals, advance through the multi-stage tendering process. By participating, businesses can demonstrate their capacity to contribute to greener freight transport solutions while potentially securing a substantial contract aiding in their growth and development.

## Notice

DP World is undertaking the expansion of its London Gateway Port facility at Stanford le Hope, through the development of a new second rail terminal located to the west of the existing eastern operational rail facility. This investment will significantly increase the port's rail freight capacity, improve operational resilience, and support the continued growth of DP Worlds sustainable, low carbon logistics solutions. This expansion represents a strategic enhancement of the port's intermodal capability, enabling faster, more efficient movement of goods across the UK and supporting national objectives for greener freight transport. The new terminal will play a key role in accommodating future demand and maintaining London Gateway's position as a world class logistics and supply chain hub. The Scope of Works covered under this tender include, but are not limited to, the following key elements: Permanent Way Works Construction of new railway infrastructure to serve the second terminal including plain line track, and associated components in a phase installation sequence delivering five new sidings (7 to 11) to compliment the two sidings (12 and 13) already constructed during Phase 1/1A of the works, which are currently in operation. Installation and integration of 21 new switches and crossings (S&C) required to connect the new terminal to the existing rail network corridor as well as providing more route paths for trains entering and exiting the existing eastern rail terminal. Civil Engineering Works Installation of a circa 850m long reinforced concrete crane rail beam with pre-cast concrete pile foundations and its associated mechanical chambers to allow Rail Mounted Gantry Crane (RMGC) operations within the new terminal. Earthworks, formation preparation, track drainage and utility diversions necessary to support the new terminal infrastructure. Construction of numerous ancillary civils foundation bases, walkways, cable routes and under track crossings for the new signalling, telecommunications and electrical plant equipment, shunters cabin and REB building. Telecommunications Works Installation of new and relocation of existing Operational Telecoms and SiSS systems assets including CCTV cameras, signal post and point zone telephones and the shunters panel concentrator. Signaling Works Provision of new and relocation of existing signaling assets, including lineside equipment, control system modifications in the form of new Shunters Cabin housing an updated control panel to operate both rail terminals, and associated REB for the signaling system interlocking. These assets will be constructed in a staged delivery to align with the permanent way phasing, to ensure full operational compatibility. Installation of new signaling track circuits to both the western and eastern terminals will enable operation of both facilities from the one new control panel. Testing, commissioning and integration of all new rail systems with existing operational infrastructure as well as update to the Upminster IECC workstation screens. Electrical and Plant Works New power supplies to the various disciplines line side equipment, shunters cabin and REB, as well as new points heating assets for both the western and existing eastern rail terminal S&C units. Interfaces and Integration Management of all interfaces with existing rail infrastructure, port operations, utilities, and third party stakeholders. Development of staging plans to minimise operational disruption and ensure safe working adjacent to live rail and port environments. Coordination with existing port operations to ensure safe and continuous functionality during construction. Project Goals Upon completion, the new rail terminal will provide; increased rail served capacity for containerised freight, enhanced operational flexibility and resilience, deliver infrastructure capable of supporting robotic next generation RMGC equipment and improved efficiency as well as reduce the ports carbon impact through expanded rail freight capability. Programme: It is intended that the Rail works will commence in July 2026 for a duration of 12 months.

## Key Details

| Field | Value |
| --- | --- |
| Publication source | Find A Tender Service |
| Latest notice | https://www.find-tender.service.gov.uk/Notice/024069-2026 |
| Notice type | UK4 - Tender Notice |
| Procurement type | Standard |
| Procurement category | Works |
| Procurement method | Selective |
| Procurement method details | Competitive flexible procedure |
| Tender suitability | Not specified |
| Awardee scale | Not specified |
| All stages | Tender |

## Dates

| Field | Value |
| --- | --- |
| Publication date | 17 Mar 2026 |
| Submission deadline | 13 Apr 2026 |
| Future notice date | Not specified |
| Award date | Not specified |
| Contract period | 30 Jun 2026 - 30 Jun 2027 |
| Recurrence | Not specified |

## Values

| Field | Value |
| --- | --- |
| Tender value | £15,000,000 |
| Lots value | £15,000,000 |
| Awards value | Not specified |
| Contracts value | Not specified |

## Status

| Field | Value |
| --- | --- |
| Tender status | Active |
| Lots status | Active |
| Awards status | Not specified |
| Contracts status | Not specified |

## Buyer

| Field | Value |
| --- | --- |
| Main buyer | LONDON GATEWAY PORT LIMITED |
| Locality | LONDON |
| Post town | South West London |
| Postcode | SW1E 5JQ |
| Country | England |
| ITL 1 | TLI London |
| ITL 2 | TLI3 Inner London - West |
| ITL 3 | TLI35 Westminster and City of London |
| Local authority | Westminster |
| Electoral ward | St James's |
| Westminster constituency | Cities of London and Westminster |
| Delivery location | TLH32 Thurrock |

## CPV Codes

### Divisions

- 45 - Construction work

### Codes

- 45234100 - Railway construction works

## Release History

- 17 Mar 2026 at 13:40 - Tender - UK4 - Tender Notice - https://www.find-tender.service.gov.uk/Notice/024069-2026

## Documents

- https://www.find-tender.service.gov.uk/Notice/024069-2026
  17th March 2026 - Tender notice on Find a Tender

## Notice URLs

- https://ehpv.fa.em2.oraclecloud.com
- https://www.legislation.gov.uk/ukpga/2023/54/contents

## Provenance

This Markdown file is an alternate public rendering of the D3 Tenders contract record. The canonical page is https://d3tenders.com/contract/?ocid=ocds-h6vhtk-066c43. The underlying structured data is available as OCDS JSON at https://d3tenders.com/contract/ocds-h6vhtk-066c43.json.
