---
title: "180009 Dallachy Capping Works"
ocid: "ocds-r6ebe6-0000588005"
canonical_url: "https://d3tenders.com/contract/?ocid=ocds-r6ebe6-0000588005"
markdown_url: "https://d3tenders.com/contract/ocds-r6ebe6-0000588005.md"
json_url: "https://d3tenders.com/contract/ocds-r6ebe6-0000588005.json"
source: "Public Contracts Scotland"
current_stage: "Award"
buyer: "MORAY COUNCIL"
published: "2019-07-23"
---

# 180009 Dallachy Capping Works

Buyer: MORAY COUNCIL  
Current stage: Award  
OCID: ocds-r6ebe6-0000588005

[View canonical contract page](https://d3tenders.com/contract/?ocid=ocds-r6ebe6-0000588005)  
[Download OCDS JSON](https://d3tenders.com/contract/ocds-r6ebe6-0000588005.json)

## Summary

Moray Council is seeking bids for the "180009 Dallachy Capping Works" project, aimed at landfill capping and restoration at the Nether Dallachy Landfill site in Moray, UK. The project encompasses approximately 10,000 m2 of permanent capping across various flanks and includes ancillary drainage works. This tender is currently in the active stage, with bids to be submitted electronically by 3rd July 2019. The procurement process follows an open method, and the total contract value is £2,000,000.

This opportunity presents significant potential for businesses specialising in environmental and civil engineering works, particularly those with experience in landfill capping and restoration projects. Companies that are SMEs and have proven capabilities in similar works, alongside adequate insurance provisions, would be well-positioned to compete for this contract. Given the large scope and public interest, this project can drive growth in businesses focused on sustainable waste management solutions.

## Notice

Landfill capping and restoration works are required at Nether Dallachy Landfill site. The area comprises approx 10,000 m2 of permanent capping on the top, north flank and south flank of of phase 7A and ancilliary drainage works. Also included in the workscope is temporary capping of the east slope of Phase 7a and depending on rate of infill, temporary capping to part of the top (with a corresponding reduction in area of permanent capping on the top area). The temporary cap is to be drained by rainflaps, aligned to give a gravity flow away from the adjacent waste to discharge outside of the contained area as clean runoff.

### Lot Information

Lot 1

Landfill capping and restoration works are required at Nether Dallachy Landfill site. The area comprises approx 10,000 m2 of permanent capping on the top, north flank and south flank of of phase 7A and ancilliary drainage works. Also included in the workscope is temporary capping of the east slope of Phase 7a and depending on rate of infill, temporary capping to part of the top (with a corresponding reduction in area of permanent capping on the top area). The temporary cap is to be drained by rainflaps, aligned to give a gravity flow away from the adjacent waste to discharge outside of the contained area as clean runoff.

## Key Details

| Field | Value |
| --- | --- |
| Publication source | Public Contracts Scotland |
| Latest notice | https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=JUL361176 |
| Notice type | PCS Notice - Website Contract Award Notice |
| Procurement type | Standard |
| Procurement category | Works |
| Procurement method | Open |
| Procurement method details | Open procedure |
| Tender suitability | Not specified |
| Awardee scale | SME |
| All stages | Tender, Award |

## Dates

| Field | Value |
| --- | --- |
| Publication date | 23 Jul 2019 |
| Submission deadline | 3 Jul 2019 |
| Future notice date | Not specified |
| Award date | 22 Jul 2019 |
| Contract period | Not specified |
| Recurrence | Not specified |

## Values

| Field | Value |
| --- | --- |
| Tender value | £2,000,000 |
| Lots value | Not specified |
| Awards value | Not specified |
| Contracts value | £169,457 |

## Status

| Field | Value |
| --- | --- |
| Tender status | Complete |
| Lots status | Complete |
| Awards status | Not specified |
| Contracts status | Active |

## Buyer

| Field | Value |
| --- | --- |
| Main buyer | MORAY COUNCIL |
| Locality | ELGIN |
| Post town | Inverness |
| Postcode | IV30 1BX |
| Country | Scotland |
| ITL 1 | TLM Scotland |
| ITL 2 | TLM2 Highlands and Islands |
| ITL 3 | TLM20 Highlands and Islands |
| Local authority | Moray |
| Electoral ward | Elgin City North |
| Westminster constituency | Moray West, Nairn and Strathspey |
| Delivery location | TLM62 Inverness and Nairn, Moray, and Badenoch and Strathspey |

## Supplier

| Field | Value |
| --- | --- |
| Number of suppliers | 1 |
| Supplier names | CMSI |

## CPV Codes

### Divisions

- 45 - Construction work

### Codes

- 45222110 - Waste disposal site construction work

## Release History

- 23 Jul 2019 at 00:00 - Award - PCS Notice - Website Contract Award Notice - https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=JUL361176
- 20 Jun 2019 at 00:00 - Tender - PCS Notice - Website Contract Notice - https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=JUN357793

## Documents

- https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=JUN357793
  180009 Dallachy Capping Works - Landfill capping and restoration works are required at Nether Dallachy Landfill site. The area comprises approx 10,000 m2 of permanent capping on the top, north flank and south flank of of phase 7A and ancilliary drainage works. Also included in the workscope is temporary capping of the east slope of Phase 7a and depending on rate of infill, temporary capping to part of the top (with a corresponding reduction in area of permanent capping on the top area). The temporary cap is to be drained by rainflaps, aligned to give a gravity flow away from the adjacent waste to discharge outside of the contained area as clean runoff.
- https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=JUL361176
  180009 Dallachy Capping Works - Landfill capping and restoration works are required at Nether Dallachy Landfill site. The area comprises approx 10,000 m2 of permanent capping on the top, north flank and south flank of of phase 7A and ancilliary drainage works. Also included in the workscope is temporary capping of the east slope of Phase 7a and depending on rate of infill, temporary capping to part of the top (with a corresponding reduction in area of permanent capping on the top area). The temporary cap is to be drained by rainflaps, aligned to give a gravity flow away from the adjacent waste to discharge outside of the contained area as clean runoff.

## Notice URLs

- http://
- http://www.moray.gov.uk
- https://api.publiccontractsscotland.gov.uk/v1/Notice?id=ocds-r6ebe6-0000588005
- https://www.publictendersscotland.publiccontractsscotland.gov.uk
- https://www.publictendersscotland.publiccontractsscotland.gov.uk/web/login.html

## Provenance

This Markdown file is an alternate public rendering of the D3 Tenders contract record. The canonical page is https://d3tenders.com/contract/?ocid=ocds-r6ebe6-0000588005. The underlying structured data is available as OCDS JSON at https://d3tenders.com/contract/ocds-r6ebe6-0000588005.json.
