---
title: "Boiler room replacement - Sheltered scheme"
ocid: "ocds-h6vhtk-07b8da"
canonical_url: "https://d3tenders.com/contract/?ocid=ocds-h6vhtk-07b8da"
markdown_url: "https://d3tenders.com/contract/ocds-h6vhtk-07b8da.md"
json_url: "https://d3tenders.com/contract/ocds-h6vhtk-07b8da.json"
source: "Find A Tender Service"
current_stage: "Award"
buyer: "Progress Housing Group"
published: "2026-11-10"
---

# Boiler room replacement - Sheltered scheme

Buyer: Progress Housing Group  
Current stage: Award  
OCID: ocds-h6vhtk-07b8da

[View canonical contract page](https://d3tenders.com/contract/?ocid=ocds-h6vhtk-07b8da)  
[Download OCDS JSON](https://d3tenders.com/contract/ocds-h6vhtk-07b8da.json)

## Summary

Progress Housing Group Limited bought a complete boiler-room refurbishment for its sheltered housing properties. The works cover design, supply, installation, testing and commissioning, including boilers, flues, controls and electrical supplies, pipework, pumps and associated equipment within the plant rooms. The contractor acts as main contractor and is responsible for all aspects of the work. This is building refurbishment and boiler installation work (CPV 45453100 and 45331110). Delivery is in the North West of England. The requirement is focused on upgrading heating plant and associated building services in sheltered housing, rather than general housing maintenance or a standalone supply of boilers. Broad Oak Properties Limited was selected to carry out the works.

The procurement is complete and the contract was awarded to Broad Oak Properties Limited. Progress Housing Group Limited used a limited procedure by direct award without prior publication of a competition, under a framework, for repeated works. The authority cited continuity, the incumbent’s understanding of its operations and the cost and disruption of switching suppliers as reasons for the route. The contract is valued at £600,000. It was signed on 31 March 2026; the contract period is not stated. The tender evaluation used price as the award criterion. The requirement was arranged as one lot, but that lot is recorded as cancelled while the overall tender is complete and the related award and contract are active. One bid was recorded, from an SME.

This award shows a recurring requirement for substantial, end-to-end boiler-room upgrades across sheltered housing, with the contractor taking main-contractor responsibility rather than supplying a single trade package. A credible competitor for similar work would need to demonstrate the capability to design, supply, install, test and commission complete plant-room systems, coordinating boilers, flues, controls, electrical work, pipework, pumps and ancillary components. Experience working in sheltered housing and maintaining continuity for residents would help address the operational concerns that supported this direct award. Suppliers should be able to evidence dependable delivery, capacity to manage all workstreams and a sound understanding of building services and plant-room integration. The buyer also valued established operational knowledge, satisfactory prior performance and reduced mobilisation and transition costs, so a new entrant would need a strong plan for achieving those outcomes.

## Notice

Design, supply, installation, testing and commissioning of a complete boiler room refurbishment and associated building services.

### Lot Information

Lot 1

The Performance Specification covers the work associated with the installation work involving a full boiler room refurbishment upgrade including boilers, flue, controls/Electrical supplies, pipework, pumps, and all ancillaries located within the plant rooms to the sheltered housing properties as per the details in the ITT In this instance the Contractor will be the Main Contractor and will be responsible for all aspects of the work.

### Procurement Information

The proposed direct award has been undertaken in accordance with the terms and conditions of the framework agreement and the provisions of the Public Contracts Regulations 2015. The Authority has assessed the available routes to market under the framework and considers direct award to represent the most economically advantageous approach in the circumstances. The incumbent supplier has an established understanding of the Authority's operational environment, service requirements, governance arrangements and technical landscape, having previously mobilised resources and successfully delivered services aligned to our operational needs. Awarding the requirement to an alternative supplier would necessitate a new mobilisation phase and introduce significant additional costs associated with onboarding, integration, knowledge transfer, training and transition activities. Direct award to the incumbent supplier avoids the duplication of mobilisation and set-up costs, delivering better overall value for money over the contract term. It also maintains continuity of service, reduces operational disruption and mitigates risks associated with transitioning to a new provider, including potential impacts on service performance, user adoption and business operations. The supplier has demonstrated satisfactory performance under the framework and has the capability, capacity and expertise to continue delivering the required services. Taking account of the total cost of ownership, service continuity requirements, mobilisation implications and associated delivery risks, the Authority considers direct award to the incumbent supplier to be a proportionate and value-for-money approach that is consistent with the framework rules and the principles of PCR 2015.

## Key Details

| Field | Value |
| --- | --- |
| Publication source | Find A Tender Service |
| Latest notice | https://www.find-tender.service.gov.uk/Notice/106798-2026 |
| Notice type | Award Notice |
| Procurement type | Standard |
| Procurement category | Works |
| Procurement method | Limited |
| Procurement method details | Award procedure without prior publication of a call for competition |
| Tender suitability | Not specified |
| Awardee scale | SME |
| All stages | Award |

## Dates

| Field | Value |
| --- | --- |
| Publication date | 10 Nov 2026 |
| Submission deadline | Not specified |
| Future notice date | Not specified |
| Award date | Not specified |
| Contract period | Not specified |
| Recurrence | Not specified |

## Values

| Field | Value |
| --- | --- |
| Tender value | Not specified |
| Lots value | Not specified |
| Awards value | Not specified |
| Contracts value | £600,000 |

## Status

| Field | Value |
| --- | --- |
| Tender status | Complete |
| Lots status | Cancelled |
| Awards status | Active |
| Contracts status | Active |

## Buyer

| Field | Value |
| --- | --- |
| Main buyer | Progress Housing Group |
| Locality | LEYLAND |
| Postcode area | Preston |
| Postcode | PR25 2LW |
| Country | England |
| ITL 1 | TLD North West (England) |
| ITL 2 | TLD4 Lancashire |
| ITL 3 | TLD45 Mid Lancashire |
| Local authority | South Ribble |
| Electoral ward | Leyland Central |
| Westminster constituency | South Ribble |
| Delivery location | TLD North West (England) |

## Supplier

| Field | Value |
| --- | --- |
| Number of suppliers | 1 |
| Supplier names | Broad Oak Properties Ltd |

## CPV Codes

### Divisions

- 45 - Construction work

### Codes

- 45331110 - Boiler installation work
- 45453100 - Refurbishment work

## Release History

- 10 Nov 2026 at 15:42 - Award - Award Notice - https://www.find-tender.service.gov.uk/Notice/106798-2026

## Notice URLs

- https://www.broadoakgroup.com/
- https://www.progressgroup.org.uk/

## Provenance

This Markdown file is an alternate public rendering of the D3 Tenders contract record. The canonical page is https://d3tenders.com/contract/?ocid=ocds-h6vhtk-07b8da. The underlying structured data is available as OCDS JSON at https://d3tenders.com/contract/ocds-h6vhtk-07b8da.json.
