---
title: "Earthing and Bonding"
ocid: "ocds-kuma6s-118840"
canonical_url: "https://d3tenders.com/contract/?ocid=ocds-kuma6s-118840"
markdown_url: "https://d3tenders.com/contract/ocds-kuma6s-118840.md"
json_url: "https://d3tenders.com/contract/ocds-kuma6s-118840.json"
source: "Sell2Wales"
current_stage: "Award"
buyer: "TRANSPORT FOR WALES"
published: "2022-07-28"
---

# Earthing and Bonding

Buyer: TRANSPORT FOR WALES  
Current stage: Award  
OCID: ocds-kuma6s-118840

[View canonical contract page](https://d3tenders.com/contract/?ocid=ocds-kuma6s-118840)  
[Download OCDS JSON](https://d3tenders.com/contract/ocds-kuma6s-118840.json)

## Summary

Transport for Wales has issued a tender for "Earthing and Bonding" works essential for the electrification of the Core Valley Lines, located in Pontypridd, UK. This procurement falls within the works category and was initiated through an open procedure. Key dates include the bid submission deadline, which has been extended to 31 March 2022, with the contract valued at £12 million. The tender is part of a framework agreement intended for urgent works and aims to appoint up to four contractors capable of executing required tasks in compliance with railway safety standards.

This tender presents significant growth opportunities for businesses specialising in electrical and construction services within the transport sector. Large and small to medium enterprises (SMEs) with expertise in rail-related safety systems, bonding, and earthing installations will benefit from this tender. Companies that can demonstrate an ability to deliver high-quality services and compliance with the rigorous safety standards required for live rail environments are particularly well-suited to compete for this contract. Additionally, successful bidders will be expected to contribute to community benefits, aligning with social and environmental objectives set forth by Transport for Wales.

## Notice

This requirement is needed to enable the successful electrification of the Core Valley Lines. E&B will play a key part in ensuring the safety of all personnel working on or near the rail, and of rail service users and customers once the line sections are energised. An effective E&B system will assist in minimising any identified Electromagnetic Compatibility (EMC) issues across an installation. Earthing and Bonding will need to be installed across the route, on all OLE assets, stations, bridges, fences and other metal assets to: - Ensure personal safety for those located on or about the railway, - Provide a safe return path for current in the event of an electrical fault, - Provide a return current path for normal load current; and - Ensure the correct operation of electrical protection systems.

### Lot Information

Lot 1

The purpose of this tender is to identify and appoint competent contractors to undertake works in relation to Earthing and Boding in a live/working rail environment. This work is required to provide key installations and allow access to the rail for incumbent TfW Infrastructure Delivery Partners (IDPs) to complete their works, and ensure the network is compliant to standards applicable to an electrified railway. Mini-competition will be utilised as the primary call-off process under this Framework, with a direct award allocation process reserved for urgent requirements only. Should the need arise for this work outside of CVL, the Buyer and their subsidiaries reserve the right to utilise this framework for works appropriate to the scope within this framework as long as value for money can be demonstrated. For the avoidance of doubt this may include similar works on alternative lines and locations not within the CVL. The potential work to be procured via this framework covers E&B works at various locations including: - Signalling power supplies (FSP) - Points heating - Telecoms equipment - Traction bonding - Junction lighting - OCS motorized switches - Signalling structures & trackside equipment - Stations - Depots - DNO cubicles - Bridges and other metal/steel structures - Metal/steel fencing - Arbitrary metal/steel trackside enclosures - Third party assets outside the WCB and CVL -Boundaries - Metal / Steel Handrails - IBJ's / IRJ's - Sidings

Renewal: There may be a requirement to undertake this work after the FW expires in 3 years

## Key Details

| Field | Value |
| --- | --- |
| Publication source | Sell2Wales |
| Latest notice | https://www.sell2wales.gov.wales/search/search_switch.aspx?ID=118840 |
| Notice type | OJEU - F3 - Contract Award Notice |
| Procurement type | Framework |
| Procurement category | Works |
| Procurement method | Open |
| Procurement method details | Open procedure |
| Tender suitability | Not specified |
| Awardee scale | Large, SME |
| All stages | Tender, Award |

## Dates

| Field | Value |
| --- | --- |
| Publication date | 28 Jul 2022 |
| Submission deadline | 24 Mar 2022 |
| Future notice date | Not specified |
| Award date | 28 Jul 2022 |
| Contract period | Not specified |
| Recurrence | if further procurement of these works are required the anticipated date will be 2025 |

