# Marybank Depot Pollution Control

Buyer: COMHAIRLE NAN EILEAN SIAR  
Current stage: Award  
OCID: ocds-r6ebe6-0000522708

[View canonical contract page](https://d3tenders.com/contract/?ocid=ocds-r6ebe6-0000522708)  
[Download OCDS JSON](https://d3tenders.com/contract/ocds-r6ebe6-0000522708.json)

## Summary

The procurement process for the “Marybank Depot Pollution Control” contract was conducted by Comhairle nan Eilean Siar, a regional authority based in Stornoway, UK. This project falls under the works category and aimed to address existing ground contamination and improve drainage systems at the Marybank site. The procurement was carried out using an open procedure, and the award was completed on 12th March 2018 with a contract value of £137,921.72. Key deadlines included the end of the tendering period on 24th January 2018 and the start of the award period on the same day.

This tender presents a significant opportunity for businesses specialising in environmental services, civil engineering, and construction works. Companies capable of handling infrastructure improvements and pollution control measures will find this contract particularly relevant. With the buying organisation being a local authority, successful bidders may also gain insight into future projects and tenders in the region, providing a pathway for sustained business growth and collaboration with public sector clients.

## Notice

The contract scope includes the following measures which will break the receptor pathway for existing ground contamination within the site as well as separating potentially contaminated surface water run off from clean run off: -Install concrete slab to working area to the rear of the garage -Improve roof rainwater infrastructure to segregate it from surface water run off -Improve capacity and handling measures for ground water run off entering the site from moor land to the rear. -Improve waste water infrastructure and connections to existing foul sewer. -Improve connections to existing oil interceptor.

### Lot Information

Lot 1

The contract scope includes the following measures which will break the receptor pathway for existing ground contamination within the site as well as separating potentially contaminated surface water runoff from clean run off: - Install concrete slab to working area to the rear of the garage - Improve roof rainwater infrastructure to segregate it from surface water run off - Improve capacity and handling measures for ground water run off entering the site from moor land to the rear. - Improve waste water infrastructure and connections to existing foul sewer. - Improve connections to existing oil interceptor

## Key Details

| Field | Value |
| --- | --- |
| Publication source | Public Contracts Scotland |
| Latest notice | https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=APR316137 |
| Notice type | PCS Notice - Website Contract Award Notice |
| Procurement type | Standard |
| Procurement category | Works |
| Procurement method | Open |
| Procurement method details | Open procedure |
| Tender suitability | Not specified |
| Awardee scale | Large |
| All stages | Tender, Award |

## Dates

| Field | Value |
| --- | --- |
| Publication date | 10 Apr 2018 |
| Submission deadline | 24 Jan 2018 |
| Future notice date | Not specified |
| Award date | 12 Mar 2018 |
| Contract period | Not specified |
| Recurrence | Not specified |

## Values

| Field | Value |
| --- | --- |
| Tender value | Not specified |
| Lots value | Not specified |
| Awards value | Not specified |
| Contracts value | £137,921 |

## Status

| Field | Value |
| --- | --- |
| Tender status | Complete |
| Lots status | Complete |
| Awards status | Not specified |
| Contracts status | Active |

## Buyer

| Field | Value |
| --- | --- |
| Main buyer | COMHAIRLE NAN EILEAN SIAR |
| Locality | STORNOWAY |
| Post town | Outer Hebrides |
| Postcode | HS1 2BW |
| Country | Scotland |
| ITL 1 | TLM Scotland |
| ITL 2 | TLM2 Highlands and Islands |
| ITL 3 | TLM20 Highlands and Islands |
| Local authority | Na h-Eileanan Siar |
| Electoral ward | Steòrnabhagh a Deas |
| Westminster constituency | Na h-Eileanan an Iar |
| Delivery location | TLM64 Na h-Eileanan Siar |

## Supplier

| Field | Value |
| --- | --- |
| Number of suppliers | 1 |
| Supplier names | DUNCAN MACKAY & SONS |

## CPV Codes

### Divisions

- 45 - Construction work

### Codes

- 45220000 - Engineering works and construction works

## Release History

- 10 Apr 2018 at 00:00 - Award - PCS Notice - Website Contract Award Notice - https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=APR316137
- 18 Dec 2017 at 00:00 - Tender - PCS Notice - Website Contract Notice - https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=DEC304486

## Documents

- https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=DEC304486
  Marybank Depot Pollution Control - The contract scope includes the following measures which will break the receptor pathway for existing ground contamination within the site as well as separating potentially contaminated surface water run off from clean run off: -Install concrete slab to working area to the rear of the garage -Improve roof rainwater infrastructure to segregate it from surface water run off -Improve capacity and handling measures for ground water run off entering the site from moor land to the rear. -Improve waste water infrastructure and connections to existing foul sewer. -Improve connections to existing oil interceptor.
- https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=APR316137
  Marybank Depot Pollution Control - The contract scope includes the following measures which will break the receptor pathway for existing ground contamination within the site as well as separating potentially contaminated surface water run off from clean run off: -Install concrete slab to working area to the rear of the garage -Improve roof rainwater infrastructure to segregate it from surface water run off -Improve capacity and handling measures for ground water run off entering the site from moor land to the rear. -Improve waste water infrastructure and connections to existing foul sewer. -Improve connections to existing oil interceptor.

## Notice URLs

- http://
- http://www.cne-siar.gov.uk
- http://www.publictendersscotland.publiccontractsscotland.gov.uk
- https://api.publiccontractsscotland.gov.uk/v1/Notice?id=ocds-r6ebe6-0000522708