title: "RSPB Scotland, Loch Shore Link Path"
ocid: "ocds-r6ebe6-0000596518"
canonical_url: "https://d3tenders.com/contract/?ocid=ocds-r6ebe6-0000596518"
markdown_url: "https://d3tenders.com/contract/ocds-r6ebe6-0000596518.md"
json_url: "https://d3tenders.com/contract/ocds-r6ebe6-0000596518.json"
source: "Public Contracts Scotland"
current_stage: "Award"
buyer: "RSPB SCOTLAND"
published: "2021-09-08"
---

# RSPB Scotland, Loch Shore Link Path

Buyer: RSPB SCOTLAND  
Current stage: Award  
OCID: ocds-r6ebe6-0000596518

[View canonical contract page](https://d3tenders.com/contract/?ocid=ocds-r6ebe6-0000596518)  
[Download OCDS JSON](https://d3tenders.com/contract/ocds-r6ebe6-0000596518.json)

## Summary

The procurement process for the RSPB Scotland, Loch Shore Link Path project has reached the award stage. The buying organisation, RSPB Scotland, located at 2 Lochside View, Edinburgh Park, is overseeing this project that falls within the environmental protection industry category. The total contract value is approximately £244,149.01, with the successful supplier, Mclaren Plant Ltd., having signed the contract on 6 September 2021. This open procedure tender involved construction works focused on developing a new footpath extending 1,318 metres to the shore of Loch Lomond, including associated verges, access arrangements, and boardwalk installations.

This tender presents significant growth opportunities for businesses engaged in environmental construction, particularly those specialising in landscape management and ecological projects. Companies with the capacity to manage protected wildlife concerns, as well as those experienced in footpath and boardwalk construction, will be particularly well-suited to compete. Given the involvement of an established charity as the purchasing body, suppliers can leverage their expertise in socially responsible projects to strengthen their bids and enhance their market presence.

## Notice

The works comprise the construction of a new footpath from the existing footpath adjacent the Wards Farm access road to the shore of Loch Lomond. The footpath is approximately 1318 m long and the works include footpath construction, verge reinstatement, installation of new access arrangements and new boardwalk lengths.

### Lot Information

Lot 1

The works comprise the construction of a new footpath from the existing footpath adjacent the Wards Farm access road to the shore of Loch Lomond. The footpath is approximately 1318 m long and the works include footpath construction, verge reinstatement, installation of new access arrangements and new boardwalk lengths. In addition the Contractor will be required to complete the following: - A Construction Methodology Statement to be prepared and approved (allow 1 week for approval) prior to any construction works on site. - Tree protection measures are required to be in place and approved by the client prior to commencement. - The works are within a RSPB site. The presence of certain protected / important species may require specific mitigation depending on the timing of the works and the feeding patterns of wildfowl and badgers in particular. For feeding geese, the Contractor should allow for up to a minimum of 5 days standing time in the event that works need to be halted. The site will be surveyed 30 minutes prior to construction and if feeding geese found construction works will be cancelled for the day. For badger protection, the Contractor shall be required to attend a site briefing regarding badger protection. The Contractor should note that the following work items will be carried out by the client which may be at the same time of the footpath construction works. These are: - Woodland Management Works (Removal & Planting); In addition to the works noted on the drawings, the Contractor should include for the following items: - Clearance of all trees / redundant fence lines and other obstructions to allow construction of the permanent footpath works. - Reinstatement / grass seeding to all detailed areas. - Works to the value noted in the 'Short Schedule Contingency Allowance'. - Inspection by client archaeologist during topsoil strip operations. In the event that any further investigations are required works shall be halted in that area. Allow for fencing off an area of approximately 10 m x 10 m for up to 2 weeks.

## Key Details

| Field | Value |
| --- | --- |
| Publication source | Public Contracts Scotland |
| Latest notice | https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=SEP426879 |
| Notice type | PCS Notice - Website Contract Award Notice |
| Procurement type | Standard |
| Procurement category | Works |
| Procurement method | Open |
| Procurement method details | Open procedure |
| Tender suitability | Not specified |
| Awardee scale | SME |
| All stages | Tender, Award |

## Dates

| Field | Value |
| --- | --- |
| Publication date | 8 Sep 2021 |
| Submission deadline | 11 Oct 2019 |
| Future notice date | Not specified |
| Award date | 6 Sep 2021 |
| Contract period | 3 Aug 2020 - 31 Dec 2020 |
| Recurrence | Not specified |

## Values

| Field | Value |
| --- | --- |
| Tender value | Not specified |
| Lots value | Not specified |
| Awards value | Not specified |
| Contracts value | £244,149 |

## Status

| Field | Value |
| --- | --- |
| Tender status | Complete |
| Lots status | Complete |
| Awards status | Not specified |
| Contracts status | Active |

