title: "Small Works Framework"
ocid: "ocds-r6ebe6-0000655792"
canonical_url: "https://d3tenders.com/contract/?ocid=ocds-r6ebe6-0000655792"
markdown_url: "https://d3tenders.com/contract/ocds-r6ebe6-0000655792.md"
json_url: "https://d3tenders.com/contract/ocds-r6ebe6-0000655792.json"
source: "Public Contracts Scotland"
current_stage: "Award"
buyer: "ARGYLL AND BUTE COUNCIL"
published: "2021-11-18"
---

# Small Works Framework

Buyer: ARGYLL AND BUTE COUNCIL  
Current stage: Award  
OCID: ocds-r6ebe6-0000655792

[View canonical contract page](https://d3tenders.com/contract/?ocid=ocds-r6ebe6-0000655792)  
[Download OCDS JSON](https://d3tenders.com/contract/ocds-r6ebe6-0000655792.json)

## Summary

Argyll and Bute Council is currently running a procurement process titled "Small Works Framework," primarily for the delivery of civil works and general services in the region of Mid-Argyll. This open procedure aims to support the operations of the Roads and Bridge squads and is structured to allow flexibility in utilising external contractors. The procurement stage is currently active, with the tender period closing on 30th June 2021. Interested suppliers can respond electronically, enhancing accessibility. The relevant items under this framework cover various sub-lots including general civils works, machine surfacing, vehicle safety fencing, and more, extending from July 2021 to July 2024 with an optional one-year extension based on performance.

This tender represents a significant opportunity for businesses, particularly those specialising in civil engineering, roadworks, and public infrastructure maintenance. Small and medium-sized enterprises (SMEs) focusing on these sectors would particularly benefit from engaging in this framework. With a flexible approach to supply, contractors can expect a combination of periodic work, providing them with the chance to establish ongoing relationships with a key governmental authority. Additionally, potential bidders are encouraged to incorporate community benefit clauses into their proposals, fostering local employment and contribution to the region.

## Notice

Argyll and Bute Council require external contracts to support operations of Roads and Bridge squads. This is to supplement internal resource on an if and when required basis.

### Lot Information

Area I Mid-Argyll: Sub-lot 1 Machine Surfacing

The framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lots within Area I Mid-Argyll: 1 - Machine Surfacing

Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).

Area I Mid-Argyll: Sub-lot 3 General Civils Works

The framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lots within Area I Mid-Argyll, sub-lot 3 - General Civils Works

Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).

Area I Mid-Argyll: Sub-lot 2 Carriageway & Footway Patching

The framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lots within Area I Mid-Argyll, sub-lot 2 - Carriageway & Footway Patching.

Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).

Area I Mid-Argyll: Sub-lot 4 Kerbing & Paving

The framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lots within Area I Mid-Argyll, sub-lot 4 - Kerbing & Paving

Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).

Area I Mid-Argyll: Sub-lot 5 Vehicle Safety Fencing & Fencing

The framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lots within Area I Mid-Argyll, sub-lot 5 - Vehicle Safety Fencing & Fencing

Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).

Area I Mid-Argyll: Sub-lot 6 Lighting Cable & Ducting

The framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lots within Area I Mid-Argyll, sub-lot 6 - Lighting Cable & Ducting.

Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).

Area I Mid-Argyll: Sub-lot 7 General Building

The framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lots within Area I Mid-Argyll, sub-lot 7 - General Building

Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).

Area II - Islay: Sub-lot 3 General Civils Works

The framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area II Islay, sub-lot 3 - General Civils Works

Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).

Area II - Islay: Sub-lot 1 Machine Surfacing

The framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lots within Area II - Islay: 1 - Machine Surfacing

Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).

Area II - Islay: Sub-lot 4 Kerbing & Paving

The framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area II Islay, sub-lot 4 - Kerbing & Paving

Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).

