# PRO005166 - ORiW - Design and Integration Partner

Buyer: United Utilities Water Limited  
Current stage: Tender  
OCID: ocds-h6vhtk-07b5da

[View canonical contract page](https://d3tenders.com/contract/?ocid=ocds-h6vhtk-07b5da)  
[Download OCDS JSON](https://d3tenders.com/contract/ocds-h6vhtk-07b5da.json)

## Summary

United Utilities Water Limited is seeking a design and integration partner for its Only Rainwater into Windermere programme. The work is to develop an integrated plan to improve water quality and environmental resilience in the Windermere catchment, including connecting unsewered properties, providing remote treatment where connection is not feasible, reducing weather-related flows, managing highway runoff, and developing wastewater infrastructure such as tunnels, sewers, pumping stations and treatment works. Services include outline design, environmental assessment and surveys, planning and consent work, land and access activities, stakeholder engagement, site investigation and early contractor involvement. The programme is intended to protect Windermere’s ecology, water quality and amenity. Delivery is in the United Kingdom, centred on the Windermere catchment; agricultural impacts are outside this commission’s scope.

The buyer invited offers through an open competitive flexible procedure for a single-partner framework. The procurement has reached tender stage. Questions were due by 17 November 2026 at 14:00, and bids by 30 November 2026 at 14:00; the expected award date was 1 April 2027. The initial design and integration phase is planned for 15 April 2027 to 14 April 2031, with an option to extend in increments for up to nine further years at United Utilities’ discretion. The estimated total value is £60 million to £600 million, with delivery-phase roles being alternatives rather than cumulative. Evaluation gives technical quality 60% and commercial terms 40%.

This is suited to a major multidisciplinary engineering and environmental consultancy or an integrated team able to lead design across wastewater, drainage, civil, mechanical and electrical infrastructure. The partner must coordinate multiple workstreams and interfaces, maintain design consistency, develop a delivery strategy and secure planning approvals and consents, including preparation of a Development Consent Order. Relevant strengths include environmental impact assessment, surveys and site investigation, land referencing and acquisition, stakeholder and customer engagement, constructability and early contractor involvement. Experience supporting water-sector planning and regulatory programmes, including Ofwat price reviews and environmental and drainage planning, is pertinent. Suppliers also need the capacity to sustain programme-level integration and potentially continue into delivery-phase system integration or detailed design. The procurement establishes one framework partner, making proven leadership of complex, long-term infrastructure programmes particularly relevant.

