---
title: "Ffordd Bleddyn"
ocid: "ocds-kuma6s-148527"
canonical_url: "https://d3tenders.com/contract/?ocid=ocds-kuma6s-148527"
markdown_url: "https://d3tenders.com/contract/ocds-kuma6s-148527.md"
json_url: "https://d3tenders.com/contract/ocds-kuma6s-148527.json"
source: "Sell2Wales"
current_stage: "Award"
buyer: "TRANSPORT FOR WALES"
published: "2025-04-10"
---

# Ffordd Bleddyn

Buyer: TRANSPORT FOR WALES  
Current stage: Award  
OCID: ocds-kuma6s-148527

[View canonical contract page](https://d3tenders.com/contract/?ocid=ocds-kuma6s-148527)  
[Download OCDS JSON](https://d3tenders.com/contract/ocds-kuma6s-148527.json)

## Summary

Transport for Wales, based in Pontypridd, has progressed to the award stage for the procurement of the completion of construction works for a new overbridge at Ffordd Bleddyn. This procurement falls under the works category and includes additional tasks such as highway realignment, utility diversions, drainage, street lighting, and installation of traffic signals. The contract was awarded to Involve Rail Ltd and was signed on 9th April 2025. The tender was initiated in an open procurement process with the tender period concluding on 21st March 2025 and the award period ending on 4th April 2025.

This contract presents substantial opportunities for businesses involved in civil engineering, electrical installation, and construction, particularly those specialising in bridgework, road signalling, ground drainage, and fencing. Companies with expertise in these areas stand to benefit from the specific requirements outlined by Transport for Wales, including the installation of signalling equipment and traffic signals, maintenance of traffic management systems, and various street and civil works. The scope of the project allows for consortium bids, making it advantageous for collaborative ventures seeking to enhance their business growth through significant infrastructure projects.

## Notice

This Scope relates to the completion of outstanding scope of the construction of a new overbridge at Ffordd Bleddyn. In addition to the bridge, the recently completed construction works included highway realignment and utility diversions.Works Completed by Others, include but are not limited to the following, and are to be verified by the Contractor;* Cabling/Switchover Works,o Cabling and electrical switchover works as part of the traffic management (TM) phase 1,* BT Chamber Removal and backfill,* Southeast (SE) Corner Civil Works,o The reinforced concrete (RC) base for the a Vehicle Restraint System (VRS) was installed,o Signage, the RC foundation for Column 2N, signal sockets, edgings, tactile paving, and VRS were installed,o Construction of Taff Trail footpath corner,* Column Installation,o Column 2N was erected at the designated location and all necessary connections were made,o The electrical connection was completed between Column 2N and Column 1N,* Site Clean-Up and Boundary Installation,o The boundary fence was installed along the VRS/guardrails, securing the area,* Road Reopening,o The road was reopened to traffic under temporary traffic light control and pedestrian crossings.* Any other completed works completed by Others.The works to be completed, include but are not limited to the following, and are to be verified by the Contractor;* Cardiff Road drainage works,* Cardiff Road Civils work - install traffic signal NALs, chamber, ducting, height extension to existing steel parapet to cycleway,* Cardiff Road Civils work - Street Light ducting, chamber, and column 1N RC foundation. Kerbs, Edgings, Tactiles, Signs, Ped Guardrails, tarmac to binder level etc.,* Install traffic signal poles, lights, push buttons, and cabling,* Maintain existing temporary TM arrangements until permanent TM has been installed and commissioned,* Remove TM and re-open road fully to the public under the new permanent traffic light system,* Palisade fencing works along the track and top of the wingwall,* Knotweed removal by hand,* Install key clamp up the wingwall and waterproofing,* Install boundary fence on the batter and finish topsoil around this area,* Profile planing required on Cardiff Road and footpaths.* Install plug joints, install tarmac on Cardiff Road,* install ped guardrail to close off south footpath, surface south footpath, and finish road markings,* any other incomplete works required by this Contract.

## Key Details

| Field | Value |
| --- | --- |
| Publication source | Sell2Wales |
| Latest notice | https://www.sell2wales.gov.wales/search/search_switch.aspx?ID=148527 |
| Notice type | S2W Notice - Website Contract Award Notice |
| Procurement type | Standard |
| Procurement category | Works |
| Procurement method | Open |
| Procurement method details | Not specified |
| Tender suitability | Not specified |
| Awardee scale | Not specified |
| All stages | Tender, Award |

## Dates

| Field | Value |
| --- | --- |
| Publication date | 10 Apr 2025 |
| Submission deadline | 21 Mar 2025 |
| Future notice date | Not specified |
| Award date | 9 Apr 2025 |
| Contract period | Not specified |
| Recurrence | Not specified |

## Values

| Field | Value |
| --- | --- |
| Tender value | Not specified |
| Lots value | Not specified |
| Awards value | Not specified |
| Contracts value | Not specified |

## Status

| Field | Value |
| --- | --- |
| Tender status | Not specified |
| Lots status | Not specified |
| Awards status | Not specified |
| Contracts status | Active |

