title: "TfW Core Valley Lines Transformation - Rhymney Valley, Coryton and Bay Lines Electrification"
ocid: "ocds-kuma6s-122940"
canonical_url: "https://d3tenders.com/contract/?ocid=ocds-kuma6s-122940"
markdown_url: "https://d3tenders.com/contract/ocds-kuma6s-122940.md"
json_url: "https://d3tenders.com/contract/ocds-kuma6s-122940.json"
source: "Sell2Wales"
current_stage: "Planning"
buyer: "TRANSPORT FOR WALES"
published: "2022-07-13"
---

# TfW Core Valley Lines Transformation - Rhymney Valley, Coryton and Bay Lines Electrification

Buyer: TRANSPORT FOR WALES  
Current stage: Planning  
OCID: ocds-kuma6s-122940

[View canonical contract page](https://d3tenders.com/contract/?ocid=ocds-kuma6s-122940)  
[Download OCDS JSON](https://d3tenders.com/contract/ocds-kuma6s-122940.json)

## Summary

The tender titled "TfW Core Valley Lines Transformation - Rhymney Valley, Coryton and Bay Lines Electrification," initiated by Transport for Wales, is currently in the planning stage. Located in Pontypridd, this procurement is part of the rail industry category. Key deadlines for completion of works include the final registration of various route sections by 23rd October 2023 for the Queen Street North route, 15th June 2023 for the Bay route, and 1st May 2024 for the Rhymney route. The tender process involves a design and build contract that will require suppliers to adopt existing outline designs and deliver various rail electrification works, including the establishment of a materials distribution centre.

This opportunity will be particularly beneficial for construction and engineering firms with expertise in rail works and project management, particularly those capable of managing complex supply chains and logistics. Businesses that specialise in materials quality control, the installation of overhead line equipment, and those with experience in handling European Regional Development Funds would be well-positioned to compete. By engaging in this tender, companies can contribute to significant infrastructural developments which aim to enhance the South Wales Metro transport system.

## Notice

The CVL Transformation programme of works forms an important part of the South Wales Metro and includes an ambitious and extensive range of rail works including electrification of circa 170km of track, new stations, major refurbishment / extension of stations and associated ancillary works. Programme constraints dictate that a supplier be appointed to undertake the works prior to completion of detailed design. The supplier shall be appointed on a design and build basis. The supplier shall be furnished with available outline designs, which they shall adopt and provide design liability for and, subsequently undertake the detailed design and installation. The qualitative and commercial elements of this procurement event therefore seek to ensure TfW appoint a supplier who will deliver the works in a collaborative and cost-efficient manner. The overarching deliverables for the works are: - Establish and manage a materials distribution center (MDC) within a locality of the works which facilitates storage and expeditious delivery of materials to the worksites. - Provision of a comprehensive materials quality control & material management system which can, but not be limited to the following functions: receive inputs (AFC designs, bills of materials, programme dates, track all stages of installation and associated quality checks and the like), take cognisance of stock levels, produce outputs (material order details) and align material allocations to site locations. - Establish and provide a team of subject matter experts to undertake detailed design and manage the works from works delivery and contract administration standpoint. - Procurement of materials required for construction of OLE system. - Delivery of a full OLE system from foundations to final registration for 13.205 single track kilometers (STK) on the Queen Street North route section, 1.5 STK on the Bay route section, and 45.555 STK on the Rhymney route section. The works that form the basis of this procurement event are partly funded by European Regional Development Funds (ERDF) resulting in prescriptive dates by which the ERDF monies must be expended. This therefore dictates the following completion dates for the works: - Final Registration of Queen Street North route section by 23/10/2023 - Final Registration of Bay route section by 15/06/2023 - Final Registration of Rhymney route section by 01/05/24 Specific OLE deliverables include, but are not limited to the design and construction of: - Foundation Installation - Circular Hollow Sections (CHS) piles, auger piles, concrete pads, plunge piles. - Mast Installation - single track cantilever masts, self-supporting anchor masts, twin track cantilever masts, portal masts. - Booms. - Ties, struts and small part steel including tensioning system etc - Switching including platforms as required - Wiring. - Final registration.

### Lot Information

Lot 1

Design and installation of Overhead Line Equipment for the electrification of rail lines in Wales.

