# Civil Works within NGED Substations 132kV, 66kV, 33kV and 11kV Framework

Buyer: NATIONAL GRID UK LIMITED  
Current stage: Tender  
OCID: ocds-h6vhtk-067c3b

[View canonical contract page](https://d3tenders.com/contract/?ocid=ocds-h6vhtk-067c3b)  
[Download OCDS JSON](https://d3tenders.com/contract/ocds-h6vhtk-067c3b.json)

## Summary

The procurement process initiated by National Grid UK Limited involves a framework for civil works within NGED substations at voltage levels of 132kV, 66kV, 33kV, and 11kV. The primary focus is on construction and refurbishment activities across various regional zones in the United Kingdom, including areas like the South West, East Midlands, South Wales, and West Midlands. The tender is currently active, and potential suppliers are encouraged to submit expressions of interest by 12 May 2026. This project falls within the critical industry category of substation construction work. The procurement method is a selective, competitive flexible procedure with multiple evaluation stages, starting from qualification to request for proposal (RFP) and negotiation phases. The contract is expected to commence on 22 June 2026.

This tender provides substantial growth opportunities for businesses specialising in civil engineering, construction, and maintenance within electrical substations. Companies with expertise in handling "live" substation environments and employing specialist techniques for environmental protection will find this project particularly suitable. With a gross contract value of £48 million, it is an attractive prospect for firms capable of delivering high-quality work on a large scale. Potential bidders should have the capability to manage flexible procurement strategies, such as mini-competitions and direct awards, which are part of the call-off procedures under the framework. Participation in such a significant infrastructure development project can elevate a company's standing and open avenues for similar future works.

## Notice

Works under the Framework comprises of civil engineering & building work associated with the construction of new and refurbishment of existing electricity substation sites within NGED's electrical distribution network. Civils works will frequently be carried out in a "live" substation environment. Typically, but not exclusively, covering construction of new substations, construction of new buildings, modification or alteration to existing buildings, foundations, fencing, interceptors, drainage, roads, trenching, general excavation and cable ducts. The scope also extends to general building maintenance associated with roof repairs, redecoration, joinery, guttering, glazing, trench cover replacement, door or gate installation and replacement. It may also entail use of specialist techniques associated with tasks related to environmental protection of electrical substations from extreme weather conditions such as flooding, high winds, high humidity, or any such criteria likely to adversely affect NGED's electrical infrastructure.

### Lot Information

Redruth, Bodmin

This Framework Lot covers the geographical NGED network zones of Redruth, Bodmin. Works under the Framework Lot comprises of civil engineering & building work associated with the construction of new and refurbishment of existing electricity substation sites within NGED's electrical distribution network. Civils works will frequently be carried out in a "live" substation environment. Typically, but not exclusively, covering construction of new substations, construction of new buildings, modification or alteration to existing buildings, foundations, fencing, interceptors, drainage, roads, trenching, general excavation and cable ducts. The scope also extends to general building maintenance associated with roof repairs, redecoration, joinery, guttering, glazing, trench cover replacement, door or gate installation and replacement. It may also entail use of specialist techniques associated with tasks related to environmental protection of electrical substations from extreme weather conditions such as flooding, high winds, high humidity, or any such criteria likely to adversely affect NGED's electrical infrastructure.

Renewal: The Contract Term may be extended by National Grid for a further period of up to 12 months by notice in writing to the appointed supplier(s).

Plymouth, Torbay, Mid & East Devon, North Devon

This Framework Lot covers the geographical NGED network zones of Plymouth, Torbay, Mid & East Devon, North Devon Works under the Framework Lot comprises of civil engineering & building work associated with the construction of new and refurbishment of existing electricity substation sites within NGED's electrical distribution network. Civils works will frequently be carried out in a "live" substation environment. Typically, but not exclusively, covering construction of new substations, construction of new buildings, modification or alteration to existing buildings, foundations, fencing, interceptors, drainage, roads, trenching, general excavation and cable ducts. The scope also extends to general building maintenance associated with roof repairs, redecoration, joinery, guttering, glazing, trench cover replacement, door or gate installation and replacement. It may also entail use of specialist techniques associated with tasks related to environmental protection of electrical substations from extreme weather conditions such as flooding, high winds, high humidity, or any such criteria likely to adversely affect NGED's electrical infrastructure.

