---
title: "Tobermory Railings and Wall Works Phase 2"
ocid: "ocds-r6ebe6-0000717725"
canonical_url: "https://d3tenders.com/contract/?ocid=ocds-r6ebe6-0000717725"
markdown_url: "https://d3tenders.com/contract/ocds-r6ebe6-0000717725.md"
json_url: "https://d3tenders.com/contract/ocds-r6ebe6-0000717725.json"
source: "Public Contracts Scotland"
current_stage: "Award"
buyer: "ARGYLL AND BUTE COUNCIL"
published: "2023-03-09"
---

# Tobermory Railings and Wall Works Phase 2

Buyer: ARGYLL AND BUTE COUNCIL  
Current stage: Award  
OCID: ocds-r6ebe6-0000717725

[View canonical contract page](https://d3tenders.com/contract/?ocid=ocds-r6ebe6-0000717725)  
[Download OCDS JSON](https://d3tenders.com/contract/ocds-r6ebe6-0000717725.json)

## Summary

The Argyll and Bute Council has awarded a contract for the "Tobermory Railings and Wall Works Phase 2" project. The council is located in Lochgilphead, UK, and the project falls under the works category. The procurement stage was completed on 9th March 2023. The total contract value is £398,255.1 GBP.

This tender for the "Tobermory Railings and Wall Works Phase 2" project by the Argyll and Bute Council offers opportunities for businesses in the construction and infrastructure sector. Businesses well-suited to compete would include small and medium enterprises with expertise in civil engineering and construction. The procurement method was an open procedure, allowing fair competition among interested bidders.

## Notice

Phase 2 of the works is being undertaken to complete the seawall height extension and post and rail replacement to the length of seawall from the slipway next to Tobermory river, up to and including Fisherman's Pier - Approximately 200m length total. The inclusion of proposed Contractor designed removable flood barrier at Fisherman's Pier and a hinged flood gate at the narrow shore access (next to the ice cream shop) with valved drainage along the full length will complete the enhanced flood protection of the existing seawall.

### Lot Information

Lot 1

Phase 2 of the works is being undertaken to complete the seawall height extension and post and rail replacement to the length of seawall from the slipway next to Tobermory river, up to and including Fisherman's Pier - Approximately 200m length total. The inclusion of proposed Contractor designed removable flood barrier at Fisherman's Pier and a hinged flood gate at the narrow shore access (next to the ice cream shop) with valved drainage along the full length will complete the enhanced flood protection of the existing seawall.

## Key Details

| Field | Value |
| --- | --- |
| Publication source | Public Contracts Scotland |
| Latest notice | https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=MAR473242 |
| Notice type | PCS Notice - Website Contract Award Notice |
| Procurement type | Standard |
| Procurement category | Works |
| Procurement method | Open |
| Procurement method details | Open procedure |
| Tender suitability | Not specified |
| Awardee scale | SME |
| All stages | Tender, Award |

## Dates

| Field | Value |
| --- | --- |
| Publication date | 9 Mar 2023 |
| Submission deadline | 6 Feb 2023 |
| Future notice date | Not specified |
| Award date | 7 Mar 2023 |
| Contract period | Not specified |
| Recurrence | Not specified |

## Values

| Field | Value |
| --- | --- |
| Tender value | Not specified |
| Lots value | Not specified |
| Awards value | Not specified |
| Contracts value | £398,255 |

## Status

| Field | Value |
| --- | --- |
| Tender status | Complete |
| Lots status | Complete |
| Awards status | Not specified |
| Contracts status | Active |

## Buyer

| Field | Value |
| --- | --- |
| Main buyer | ARGYLL AND BUTE COUNCIL |
| Locality | LOCHGILPHEAD |
| Post town | Paisley |
| Postcode | PA31 8RT |
| Country | Scotland |
| ITL 1 | TLM Scotland |
| ITL 2 | TLM2 Highlands and Islands |
| ITL 3 | TLM20 Highlands and Islands |
| Local authority | Argyll and Bute |
| Electoral ward | Mid Argyll |
| Westminster constituency | Argyll, Bute and South Lochaber |
| Delivery location | TLM63 Lochaber, Skye and Lochalsh, Arran and Cumbrae, and Argyll and Bute |

## Supplier

| Field | Value |
| --- | --- |
| Number of suppliers | 1 |
| Supplier names | TSL CONTRACTORS |

## CPV Codes

### Divisions

- 45 - Construction work

### Codes

- 45200000 - Works for complete or part construction and civil engineering work
- 45243300 - Sea wall construction work
- 45341000 - Erection of railings

## Release History

- 9 Mar 2023 at 00:00 - Award - PCS Notice - Website Contract Award Notice - https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=MAR473242
- 21 Dec 2022 at 00:00 - Tender - PCS Notice - Website Contract Notice - https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=DEC467538

## Documents

- https://www.publiccontractsscotland.gov.uk/NoticeDownload/DownloadDocument.aspx?id=DEC467538&idx=4
  21st December 2022 - Site Info
- https://www.publiccontractsscotland.gov.uk/NoticeDownload/DownloadDocument.aspx?id=DEC467538&idx=5
  21st December 2022 - Works Info
- https://www.publiccontractsscotland.gov.uk/NoticeDownload/DownloadDocument.aspx?id=DEC467538&idx=1
  21st December 2022 - BoQ
- https://www.publiccontractsscotland.gov.uk/NoticeDownload/DownloadDocument.aspx?id=DEC467538&idx=2
  21st December 2022 - Contract Data & Z clauses
- https://www.publiccontractsscotland.gov.uk/NoticeDownload/DownloadDocument.aspx?id=DEC467538&idx=3
  21st December 2022 - ITT
- https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=DEC467538
  Tobermory Railings and Wall Works Phase 2 - Phase 2 of the works is being undertaken to complete the seawall height extension and post and rail replacement to the length of seawall from the slipway next to Tobermory river, up to and including Fisherman's Pier - Approximately 200m length total. The inclusion of proposed Contractor designed removable flood barrier at Fisherman's Pier and a hinged flood gate at the narrow shore access (next to the ice cream shop) with valved drainage along the full length will complete the enhanced flood protection of the existing seawall.
- https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=MAR473242
  Tobermory Railings and Wall Works Phase 2 - Phase 2 of the works is being undertaken to complete the seawall height extension and post and rail replacement to the length of seawall from the slipway next to Tobermory river, up to and including Fisherman's Pier - Approximately 200m length total. The inclusion of proposed Contractor designed removable flood barrier at Fisherman's Pier and a hinged flood gate at the narrow shore access (next to the ice cream shop) with valved drainage along the full length will complete the enhanced flood protection of the existing seawall.

## Notice URLs

- http://
- http://www.argyll-bute.gov.uk
- http://www.publiccontractsscotland.gov.uk
- https://api.publiccontractsscotland.gov.uk/v1/Notice?id=ocds-r6ebe6-0000717725

## Provenance

This Markdown file is an alternate public rendering of the D3 Tenders contract record. The canonical page is https://d3tenders.com/contract/?ocid=ocds-r6ebe6-0000717725. The underlying structured data is available as OCDS JSON at https://d3tenders.com/contract/ocds-r6ebe6-0000717725.json.