## Buyer

| Field | Value |
| --- | --- |
| Main buyer | TRANSPORT FOR WALES |
| Locality | PONTYPRIDD |
| Post town | Cardiff |
| Postcode | CF37 4TH |
| Country | Wales |
| ITL 1 | TLL Wales |
| ITL 2 | TLL5 South East Wales |
| ITL 3 | TLL51 Central Valleys and Bridgend |
| Local authority | Rhondda Cynon Taf |
| Electoral ward | Pontypridd Town |
| Westminster constituency | Pontypridd |
| Delivery location | Not specified |

## Supplier

| Field | Value |
| --- | --- |
| Number of suppliers | 1 |
| Supplier names | INVOLVE RAIL |

## CPV Codes

### Divisions

- 31 - Electrical machinery, apparatus, equipment and consumables; lighting
- 34 - Transport equipment and auxiliary products to transportation
- 44 - Construction structures and materials; auxiliary products to construction (except electric apparatus)
- 45 - Construction work
- 50 - Repair and maintenance services

### Codes

- 31518000 - Signalling lights
- 34942000 - Signalling equipment
- 34990000 - Control, safety, signalling and light equipment
- 44115100 - Ducting
- 44212100 - Bridge
- 45111240 - Ground-drainage work
- 45213321 - Railway station construction work
- 45221100 - Construction work for bridges
- 45221110 - Bridge construction work
- 45221112 - Railway bridge construction work
- 45221113 - Footbridge construction work
- 45232450 - Drainage construction works
- 45232452 - Drainage works
- 45233000 - Construction, foundation and surface works for highways, roads
- 45233130 - Construction work for highways
- 45233294 - Installation of road signals
- 45234100 - Railway construction works
- 45234116 - Track construction works
- 45262210 - Foundation work
- 45316200 - Installation of signalling equipment
- 45340000 - Fencing, railing and safety equipment installation work
- 50232200 - Traffic-signal maintenance services

## Release History

- 10 Apr 2025 at 10:22 - Award - S2W Notice - Website Contract Award Notice - https://www.sell2wales.gov.wales/search/search_switch.aspx?ID=148527
- 26 Feb 2025 at 08:40 - Tender - S2W Notice - Website Invitation to Tender Notice - https://www.sell2wales.gov.wales/search/search_switch.aspx?ID=148527

## Documents

- https://www.sell2wales.gov.wales/Notice/Download/DocumentDownload.aspx?id=FEB497953&idx=10
  18th March 2025 - Please find attached the documents relating to TQ 11.
- https://www.sell2wales.gov.wales/Notice/Download/DocumentDownload.aspx?id=FEB497953&idx=9
  12th March 2025 - Statutory Undertakers Information have been split into 2 folders due to their size. File 2 of 2.
- https://www.sell2wales.gov.wales/Notice/Download/DocumentDownload.aspx?id=FEB497953&idx=8
  12th March 2025 - Statutory Undertakers Information files have been split into two folders due to their size. File 1/2
- https://www.sell2wales.gov.wales/Notice/Download/DocumentDownload.aspx?id=FEB497953&idx=7
  7th March 2025 - PFA revised Part 1 ITT & Part 2 Questionnaire. Kindly refer to the additional information for update
- https://www.sell2wales.gov.wales/Notice/Download/DocumentDownload.aspx?id=FEB497953&idx=6
  7th March 2025 - PFA Ffordd Bleddyn Traffic Signal AFC Drawings.
- https://www.sell2wales.gov.wales/Notice/Download/DocumentDownload.aspx?id=FEB497953&idx=5
  7th March 2025 - PFA latest AFC drawings.
- https://www.sell2wales.gov.wales/Notice/Download/DocumentDownload.aspx?id=FEB497953&idx=4
  4th March 2025 - TRAN01-KAW-R0-TAF-DDR-D-ST-000378-A-C01 replacing/additional TRAN01-KAW-R0-TAF-DDR-D-ST-000378
- https://www.sell2wales.gov.wales/Notice/Download/DocumentDownload.aspx?id=FEB497953&idx=3
  4th March 2025 - TRAN01-KAW-R0-TAF-DDR-D-ST-000367 replacing TRAN01-KAW-R0-TAF-DDR-D-ST-000367-S3-C01
- https://www.sell2wales.gov.wales/Notice/Download/DocumentDownload.aspx?id=FEB497953&idx=2
  4th March 2025 - Please find site information attached.
- https://www.sell2wales.gov.wales/Notice/Download/DocumentDownload.aspx?id=FEB497953&idx=1
  26th February 2025 - Ffordd Bleddyn

## Notice URLs

- https://www.sell2wales.gov.wales

## Provenance

This Markdown file is an alternate public rendering of the D3 Tenders contract record. The canonical page is https://d3tenders.com/contract/?ocid=ocds-kuma6s-148527. The underlying structured data is available as OCDS JSON at https://d3tenders.com/contract/ocds-kuma6s-148527.json.