## Notice

This notice relates to tender activity for the provision of certain design and integration services, as explained below. United Utilities Water Limited (UU) proposes to deliver a programme titled Only Rainwater into Windermere (ORiW), with the ambition to make Windermere the cleanest lake in England by removing discharges from both public and private sources, while also addressing highway runoff. This is a long-term, transformational programme designed to protect the lake's ecology, water quality and amenity value for future generations. The target end state is "Only Rainwater into Windermere", restoring the lake as close as possible to its natural condition and reducing the risk of harmful algal blooms and chemicals. The programme will deliver resilient wastewater infrastructure that supports communities, businesses and the wider National Park, while creating a potential blueprint for freshwater restoration across England. This Scope of Requirements does not include agricultural impacts; these are being considered by other programmes. A coalition has been established to develop and deliver the ORiW feasibility phase. It brings together key stakeholders, including UU, local authorities, regulators and environmental organisations, to provide strategic direction and has sponsored the commission of a 'feasibility study' to ascertain the art of the possible for achieving ORiW. Through the commission there are now feasible options for achieving the ambition, to improve water quality, and enhance the environmental resilience of the Windermere catchment, through a proposed ORiW system and wider infrastructure. The proposed ORiW system is made up of multiple workstreams; * First Time Sewerage (FTS), connecting properties to the public sewer network that are currently outside of the network and have never previously been connected to it. * First time Treatment (FTT), for the sites where FTS is not possible, a remote treatment solution will be implemented. * Reduced weather dependent flow, surface water management and management and treatment of highways runoff through the use of nature- based solutions where possible across the catchment. * Construction of tunnel, sewers, rising mains and associated infrastructure. * Upgrade of an existing wastewater treatment works and discharge point. UU anticipates that the ORiW system and the other strategic wastewater transfer and treatment infrastructure required for the ORiW programme (including the tunnel, rising mains, pumping stations, wastewater treatment facilities, associated drainage works and all ancillary infrastructure), will be promoted through a Development Consent Order (DCO) as a Nationally Significant Infrastructure Project (NSIP), subject to Section 35 approval by Defra. [SM1.1][WD1.2] UU are launching a competitive tendering procedure for the appointment of a Design and Integration Partner (D&IP) who will be responsible for supporting the next phase of this programme, designing the ORiW system, including whole system integration, to achieve the programme vision. UU requires the D&IP to complete feasibility, outline design, constructability and other related activities to obtain the necessary approvals and consents for the programme to proceed to the delivery phase for the preferred solution. Accordingly, the D&IP will also be responsible for the delivery of the DCO and planning approvals. As such, the outline design needs to fully support and integrate with the DCO, Town and Country Planning Act (TCPA) and land acquisition and access processes. At a high level, the initial scope of requirements for the D&IP will include, but may not be limited to the following activities across each of the workstreams of the ORiW system; * Outline Design * Planning, Consents and Land * Environmental Impact Assessments (EIA) and surveys * Stakeholder and Customer Engagement * Land Agency, Referencing and Surveying * Preparation and submission of planning applications and all supporting information * Preparation and submission of the DCO and all supporting information * Site Investigation (SI) * Early Contractor involvement (ECI) * Supporting UU in meeting reporting requirements with Ofwat i.e. PR29 Price Review * Supporting UU with any required preparation, development and submission of information for the Water Industry National Environment Programme (WINEP) and Drainage and Wastewater Management Plan (DWMP) UU require a D&IP who has the capability and experience to ensure coordination over integration of all elements of the ORiW system and all other related activities that are required. The D&IP will also need to be capable of leading the overall delivery strategy, managing interfaces across the programme, maintaining design consistency, and ensuring that the complete solution meets the requirements to obtain the necessary approvals and consents. UU is continuing to consider its approach to the delivery phase of the programme and anticipates that it may need ongoing support from the D&IP into the delivery phase to provide continuity throughout the programme lifecycle. The precise form that this ongoing support may take will be dependent on the precise delivery model that UU adopt for the delivery phase, but the role to be played by the D&IP may include typical professional services support of the nature to be expected of a design and integration professional services consultant acting for a client in relation to the delivery phase of a major engineering and construction project, for example (without limitation) either: * The D&IP acting as system integrator and detailed design partner to either UU and/or any prime contractor engaged in relation to the programme. * The D&IP acting as a system integrator partner to provide support across different workstreams and work packages forming part of the programme so that the overall programme is delivered as seamlessly as possible. * Providing alternative services to support UU's client-side management of delivery partners engaged to undertake the delivery phase of the programme. From a contractual perspective, this may entail: * Continuing consultancy services (e.g. oversight of delivery contractors or supporting the coordination between delivery contractors and/or developing the detail of design work undertaken during the development phase) provided by the D&IP on the same, or similar, call-off contract terms and conditions as are prescribed under the framework agreement for the development phase of the Programme; or * An evolution of the delivery model and associated call-off terms and conditions envisaged under the framework agreement for the development phase of the Programme to align to the Client's proposed delivery model for the delivery phase of the Programme, including for example: o requiring the D&IP to enter into a strategic sub-contract with one or more delivery contractors appointed by the Client for the provision of detailed design services; or o the provision by the D&IP of design and integration services to the Client as part of an integrated "Enterprise" delivery model incorporating the Client, D&IP and delivery contractors and designed to create aligned incentives across all such participants. An outline of the potential structure and commercial proposition of this Enterprise model, including the call-off contract terms and conditions that could be used to effect it, will be set out in the framework agreement on an indicative basis (recognising that the precise terms and conditions of any call-off contract and the model more broadly would be developed separately by UU and refined through engagement with other potential Enterprise participants). Whatever model is adopted, the Client will ensure that the balance of risk and reward, and the potential commercial and financial impact on the D&IP, is similar and broadly equivalent to the balance struck in the call-off terms and conditions for the development phase. This means that UU will endeavour to ensure that, as and when any call-off terms and conditions are entered into, the D&IP would not be materially better off under the enterprise or alliance type model, in all material respects, compared to the position under a continuation of the development phase arrangements. Anticipated value of each role; * Design & Integration Partner (pre delivery phase) > 4 years = circa PS60-100m * System Integrator Partner (during delivery phase) > up to a further 9 years in increments at UUs discretion = circa PS100m (subject to CPIH) * System Integrator and Detailed Design Partner (during delivery phase) > up to a further 9 years in increments at UUs discretion = circa PS500m (subject to CPIH) Please note that the total value is given as a range (PS60m to PS600m) which includes the minimum and maximum total estimated values across those roles. As explained above, the system integrator partner (during delivery phase) and system integrator and detailed design partner roles are alternatives and so the combined value of each is not included in the total (only the higher of the two).

### Lot Information

Lot LOT-0000

Options: Refer to Procurement description above.

Renewal: Option to extend for up to a further 9 years in increments at UUs discretion.