## Values

| Field | Value |
| --- | --- |
| Tender value | £12,000,000 |
| Lots value | Not specified |
| Awards value | Not specified |
| Contracts value | £12,000,000 |

## Status

| Field | Value |
| --- | --- |
| Tender status | Complete |
| Lots status | Complete |
| Awards status | Not specified |
| Contracts status | Active |

## Buyer

| Field | Value |
| --- | --- |
| Main buyer | TRANSPORT FOR WALES |
| Locality | PONTYPRIDD |
| Post town | Cardiff |
| Postcode | CF37 4TH |
| Country | Wales |
| ITL 1 | TLL Wales |
| ITL 2 | TLL5 South East Wales |
| ITL 3 | TLL51 Central Valleys and Bridgend |
| Local authority | Rhondda Cynon Taf |
| Electoral ward | Pontypridd Town |
| Westminster constituency | Pontypridd |
| Delivery location | Not specified |

## Supplier

| Field | Value |
| --- | --- |
| Number of suppliers | 4 |
| Supplier names | AMALGAMATED CONSTRUCTION; BALFOUR BEATTY RAIL; BCM CONSTRUCTION; KELTBRAY RAIL |

## CPV Codes

### Divisions

- 34 - Transport equipment and auxiliary products to transportation
- 45 - Construction work
- 50 - Repair and maintenance services

### Codes

- 34632200 - Electrical signalling equipment for railways
- 34632300 - Electrical installations for railways
- 34946000 - Railway-track construction materials and supplies
- 34946100 - Railway-track construction materials
- 45234000 - Construction work for railways and cable transport systems
- 45234100 - Railway construction works
- 45234115 - Railway signalling works
- 50225000 - Railway-track maintenance services

## Release History

- 28 Jul 2022 at 00:00 - Award - OJEU - F3 - Contract Award Notice - https://www.sell2wales.gov.wales/search/search_switch.aspx?ID=118840
- 21 Mar 2022 at 00:00 - TenderUpdate - OJEU - F14 - Corrigendum - https://www.sell2wales.gov.wales/search/search_switch.aspx?ID=118840
- 22 Feb 2022 at 00:00 - Tender - OJEU - F2 - Contract Notice - https://www.sell2wales.gov.wales/search/search_switch.aspx?ID=118840

## Documents

- https://www.sell2wales.gov.wales/search/show/search_view.aspx?ID=FEB389362
  Earthing and Bonding - This requirement is needed to enable the successful electrification of the Core Valley Lines. E&B will play a key part in ensuring the safety of all personnel working on or near the rail, and of rail service users and customers once the line sections are energised. An effective E&B system will assist in minimising any identified Electromagnetic Compatibility (EMC) issues across an installation. Earthing and Bonding will need to be installed across the route, on all OLE assets, stations, bridges, fences and other metal assets to: - Ensure personal safety for those located on or about the railway, - Provide a safe return path for current in the event of an electrical fault, - Provide a return current path for normal load current; and - Ensure the correct operation of electrical protection systems.
- https://www.sell2wales.gov.wales/search/show/search_view.aspx?ID=JUL406019
  Earthing and Bonding - This requirement is needed to enable the successful electrification of the Core Valley Lines. E&B will play a key part in ensuring the safety of all personnel working on or near the rail, and of rail service users and customers once the line sections are energised. An effective E&B system will assist in minimising any identified Electromagnetic Compatibility (EMC) issues across an installation. Earthing and Bonding will need to be installed across the route, on all OLE assets, stations, bridges, fences and other metal assets to: - Ensure personal safety for those located on or about the railway, - Provide a safe return path for current in the event of an electrical fault, - Provide a return current path for normal load current; and - Ensure the correct operation of electrical protection systems.

## Notice URLs

- http://trc.cymru
- https://api.sell2wales.gov.wales/v1?lang=cy/Notice?id=ocds-kuma6s-118840
- https://etenderwales.bravosolution.co.uk
- https://etenderwales.bravosolution.co.uk/esop/guest/login.do

## Provenance

This Markdown file is an alternate public rendering of the D3 Tenders contract record. The canonical page is https://d3tenders.com/contract/?ocid=ocds-kuma6s-118840. The underlying structured data is available as OCDS JSON at https://d3tenders.com/contract/ocds-kuma6s-118840.json.