Renewal: The Contract Term may be extended by National Grid for a further period of up to 12 months by notice in writing to the appointed supplier(s).

Somerset, Mendip Western, Mendip Bath and Bristol

This Framework Lot covers the geographical NGED network zones of Somerset, Mendip Western, Mendip Bath and Bristol. Works under the Framework Lot comprises of civil engineering & building work associated with the construction of new and refurbishment of existing electricity substation sites within NGED's electrical distribution network. Civils works will frequently be carried out in a "live" substation environment. Typically, but not exclusively, covering construction of new substations, construction of new buildings, modification or alteration to existing buildings, foundations, fencing, interceptors, drainage, roads, trenching, general excavation and cable ducts. The scope also extends to general building maintenance associated with roof repairs, redecoration, joinery, guttering, glazing, trench cover replacement, door or gate installation and replacement. It may also entail use of specialist techniques associated with tasks related to environmental protection of electrical substations from extreme weather conditions such as flooding, high winds, high humidity, or any such criteria likely to adversely affect NGED's electrical infrastructure.

Renewal: The Contract Term may be extended by National Grid for a further period of up to 12 months by notice in writing to the appointed supplier(s).

East Wales, West Wales, Swansea Area, Cardiff Area

This Framework Lot covers the geographical NGED network zones of East Wales, West Wales, Swansea Area, Cardiff Area. Works under the Framework Lot comprises of civil engineering & building work associated with the construction of new and refurbishment of existing electricity substation sites within NGED's electrical distribution network. Civils works will frequently be carried out in a "live" substation environment. Typically, but not exclusively, covering construction of new substations, construction of new buildings, modification or alteration to existing buildings, foundations, fencing, interceptors, drainage, roads, trenching, general excavation and cable ducts. The scope also extends to general building maintenance associated with roof repairs, redecoration, joinery, guttering, glazing, trench cover replacement, door or gate installation and replacement. It may also entail use of specialist techniques associated with tasks related to environmental protection of electrical substations from extreme weather conditions such as flooding, high winds, high humidity, or any such criteria likely to adversely affect NGED's electrical infrastructure.

Renewal: The Contract Term may be extended by National Grid for a further period of up to 12 months by notice in writing to the appointed supplier(s).

Gloucester, Hereford & Ludlow, Worcester

This Framework Lot covers the geographical NGED network zones of Gloucester, Hereford & Ludlow, Worcester. Works under the Framework Lot comprises of civil engineering & building work associated with the construction of new and refurbishment of existing electricity substation sites within NGED's electrical distribution network. Civils works will frequently be carried out in a "live" substation environment. Typically, but not exclusively, covering construction of new substations, construction of new buildings, modification or alteration to existing buildings, foundations, fencing, interceptors, drainage, roads, trenching, general excavation and cable ducts. The scope also extends to general building maintenance associated with roof repairs, redecoration, joinery, guttering, glazing, trench cover replacement, door or gate installation and replacement. It may also entail use of specialist techniques associated with tasks related to environmental protection of electrical substations from extreme weather conditions such as flooding, high winds, high humidity, or any such criteria likely to adversely affect NGED's electrical infrastructure.

Renewal: The Contract Term may be extended by National Grid for a further period of up to 12 months by notice in writing to the appointed supplier(s).