Area II - Islay: Sub-lot 5 Vehicle Safety Fencing & Fencing

The framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area II Islay, sub-lot 5 - Vehicle Safety Fencing & Fencing

Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).

Area II - Islay: Sub-lot 6 Lighting Cable & Ducting

The framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area II Islay, sub-lot 6 - Lighting Cable & Ducting

Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).

Area II - Islay: Sub-lot 7 General Building

The framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area II Islay, sub-lot 7 - General Building

Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).

Area III - Kintyre: Sub-lot 1 Machine Surfacing

The framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lots within Area III - Kintyre, sub-lot 1 - Machine Surfacing

Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).

Area III - Kintyre: Sub-lot 2 Carriageway & Footway Patching

The framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area III - Kintyre, sub-lot 2 - Carriageway & Footway Patching

Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).

Area III - Kintyre: Sub-lot 3 General Civils Works

The framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area III - Kintyre, sub-lot 3 - General Civils Works

Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).

Area III - Kintyre: Sub-lot 4 Kerbing & Paving

The framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area III - Kintyre, sub-lot 4 - Kerbing & Paving

Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).

Area III - Kintyre: Sub-lot 5 Vehicle Safety Fencing & Fencing

The framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area III - Kintyre, sub-lot 5 - Vehicle Safety Fencing & Fencing

Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).

Area III - Kintyre: Sub-lot 6 Lighting Cable & Ducting

The framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area III - Kintyre, sub-lot 6 - Lighting Cable & Ducting

Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).

Area III - Kintyre: Sub-lot 7 General Building

The framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area III - Kintyre, sub-lot 7 - General Building

Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).

Area IV - Lorn: Sub-lot 1 Machine Surfacing

The framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lots within Area IV- Lorn, sub-lot 1 - Machine Surfacing

Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).

Area IV - Lorn: Sub-lot 2 Carriageway & Footway Patching

The framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area IV- Lorn, sub-lot 2 - Carriageway & Footway Patching

Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).

Area IV - Lorn: Sub-lot 3 General Civils Works

The framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area IV- Lorn, sub-lot 3 - General Civils Works

Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).

Area IV - Lorn: Sub-lot 4 Kerbing & Paving

The framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area IV- Lorn, sub-lot 4 - Kerbing & Paving

Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).

Area IV - Lorn: Sub-lot 5 Vehicle Safety Fencing & Fencing

The framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area IV- Lorn, sub-lot 5 - Vehicle Safety Fencing & Fencing

Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).

Area IV - Lorn: Sub-lot 6 Lighting Cable & Ducting

The framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area IV- Lorn, sub-lot 6 - Lighting Cable & Ducting

Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).

Area IV - Lorn: Sub-lot 7 General Building

The framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area IV- Lorn, sub-lot 7 - General Building

Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).

Area V - Mull - Sub-lot 1 Machine Surfacing

The framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lots within Area V - Mull: 1 - Machine Surfacing

Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).

Area V - Mull - Sub-lot 2 Carriageway & Footway Patching

The framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area V - Mull, sub-lot 2 - Carriageway & Footway Patching

Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).

Area V - Mull - Sub-lot 3 General Civils Works

The framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area V - Mull, sub-lot 3 - General Civils Works

Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).

Area V - Mull - Sub-lot 4 Kerbing & Paving

The framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area V - Mull, sub-lot 4 - Kerbing & Paving

Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).

Area V - Mull - Sub-lot 5 Vehicle Safety Fencing & Fencing

The framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area V - Mull, sub-lot 5 - Vehicle Safety Fencing & Fencing

Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).

Area V - Mull - Sub-lot 6 Lighting Cable & Ducting

The framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area V - Mull, sub-lot 6 - Lighting Cable & Ducting

Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).

Area V - Mull - Sub-lot 7 General Building

The framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area V - Mull, sub-lot 7 - General Building

Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).