## Key Details

| Field | Value |
| --- | --- |
| Publication source | Sell2Wales |
| Latest notice | https://www.sell2wales.gov.wales/search/search_switch.aspx?ID=122940 |
| Notice type | OJEU - F1 - Prior Information Notice |
| Procurement type | Standard |
| Procurement category | Works |
| Procurement method | Not Specified |
| Procurement method details | Not specified |
| Tender suitability | Not specified |
| Awardee scale | Not specified |
| All stages | Planning |

## Dates

| Field | Value |
| --- | --- |
| Publication date | 13 Jul 2022 |
| Submission deadline | 5 Sep 2022 |
| Future notice date | 18 Aug 2022 |
| Award date | Not specified |
| Contract period | Not specified |
| Recurrence | Not specified |

## Values

| Field | Value |
| --- | --- |
| Tender value | Not specified |
| Lots value | Not specified |
| Awards value | Not specified |
| Contracts value | Not specified |

## Status

| Field | Value |
| --- | --- |
| Tender status | Planned |
| Lots status | Planned |
| Awards status | Not specified |
| Contracts status | Not specified |

## Buyer

| Field | Value |
| --- | --- |
| Main buyer | TRANSPORT FOR WALES |
| Locality | PONTYPRIDD |
| Post town | Cardiff |
| Postcode | CF37 4TH |
| Country | Wales |
| ITL 1 | TLL Wales |
| ITL 2 | TLL5 South East Wales |
| ITL 3 | TLL51 Central Valleys and Bridgend |
| Local authority | Rhondda Cynon Taf |
| Electoral ward | Pontypridd Town |
| Westminster constituency | Pontypridd |
| Delivery location | TLL Wales |

## CPV Codes

### Divisions

- 45 - Construction work

### Codes

- 45234100 - Railway construction works

## Release History

- 13 Jul 2022 at 00:00 - Planning - OJEU - F1 - Prior Information Notice - https://www.sell2wales.gov.wales/search/search_switch.aspx?ID=122940

## Documents

- https://www.sell2wales.gov.wales/Notice/Download/DocumentDownload.aspx?id=JUL404777&idx=4
  3rd August 2022 - Design
- https://www.sell2wales.gov.wales/Notice/Download/DocumentDownload.aspx?id=JUL404777&idx=3
  3rd August 2022 - Designs
- https://www.sell2wales.gov.wales/Notice/Download/DocumentDownload.aspx?id=JUL404777&idx=2
  3rd August 2022 - Design Doc Register
- https://www.sell2wales.gov.wales/Notice/Download/DocumentDownload.aspx?id=JUL404777&idx=1
  15th July 2022 - Blank Document. No action required.
- https://www.sell2wales.gov.wales/search/show/search_view.aspx?ID=JUL404777
  TfW Core Valley Lines Transformation - Rhymney Valley, Coryton and Bay Lines Electrification - The CVL Transformation programme of works forms an important part of the South Wales Metro and includes an ambitious and extensive range of rail works including electrification of circa 170km of track, new stations, major refurbishment / extension of stations and associated ancillary works. Programme constraints dictate that a supplier be appointed to undertake the works prior to completion of detailed design. The supplier shall be appointed on a design and build basis. The supplier shall be furnished with available outline designs, which they shall adopt and provide design liability for and, subsequently undertake the detailed design and installation. The qualitative and commercial elements of this procurement event therefore seek to ensure TfW appoint a supplier who will deliver the works in a collaborative and cost-efficient manner. The overarching deliverables for the works are: - Establish and manage a materials distribution center (MDC) within a locality of the works which facilitates storage and expeditious delivery of materials to the worksites. - Provision of a comprehensive materials quality control & material management system which can, but not be limited to the following functions: receive inputs (AFC designs, bills of materials, programme dates, track all stages of installation and associated quality checks and the like), take cognisance of stock levels, produce outputs (material order details) and align material allocations to site locations. - Establish and provide a team of subject matter experts to undertake detailed design and manage the works from works delivery and contract administration standpoint. - Procurement of materials required for construction of OLE system. - Delivery of a full OLE system from foundations to final registration for 13.205 single track kilometers (STK) on the Queen Street North route section, 1.5 STK on the Bay route section, and 45.555 STK on the Rhymney route section. The works that form the basis of this procurement event are partly funded by European Regional Development Funds (ERDF) resulting in prescriptive dates by which the ERDF monies must be expended. This therefore dictates the following completion dates for the works: - Final Registration of Queen Street North route section by 23/10/2023 - Final Registration of Bay route section by 15/06/2023 - Final Registration of Rhymney route section by 01/05/24 Specific OLE deliverables include, but are not limited to the design and construction of: - Foundation Installation - Circular Hollow Sections (CHS) piles, auger piles, concrete pads, plunge piles. - Mast Installation - single track cantilever masts, self-supporting anchor masts, twin track cantilever masts, portal masts. - Booms. - Ties, struts and small part steel including tensioning system etc - Switching including platforms as required - Wiring. - Final registration.

## Notice URLs

- http://tfw.wales
- https://api.sell2wales.gov.wales/v1?lang=cy/Notice?id=ocds-kuma6s-122940
- https://www.sell2wales.gov.wales/
- https://www.sell2wales.gov.wales/Search/Search_Switch.aspx?ID=122940

## Provenance

This Markdown file is an alternate public rendering of the D3 Tenders contract record. The canonical page is https://d3tenders.com/contract/?ocid=ocds-kuma6s-122940. The underlying structured data is available as OCDS JSON at https://d3tenders.com/contract/ocds-kuma6s-122940.json.