Birmingham, Tipton

This Framework Lot covers the geographical NGED network zones of Birmingham, Tipton. Works under the Framework Lot comprises of civil engineering & building work associated with the construction of new and refurbishment of existing electricity substation sites within NGED's electrical distribution network. Civils works will frequently be carried out in a "live" substation environment. Typically, but not exclusively, covering construction of new substations, construction of new buildings, modification or alteration to existing buildings, foundations, fencing, interceptors, drainage, roads, trenching, general excavation and cable ducts. The scope also extends to general building maintenance associated with roof repairs, redecoration, joinery, guttering, glazing, trench cover replacement, door or gate installation and replacement. It may also entail use of specialist techniques associated with tasks related to environmental protection of electrical substations from extreme weather conditions such as flooding, high winds, high humidity, or any such criteria likely to adversely affect NGED's electrical infrastructure.

Renewal: The Contract Term may be extended by National Grid for a further period of up to 12 months by notice in writing to the appointed supplier(s).

Telford, Stoke

This Framework Lot covers the geographical NGED network zones of Telford, Stoke. Works under the Framework Lot comprises of civil engineering & building work associated with the construction of new and refurbishment of existing electricity substation sites within NGED's electrical distribution network. Civils works will frequently be carried out in a "live" substation environment. Typically, but not exclusively, covering construction of new substations, construction of new buildings, modification or alteration to existing buildings, foundations, fencing, interceptors, drainage, roads, trenching, general excavation and cable ducts. The scope also extends to general building maintenance associated with roof repairs, redecoration, joinery, guttering, glazing, trench cover replacement, door or gate installation and replacement. It may also entail use of specialist techniques associated with tasks related to environmental protection of electrical substations from extreme weather conditions such as flooding, high winds, high humidity, or any such criteria likely to adversely affect NGED's electrical infrastructure.

Renewal: The Contract Term may be extended by National Grid for a further period of up to 12 months by notice in writing to the appointed supplier(s).

Derby, Chesterfield & Mansfield, Nottingham

This Framework Lot covers the geographical NGED network zones of Derby, Chesterfield & Mansfield, Nottingham. Works under the Framework Lot comprises of civil engineering & building work associated with the construction of new and refurbishment of existing electricity substation sites within NGED's electrical distribution network. Civils works will frequently be carried out in a "live" substation environment. Typically, but not exclusively, covering construction of new substations, construction of new buildings, modification or alteration to existing buildings, foundations, fencing, interceptors, drainage, roads, trenching, general excavation and cable ducts. The scope also extends to general building maintenance associated with roof repairs, redecoration, joinery, guttering, glazing, trench cover replacement, door or gate installation and replacement. It may also entail use of specialist techniques associated with tasks related to environmental protection of electrical substations from extreme weather conditions such as flooding, high winds, high humidity, or any such criteria likely to adversely affect NGED's electrical infrastructure.

Renewal: The Contract Term may be extended by National Grid for a further period of up to 12 months by notice in writing to the appointed supplier(s).

Coventry & Warwickshire, Northants & Milton Keynes, Leicester & Kettering

This Framework Lot covers the geographical NGED network zones of Coventry & Warwickshire, Northants & Milton Keynes, Leicester & Kettering. Works under the Framework Lot comprises of civil engineering & building work associated with the construction of new and refurbishment of existing electricity substation sites within NGED's electrical distribution network. Civils works will frequently be carried out in a "live" substation environment. Typically, but not exclusively, covering construction of new substations, construction of new buildings, modification or alteration to existing buildings, foundations, fencing, interceptors, drainage, roads, trenching, general excavation and cable ducts. The scope also extends to general building maintenance associated with roof repairs, redecoration, joinery, guttering, glazing, trench cover replacement, door or gate installation and replacement. It may also entail use of specialist techniques associated with tasks related to environmental protection of electrical substations from extreme weather conditions such as flooding, high winds, high humidity, or any such criteria likely to adversely affect NGED's electrical infrastructure.

Renewal: The Contract Term may be extended by National Grid for a further period of up to 12 months by notice in writing to the appointed supplier(s).