## Key Details

| Field | Value |
| --- | --- |
| Publication source | Find A Tender Service |
| Latest notice | https://www.find-tender.service.gov.uk/Notice/105517-2026 |
| Notice type | UK4 - Tender Notice |
| Procurement type | Framework |
| Procurement category | Services |
| Procurement method | Open |
| Procurement method details | Competitive flexible procedure |
| Tender suitability | Not specified |
| Awardee scale | Not specified |
| All stages | Tender |

## Dates

| Field | Value |
| --- | --- |
| Publication date | 6 Nov 2026 |
| Submission deadline | 30 Nov 2026 |
| Future notice date | Not specified |
| Award date | Not specified |
| Contract period | 15 Apr 2027 - 14 Apr 2031 |
| Recurrence | Not specified |

## Values

| Field | Value |
| --- | --- |
| Tender value | £600,000,000 |
| Lots value | £600,000,000 |
| Awards value | Not specified |
| Contracts value | Not specified |

## Status

| Field | Value |
| --- | --- |
| Tender status | Active |
| Lots status | Active |
| Awards status | Not specified |
| Contracts status | Not specified |

## Buyer

| Field | Value |
| --- | --- |
| Main buyer | United Utilities Water Limited |
| Locality | WARRINGTON |
| Postcode area | Warrington |
| Postcode | WA5 3LP |
| Country | England |
| ITL 1 | TLD North West (England) |
| ITL 2 | TLD6 Cheshire |
| ITL 3 | TLD61 Warrington |
| Local authority | Warrington |
| Electoral ward | Great Sankey North and Whittle Hall |
| Westminster constituency | Warrington South |
| Delivery location | TLD North West (England) |

## CPV Codes

### Divisions

- 45 - Construction work
- 70 - Real estate services
- 71 - Architectural, construction, engineering and inspection services
- 72 - IT services: consulting, software development, Internet and support
- 77 - Agricultural, forestry, horticultural, aquacultural and apicultural services
- 79 - Business services: law, marketing, consulting, recruitment, printing and security
- 90 - Sewage, refuse, cleaning and environmental services

### Codes

- 45111250 - Ground investigation work
- 70332100 - Land management services
- 71242000 - Project and design preparation, estimation of costs
- 71246000 - Determining and listing of quantities in construction
- 71310000 - Consultative engineering and construction services
- 71311000 - Civil engineering consultancy services
- 71313400 - Environmental impact assessment for construction
- 71313410 - Risk or hazard assessment for construction
- 71313420 - Environmental standards for construction
- 71313430 - Environmental indicators analysis for construction
- 71313440 - Environmental Impact Assessment (EIA) services for construction
- 71313450 - Environmental monitoring for construction
- 71320000 - Engineering design services
- 71321100 - Construction economics services
- 71322000 - Engineering design services for the construction of civil engineering works
- 71322100 - Quantity surveying services for civil engineering works
- 71322200 - Pipeline-design services
- 71324000 - Quantity surveying services
- 71333000 - Mechanical engineering services
- 71334000 - Mechanical and electrical engineering services
- 71351200 - Geological and geophysical consultancy services
- 71351210 - Geophysical consultancy services
- 71351500 - Ground investigation services
- 71351720 - Geophysical surveys of archaeological sites
- 71351810 - Topographical services
- 71351811 - Topographical surveys of archaeological sites
- 71351914 - Archaeological services
- 71354500 - Marine survey services
- 71420000 - Landscape architectural services
- 71500000 - Construction-related services
- 71530000 - Construction consultancy services
- 71540000 - Construction management services
- 71541000 - Construction project management services
- 71800000 - Consulting services for water-supply and waste consultancy
- 72224000 - Project management consultancy services
- 72242000 - Design-modelling services
- 77100000 - Agricultural services
- 79415200 - Design consultancy services
- 79420000 - Management-related services
- 79930000 - Specialty design services
- 90700000 - Environmental services
- 90711400 - Environmental Impact Assessment (EIA) services other than for construction
- 90712000 - Environmental planning

## Release History

- 6 Nov 2026 at 09:23 - TenderUpdate - UK4 - Tender Notice - https://www.find-tender.service.gov.uk/Notice/105517-2026
- 5 Nov 2026 at 17:27 - Tender - UK4 - Tender Notice - https://www.find-tender.service.gov.uk/Notice/105451-2026

## Documents

- https://www.find-tender.service.gov.uk/Notice/105517-2026
  6th November 2026 - Tender notice on Find a Tender
- https://www.find-tender.service.gov.uk/Notice/105451-2026
  5th November 2026 - Tender notice on Find a Tender

## Notice URLs

- https://uk.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=109426&TID100114470&B=
- https://www.legislation.gov.uk/ukpga/2023/54/contents
- https://www.unitedutilities.com

## Provenance

This Markdown file is an alternate public rendering of the D3 Tenders contract record. The canonical page is https://d3tenders.com/contract/?ocid=ocds-h6vhtk-07b5da. The underlying structured data is available as OCDS JSON at https://d3tenders.com/contract/ocds-h6vhtk-07b5da.json.