Area VI - Cowal: Sub-lot 1 Machine Surfacing

The framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lots within Area VI - Cowal, sub-lot 1 - Machine Surfacing

Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).

Area VI - Cowal: Sub-lot 2 Carriageway & Footway Patching

The framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area VI - Cowal, sub-lot2 - Carriageway & Footway Patching

Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).

Area VI - Cowal: Sub-lot 3 General Civils Works

The framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area VI - Cowal, sub-lot 3 - General Civils Works

Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).

Area VI - Cowal: Sub-lot 4 Kerbing & Paving

The framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area VI - Cowal, sub-lot 4 - Kerbing & Paving

Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).

Area VI - Cowal: Sub-lot 5 Vehicle Safety Fencing & Fencing

The framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area VI - Cowal, sub-lot 5 - Vehicle Safety Fencing & Fencing

Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).

Area VI - Cowal: Sub-lot 6 Lighting Cable & Ducting

The framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area VI - Cowal, sub-lot 6 - Lighting Cable & Ducting

Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).

Area VI - Cowal: Sub-lot 7 General Building

The framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area VI - Cowal, sub-lot 7 - General Building

Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).

Area VII - Bute: Sub-lot 1 Machine Surfacing

The framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lots within Area VII - Bute, sub-lot 1 - Machine Surfacing

Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).

Area VII - Bute: Sub-lot 2 Carriageway & Footway Patching

The framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area VII - Bute, sub-lot 2 - Carriageway & Footway Patching

Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).

Area VII - Bute: Sub-lot 3 General Civils Works

The framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area VII - Bute, sub-lot 3 - General Civils Works

Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).

Area VII - Bute: Sub-lot 4 Kerbing & Paving

The framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area VII - Bute, sub-lot 4 - Kerbing & Paving

Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).

Area VII - Bute: Sub-lot 5 Vehicle Safety Fencing & Fencing

The framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area VII - Bute, sub-lot 5 - Vehicle Safety Fencing & Fencing

Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).

Area VII - Bute: Sub-lot 6 Lighting Cable & Ducting

The framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area VII - Bute, sub-lot 6 - Lighting Cable & Ducting

Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).

Area VII - Bute: Sub-lot 7 General Building

The framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area VII - Bute, sub-lot 7 - General Building

Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).

Area VIII - Lomond : Sub-lot 5 Vehicle Safety Fencing & Fencing

The framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area VIII - Lomond, sub-lot 5 - Vehicle Safety Fencing & Fencing

Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).

Area VIII - Lomond : Sub-lot 6 Lighting Cable & Ducting

The framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area VIII - Lomond, sub-lot 6 - Lighting Cable & Ducting

Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).

Area VIII - Lomond : Sub-lot 7 General Building

The framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area VIII - Lomond, sub-lot 7 - General Building

Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).

Area VIII - Lomond : Sub-lot 1 Machine Surfacing

The framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lots within Area VIII - Lomond, sub-lot 1 - Machine Surfacing

Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).

Area VIII - Lomond : Sub-lot 2 Carriageway & Footway Patching

The framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area VIII - Lomond, sub-lot 2 - Carriageway & Footway Patching

Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).

Area VIII - Lomond : Sub-lot 3 General Civils Works

The framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area VIII - Lomond, sub-lot 3 - General Civils Works

Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).

Area VIII - Lomond : Sub-lot 4 Kerbing & Paving

The framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area VIII - Lomond, sub-lot 4 - Kerbing & Paving

Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).