South Lincolnshire, North Lincolnshire

This Framework Lot covers the geographical NGED network zones of South Lincolnshire, North Lincolnshire. Works under the Framework Lot comprises of civil engineering & building work associated with the construction of new and refurbishment of existing electricity substation sites within NGED's electrical distribution network. Civils works will frequently be carried out in a "live" substation environment. Typically, but not exclusively, covering construction of new substations, construction of new buildings, modification or alteration to existing buildings, foundations, fencing, interceptors, drainage, roads, trenching, general excavation and cable ducts. The scope also extends to general building maintenance associated with roof repairs, redecoration, joinery, guttering, glazing, trench cover replacement, door or gate installation and replacement. It may also entail use of specialist techniques associated with tasks related to environmental protection of electrical substations from extreme weather conditions such as flooding, high winds, high humidity, or any such criteria likely to adversely affect NGED's electrical infrastructure.

Renewal: The Contract Term may be extended by National Grid for a further period of up to 12 months by notice in writing to the appointed supplier(s).

## Key Details

| Field | Value |
| --- | --- |
| Publication source | Find A Tender Service |
| Latest notice | https://www.find-tender.service.gov.uk/Notice/031095-2026 |
| Notice type | UK4 - Tender Notice |
| Procurement type | Framework |
| Procurement category | Works |
| Procurement method | Selective |
| Procurement method details | Competitive flexible procedure |
| Tender suitability | Not specified |
| Awardee scale | Not specified |
| All stages | Tender |

## Dates

| Field | Value |
| --- | --- |
| Publication date | 2 Apr 2026 |
| Submission deadline | Not specified |
| Future notice date | Not specified |
| Award date | Not specified |
| Contract period | 21 Jun 2026 - 21 Jun 2027 |
| Recurrence | 2026-12-22 |

## Values

| Field | Value |
| --- | --- |
| Tender value | £40,000,000 |
| Lots value | £39,999,999 |
| Awards value | Not specified |
| Contracts value | Not specified |

## Status

| Field | Value |
| --- | --- |
| Tender status | Active |
| Lots status | Active |
| Awards status | Not specified |
| Contracts status | Not specified |

## Buyer

| Field | Value |
| --- | --- |
| Main buyer | NATIONAL GRID UK LIMITED |
| Locality | LONDON |
| Post town | Central London |
| Postcode | WC2N 5EH |
| Country | England |
| ITL 1 | TLI London |
| ITL 2 | TLI3 Inner London - West |
| ITL 3 | TLI35 Westminster and City of London |
| Local authority | Westminster |
| Electoral ward | St James's |
| Westminster constituency | Cities of London and Westminster |
| Delivery location | TLF1 Derbyshire and Nottinghamshire, TLF2 Leicestershire, Rutland and Northamptonshire, TLF3 Lincolnshire, TLG1 Herefordshire, Worcestershire and Warwickshire, TLG2 Shropshire and Staffordshire, TLG3 West Midlands, TLK1 Gloucestershire, Wiltshire and Bristol/Bath area, TLK2 Dorset and Somerset, TLK3 Cornwall and Isles of Scilly, TLK4 Devon, TLL14 South West Wales, TLL15 Central Valleys, TLL16 Gwent Valleys, TLL17 Bridgend and Neath Port Talbot, TLL18 Swansea, TLL21 Monmouthshire and Newport, TLL22 Cardiff and Vale of Glamorgan |

## CPV Codes

### Divisions

- 45 - Construction work

### Codes

- 45232220 - Substation construction work

## Release History

- 2 Apr 2026 at 15:06 - Tender - UK4 - Tender Notice - https://www.find-tender.service.gov.uk/Notice/031095-2026

## Documents

- https://www.find-tender.service.gov.uk/Notice/031095-2026
  2nd April 2026 - Tender notice on Find a Tender