{
    "tag": [
        "compiled"
    ],
    "id": "ocds-h6vhtk-079630-2026-11-03T10:03:11Z",
    "date": "2026-11-03T10:03:11Z",
    "ocid": "ocds-h6vhtk-079630",
    "initiationType": "tender",
    "tender": {
        "id": "ocds-h6vhtk-079630",
        "legalBasis": {
            "id": "32014L0024",
            "scheme": "CELEX"
        },
        "title": "DfI Roads and Rivers T-1092 TC for Maintenance and Improvement of Structures 2019",
        "classification": {
            "scheme": "CPV",
            "id": "45200000",
            "description": "Works for complete or part construction and civil engineering work"
        },
        "mainProcurementCategory": "works",
        "lots": [
            {
                "id": "5",
                "title": "STN1",
                "description": "The work involves the maintenance and improvement to structures and associated ancillary works for five contract areas. Refer to MoI Part B 7.3.1. Within each contract, the works may include but not be limited to the following principal work activities which are provided by way of example: A. stonework, B. sprayed concrete, C. reinforced concrete repairs, D. working with services/utilities, E. vehicle restraint systems installation or repair, F. reinforced concrete construction, G. installation of precast beams or box culverts, H. TTM/dealing with live traffic on Public Roads. The works may also include but not be limited to the following activities: * pressure pointing, * bridge expansion joints, * structural steel painting, * structural steelwork, * temporary works, * waterproofing, * demolition, * emergency response.",
                "contractPeriod": {
                    "durationInDays": 1800
                }
            }
        ],
        "items": [
            {
                "id": "5",
                "additionalClassifications": [
                    {
                        "scheme": "CPV",
                        "id": "45000000",
                        "description": "Construction work"
                    }
                ],
                "deliveryAddresses": [
                    {
                        "region": "UKN"
                    }
                ],
                "relatedLot": "5"
            }
        ],
        "techniques": {
            "frameworkAgreement": {
                "periodRationale": "The contract includes provision for an extension of up to 12 months beyond the stated contract term."
            }
        }
    },
    "awards": [
        {
            "id": "104031-2026-5-1",
            "relatedLots": [
                "5"
            ],
            "title": "STN1",
            "status": "active",
            "suppliers": [
                {
                    "id": "GB-COH-NI067706",
                    "name": "Highway Barrier Solutions Ltd"
                }
            ]
        }
    ],
    "parties": [
        {
            "id": "GB-FTS-177855",
            "name": "DfI Transport and Road Asset Management (TRAM)",
            "identifier": {
                "legalName": "DfI Transport and Road Asset Management (TRAM)",
                "noIdentifierRationale": "notOnAnyRegister"
            },
            "address": {
                "streetAddress": "James House, 2-4 Cromac Avenue, The Gasworks Business Park",
                "locality": "Belfast",
                "region": "UKN06",
                "postalCode": "BT72JA",
                "countryName": "United Kingdom"
            },
            "contactPoint": {
                "email": "TRAMprocurement@infrastructure-ni.gov.uk"
            },
            "roles": [
                "buyer"
            ],
            "details": {
                "url": "https://www.infrastructure-ni.gov.uk/"
            }
        },
        {
            "id": "GB-COH-NI067706",
            "name": "Highway Barrier Solutions Ltd",
            "identifier": {
                "legalName": "Highway Barrier Solutions Ltd",
                "id": "NI067706",
                "scheme": "GB-COH"
            },
            "address": {
                "streetAddress": "40 Manse Road",
                "locality": "Belfast",
                "region": "UKN",
                "postalCode": "BT8 6SA",
                "countryName": "United Kingdom"
            },
            "roles": [
                "supplier"
            ],
            "details": {
                "scale": "large"
            }
        },
        {
            "id": "GB-FTS-14786",
            "name": "The High Court",
            "identifier": {
                "legalName": "The High Court"
            },
            "address": {
                "streetAddress": "Royal Court of Justice",
                "locality": "Belfast",
                "countryName": "United Kingdom"
            },
            "roles": [
                "reviewBody"
            ]
        }
    ],
    "buyer": {
        "id": "GB-FTS-177855",
        "name": "DfI Transport and Road Asset Management (TRAM)"
    },
    "contracts": [
        {
            "id": "104031-2026-5-1",
            "awardID": "104031-2026-5-1",
            "title": "STN1",
            "status": "active",
            "value": {
                "amount": 9010000,
                "currency": "GBP"
            },
            "dateSigned": "2020-10-15T00:00:00+01:00",
            "period": {
                "durationInDays": 2280
            },
            "periodRationale": "This Term Contract will have a total duration of 76 months. The extension is necessary due to delays in the award of the new Structures Framework and will ensure continuity of safety-critical inspection and maintenance services, avoiding a gap in provision and ensuring risks to the health and safety of road users and the public continue to be appropriately managed.",
            "items": [
                {
                    "id": "5",
                    "title": "STN1",
                    "classification": {
                        "scheme": "CPV",
                        "id": "45200000",
                        "description": "Works for complete or part construction and civil engineering work"
                    },
                    "additionalClassifications": [
                        {
                            "scheme": "CPV",
                            "id": "45000000",
                            "description": "Construction work"
                        }
                    ],
                    "deliveryAddresses": [
                        {
                            "region": "UKN"
                        }
                    ],
                    "relatedLot": "5"
                }
            ],
            "amendments": [
                {
                    "id": "1",
                    "description": "The STN1 contract was modified in April 2022 following the introduction of a Translink requirement for contractors undertaking works on or adjacent to Northern Ireland Railways (NIR) infrastructure to hold PS100 million Public Liability Insurance. This enabled STN1 to be utilised for the delivery of NIR-related structures inspections and maintenance activities across Northern Ireland. These additional services were delivered through STN1 from April 2022 until April 2024, at which point responsibility for all rail-related works transferred to the STN2 contract. The present modification does not introduce any further NIR-related services to STN1. It relates solely to the expenditure incurred through STN1 in delivering the additional NIR works between April 2022 and April 2024, with the contract value being adjusted to restore the value utilised in delivering those additional services.",
                    "rationale": "Need for additional works, services or supplies by the original contractor/concessionaire: During the period from April 2022 to April 2024, the incumbent STN1 contractor had secured the required PS100 million Public Liability Insurance, established the necessary operational procedures, obtained relevant access approvals and developed familiarity with the NIR assets and operational environment. A change of contractor during this period would have required an alternative contractor to establish equivalent insurance, mobilisation, access and operational arrangements. This would have resulted in duplication of costs, delays to service delivery and increased operational risk. Accordingly, use of the incumbent contractor avoided significant inconvenience and duplication of costs associated with procuring and mobilising an alternative contractor for the interim period prior to the transfer of the rail-related works to STN2 in April 2024."
                }
            ]
        }
    ],
    "links": [
        {
            "rel": "prev",
            "href": "https://ted.europa.eu/udl?uri=TED:NOTICE:506252-2020:TEXT:EN:HTML"
        }
    ],
    "language": "en"
}