---
title: "Energy Park Fife - Environmental Improvements (P17-0132)"
ocid: "ocds-r6ebe6-0000477276"
canonical_url: "https://d3tenders.com/contract/?ocid=ocds-r6ebe6-0000477276"
markdown_url: "https://d3tenders.com/contract/ocds-r6ebe6-0000477276.md"
json_url: "https://d3tenders.com/contract/ocds-r6ebe6-0000477276.json"
source: "Public Contracts Scotland"
current_stage: "Award"
buyer: "SCOTTISH ENTERPRISE"
published: "2017-08-10"
---

# Energy Park Fife - Environmental Improvements (P17-0132)

Buyer: SCOTTISH ENTERPRISE  
Current stage: Award  
OCID: ocds-r6ebe6-0000477276

[View canonical contract page](https://d3tenders.com/contract/?ocid=ocds-r6ebe6-0000477276)  
[Download OCDS JSON](https://d3tenders.com/contract/ocds-r6ebe6-0000477276.json)

## Summary

The procurement process, titled "Energy Park Fife - Environmental Improvements (P17-0132)," was initiated by Scottish Enterprise, a central purchasing body located in Glasgow, UK. This tender, categorised under works with an open procurement method, focuses on essential construction tasks, including the installation of a reinforced concrete slab and gabion basket retaining walls. The contract was signed on 31 July 2017, with a total value of £452,729.05 for the first phase of the project. Key components involve drainage systems and wave protection measures, showcasing a critical focus on environmental improvements within Fife.

This tender presents significant opportunities for businesses engaged in construction and civil engineering, particularly those experienced in large-scale infrastructure projects. Companies specialising in reinforced concrete works, drainage solutions, and coastal protection are well-positioned to compete. With the ongoing emphasis on sustainable practices and environmental stewardship in public works, this contract could pave the way for increased collaboration between the public sector and construction firms aiming to expand their portfolios in similar projects.

## Notice

The works are to comprise two principle elements: reinforced concrete slab with associated drainage adjacent to the BiFab fabrication shops and gabion basket retaining walls on the seaward face of the bing at the western end of the Park. The slab is to comprise reinforced concrete with new surface water drainage throughout. The slab is to support Extra Heavy SMPT loading. Some additional elements including services investigation, surface water soakaway construction and septic tank replacement and associated foul drainage will form part of the Contract. The retaining walls are to stabilise the seaward face of the bring and reduce washout from waves overtopping the existing rip rap defences. Works to the existing face will be required and some screening of site won material for fill will also form part of the Contract. Surface Water drainage is required to be installed at the rear of the wall.

### Lot Information

Lot 1

The works are to comprise two principle elements: reinforced concrete slab with associated drainage adjacent to the BiFab fabrication shops and gabion basket retaining walls on the seaward face of the bing at the western end of the Park. The slab is to comprise reinforced concrete with new surface water drainage throughout. The slab is to support Extra Heavy SMPT loading. Some additional elements including services investigation, surface water soakaway construction and septic tank replacement and associated foul drainage will form part of the Contract. The retaining walls are to stabilise the seaward face of the bring and reduce washout from waves overtopping the existing rip rap defences. Works to the existing face will be required and some screening of site won material for fill will also form part of the Contract. Surface Water drainage is required to be installed at the rear of the wall.

## Key Details

| Field | Value |
| --- | --- |
| Publication source | Public Contracts Scotland |
| Latest notice | https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=AUG292177 |
| Notice type | PCS Notice - Website Contract Award Notice |
| Procurement type | Standard |
| Procurement category | Works |
| Procurement method | Open |
| Procurement method details | Open procedure |
| Tender suitability | Not specified |
| Awardee scale | Large |
| All stages | Award |

## Dates

| Field | Value |
| --- | --- |
| Publication date | 10 Aug 2017 |
| Submission deadline | Not specified |
| Future notice date | Not specified |
| Award date | 31 Jul 2017 |
| Contract period | Not specified |
| Recurrence | Not specified |

## Values

| Field | Value |
| --- | --- |
| Tender value | Not specified |
| Lots value | Not specified |
| Awards value | Not specified |
| Contracts value | £452,729 |

## Status

| Field | Value |
| --- | --- |
| Tender status | Complete |
| Lots status | Complete |
| Awards status | Not specified |
| Contracts status | Active |

## Buyer

| Field | Value |
| --- | --- |
| Main buyer | SCOTTISH ENTERPRISE |
| Locality | GLASGOW |
| Post town | Glasgow |
| Postcode | G2 6HQ |
| Country | Scotland |
| ITL 1 | TLM Scotland |
| ITL 2 | TLM3 West Central Scotland |
| ITL 3 | TLM32 Glasgow City |
| Local authority | Glasgow City |
| Electoral ward | Anderston/City/Yorkhill |
| Westminster constituency | Glasgow North |
| Delivery location | TLM Scotland |

## Supplier

| Field | Value |
| --- | --- |
| Number of suppliers | 1 |
| Supplier names | RJ MCLEOD (CONTRACTORS |

## CPV Codes

### Divisions

- 45 - Construction work

### Codes

- 45220000 - Engineering works and construction works

## Release History

- 10 Aug 2017 at 00:00 - Award - PCS Notice - Website Contract Award Notice - https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=AUG292177

## Documents

- https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=AUG292177
  Energy Park Fife - Environmental Improvements (P17-0132) - The works are to comprise two principle elements: reinforced concrete slab with associated drainage adjacent to the BiFab fabrication shops and gabion basket retaining walls on the seaward face of the bing at the western end of the Park. The slab is to comprise reinforced concrete with new surface water drainage throughout. The slab is to support Extra Heavy SMPT loading. Some additional elements including services investigation, surface water soakaway construction and septic tank replacement and associated foul drainage will form part of the Contract. The retaining walls are to stabilise the seaward face of the bring and reduce washout from waves overtopping the existing rip rap defences. Works to the existing face will be required and some screening of site won material for fill will also form part of the Contract. Surface Water drainage is required to be installed at the rear of the wall.

## Notice URLs

- http://
- http://www.scottish-enterprise.com/
- https://api.publiccontractsscotland.gov.uk/v1/Notice?id=ocds-r6ebe6-0000477276

## Provenance

This Markdown file is an alternate public rendering of the D3 Tenders contract record. The canonical page is https://d3tenders.com/contract/?ocid=ocds-r6ebe6-0000477276. The underlying structured data is available as OCDS JSON at https://d3tenders.com/contract/ocds-r6ebe6-0000477276.json.