## Buyer

| Field | Value |
| --- | --- |
| Main buyer | RSPB SCOTLAND |
| Locality | EDINBURGH |
| Post town | Edinburgh |
| Postcode | EH12 9DH |
| Country | Scotland |
| ITL 1 | TLM Scotland |
| ITL 2 | TLM1 East Central Scotland |
| ITL 3 | TLM13 City of Edinburgh |
| Local authority | City of Edinburgh |
| Electoral ward | Drum Brae/Gyle |
| Westminster constituency | Edinburgh West |
| Delivery location | TLM81 East Dunbartonshire, West Dunbartonshire, and Helensburgh and Lomond |

## Supplier

| Field | Value |
| --- | --- |
| Number of suppliers | 1 |
| Supplier names | MCLAREN PLANT |

## CPV Codes

### Divisions

- 45 - Construction work

### Codes

- 45233161 - Footpath construction work
- 45246510 - Boardwalk construction work

## Release History

- 8 Sep 2021 at 00:00 - Award - PCS Notice - Website Contract Award Notice - https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=SEP426879
- 3 Sep 2019 at 00:00 - Tender - PCS Notice - Website Contract Notice - https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=SEP365058

## Documents

- https://www.publiccontractsscotland.gov.uk/NoticeDownload/DownloadDocument.aspx?id=SEP365058&idx=14
  3rd October 2019 - Principle quantities
- https://www.publiccontractsscotland.gov.uk/NoticeDownload/DownloadDocument.aspx?id=SEP365058&idx=4
  3rd September 2019 - Drawing 40055_101B
- https://www.publiccontractsscotland.gov.uk/NoticeDownload/DownloadDocument.aspx?id=SEP365058&idx=5
  3rd September 2019 - Drawing 40055_107_1A
- https://www.publiccontractsscotland.gov.uk/NoticeDownload/DownloadDocument.aspx?id=SEP365058&idx=6
  3rd September 2019 - Drawing 40055_107_2A
- https://www.publiccontractsscotland.gov.uk/NoticeDownload/DownloadDocument.aspx?id=SEP365058&idx=7
  3rd September 2019 - Drawing 40055_107_3A
- https://www.publiccontractsscotland.gov.uk/NoticeDownload/DownloadDocument.aspx?id=SEP365058&idx=8
  3rd September 2019 - Drawing 40055_107_4A
- https://www.publiccontractsscotland.gov.uk/NoticeDownload/DownloadDocument.aspx?id=SEP365058&idx=9
  3rd September 2019 - Drawing 40055_107_5A
- https://www.publiccontractsscotland.gov.uk/NoticeDownload/DownloadDocument.aspx?id=SEP365058&idx=10
  3rd September 2019 - Drawing 40055_113A
- https://www.publiccontractsscotland.gov.uk/NoticeDownload/DownloadDocument.aspx?id=SEP365058&idx=11
  3rd September 2019 - Drawing 40055_201B
- https://www.publiccontractsscotland.gov.uk/NoticeDownload/DownloadDocument.aspx?id=SEP365058&idx=12
  3rd September 2019 - Drawing 40055_501A
- https://www.publiccontractsscotland.gov.uk/NoticeDownload/DownloadDocument.aspx?id=SEP365058&idx=13
  3rd September 2019 - Drawing 40055_801
- https://www.publiccontractsscotland.gov.uk/NoticeDownload/DownloadDocument.aspx?id=SEP365058&idx=1
  3rd September 2019 - Instructions Form of Tender Contract Data - Part 1 Contract Data - Part 2 Activity Schedule
- https://www.publiccontractsscotland.gov.uk/NoticeDownload/DownloadDocument.aspx?id=SEP365058&idx=2
  3rd September 2019 - Drawing Schedule Works & Site Information Pre-Construction H&S Information Specification
- https://www.publiccontractsscotland.gov.uk/NoticeDownload/DownloadDocument.aspx?id=SEP365058&idx=3
  3rd September 2019 - Drawing 40055_100A
- https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=SEP365058
  RSPB Scotland, Loch Shore Link Path - The works comprise the construction of a new footpath from the existing footpath adjacent the Wards Farm access road to the shore of Loch Lomond. The footpath is approximately 1318 m long and the works include footpath construction, verge reinstatement, installation of new access arrangements and new boardwalk lengths.
- https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=SEP426879
  RSPB Scotland, Loch Shore Link Path - The works comprise the construction of a new footpath from the existing footpath adjacent the Wards Farm access road to the shore of Loch Lomond. The footpath is approximately 1318 m long and the works include footpath construction, verge reinstatement, installation of new access arrangements and new boardwalk lengths.

## Notice URLs

- http://
- http://www.publiccontractsscotland.gov.uk
- http://www.rspb.org.uk
- https://api.publiccontractsscotland.gov.uk/v1/Notice?id=ocds-r6ebe6-0000596518

## Provenance

This Markdown file is an alternate public rendering of the D3 Tenders contract record. The canonical page is https://d3tenders.com/contract/?ocid=ocds-r6ebe6-0000596518. The underlying structured data is available as OCDS JSON at https://d3tenders.com/contract/ocds-r6ebe6-0000596518.json.