## Key Details

| Field | Value |
| --- | --- |
| Publication source | Public Contracts Scotland |
| Latest notice | https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=NOV433443 |
| Notice type | PCS Notice - Website Contract Award Notice |
| Procurement type | Framework |
| Procurement category | Works |
| Procurement method | Open |
| Procurement method details | Open procedure |
| Tender suitability | Not specified |
| Awardee scale | SME |
| All stages | Tender, Award |

## Dates

| Field | Value |
| --- | --- |
| Publication date | 18 Nov 2021 |
| Submission deadline | 30 Jun 2021 |
| Future notice date | Not specified |
| Award date | 11 Oct 2021 |
| Contract period | 23 Jul 2021 - 24 Jul 2024 |
| Recurrence | In line with the end date of this framework |

## Values

| Field | Value |
| --- | --- |
| Tender value | Not specified |
| Lots value | Not specified |
| Awards value | Not specified |
| Contracts value | Not specified |

## Status

| Field | Value |
| --- | --- |
| Tender status | Complete |
| Lots status | Active, Complete |
| Awards status | Not specified |
| Contracts status | Active |

## Buyer

| Field | Value |
| --- | --- |
| Main buyer | ARGYLL AND BUTE COUNCIL |
| Locality | LOCHGILPHEAD |
| Post town | Paisley |
| Postcode | PA31 8RT |
| Country | Scotland |
| ITL 1 | TLM Scotland |
| ITL 2 | TLM2 Highlands and Islands |
| ITL 3 | TLM20 Highlands and Islands |
| Local authority | Argyll and Bute |
| Electoral ward | Mid Argyll |
| Westminster constituency | Argyll, Bute and South Lochaber |
| Delivery location | TLM63 Lochaber, Skye and Lochalsh, Arran and Cumbrae, and Argyll and Bute |

## Supplier

| Field | Value |
| --- | --- |
| Number of suppliers | 18 |
| Supplier names | D A MACDONALD (CONTRACTORS; DONALD MCLEAN CONTRACTORS; FION CONSTRUCTION; GEO-STRUCTURAL; GEORGE MCNAUGHTON & SON (PLANT HIRE; GH GROUNDWORKS; HIGHLAND FENCING & BARRIER CONTRACTORS; HILLHOUSE QUARRY GROUP LTD T/A MACASPHALT; IAIN MACPHERSON & SON; JOHN MCGEADY; JURA PLANT HIRE; MACDOUGALL CONTRACTORS; MCEACHERN BROS.; MCFADYENS CONTRACTORS (CAMPBELTOWN; MCLAREN PLANT & CONTRACTING; ROSS MACARTHUR CONTRACTORS; SIMPSON FENCING AND SAFETY FENCING CONTRACTOR; W&M CURRIE&SON |

## CPV Codes

### Divisions

- 45 - Construction work

### Codes

- 45233120 - Road construction works

## Release History

- 18 Nov 2021 at 00:00 - Award - PCS Notice - Website Contract Award Notice - https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=NOV433443
- 2 Jun 2021 at 00:00 - Tender - PCS Notice - Website Contract Notice - https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=JUN416965

## Documents

- https://www.publiccontractsscotland.gov.uk/NoticeDownload/DownloadDocument.aspx?id=JUN416965&idx=3
  25th June 2021 - Community Benefits Clauses Guidance for Tenderers
- https://www.publiccontractsscotland.gov.uk/NoticeDownload/DownloadDocument.aspx?id=JUN416965&idx=1
  2nd June 2021 - Small Works Framework Invitation to Tender
- https://www.publiccontractsscotland.gov.uk/NoticeDownload/DownloadDocument.aspx?id=JUN416965&idx=2
  2nd June 2021 - Pricing Schedules
- https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=JUN416965
  Small Works Framework - Argyll and Bute Council require external contracts to support operations of Roads and Bridge squads. This is to supplement internal resource on an if and when required basis.
- https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=NOV433443
  Small Works Framework - Argyll and Bute Council require external contracts to support operations of Roads and Bridge squads. This is to supplement internal resource on an if and when required basis.

## Notice URLs

- http://
- http://www.argyll-bute.gov.uk
- http://www.publiccontractscotland.gov.uk
- https://api.publiccontractsscotland.gov.uk/v1/Notice?id=ocds-r6ebe6-0000655792