---
title: "2675a - Design and Build of a Solvent Storage Area"
ocid: "ocds-r6ebe6-0000733257"
canonical_url: "https://d3tenders.com/contract/?ocid=ocds-r6ebe6-0000733257"
markdown_url: "https://d3tenders.com/contract/ocds-r6ebe6-0000733257.md"
json_url: "https://d3tenders.com/contract/ocds-r6ebe6-0000733257.json"
source: "Public Contracts Scotland"
current_stage: "Award"
buyer: "CENTRE FOR PROCESS INNOVATION LIMITED"
published: "2023-11-29"
---

# 2675a - Design and Build of a Solvent Storage Area

Buyer: CENTRE FOR PROCESS INNOVATION LIMITED  
Current stage: Award  
OCID: ocds-r6ebe6-0000733257

[View canonical contract page](https://d3tenders.com/contract/?ocid=ocds-r6ebe6-0000733257)  
[Download OCDS JSON](https://d3tenders.com/contract/ocds-r6ebe6-0000733257.json)

## Summary

The Centre for Process Innovation Limited, based in Redcar, UK, has awarded a contract for the design and build of a solvent storage area to Tilbury Douglas Construction Ltd. This tender, titled "Design and Build of a Solvent Storage Area," falls under the works category and was awarded with a value of £2,000,000. The procurement stage is complete, with the contract signed on 11th September 2023. The tender process was of an open procedure type, and the main procurement category was works.

This tender offers business growth opportunities for companies specializing in construction and design services. Businesses capable of integrating new process equipment, carrying out Principal Contractor and Principal Designer duties, and working on facility modifications, utility line extensions, and emergency vent installations would be well-suited to compete. The Centre for Process Innovation Limited, as the buying organisation, aims to create a solvent storage area to facilitate the Grand Challenge 3 manufacturing process.

## Notice

The Grand Challenge 3 manufacturing process will require a number of facility modifications to enable storage and transfer of solvent in and out of cleanroom 4 from the yard; extend utility lines to clean room 4; install process and emergency vent for the process from clean room 4 and link signals from new equipment into the BMS and EMS. The specific process equipment required for the Grand Challenge 3 will be procured by CPI as will 3 extract booths to house the process equipment. This tender is for the integration work surrounding the new process equipment and flow booths and for the appointed party to carry out the Principal Contractor and Principal Designer duties for this project. The work has been divided into 6 sections and it is expected that the principal contractor, or appointed sub-contractor(s) will deliver all of these sections. Please download the tender pack from https://www.publiccontractsscotland.gov.uk/Default.aspx for more information. Please note, as per the invitation to tender document, our estimated budget for this scope of work is 750,000.00 GBP, however, the total framework spend for this tender will be 2,000,000 GBP to cover any future requirements (if necessary) falling within the scope of the tender.

### Lot Information

Lot 1

The Grand Challenge 3 manufacturing process will require a number of facility modifications to enable storage and transfer of solvent in and out of cleanroom 4 from the yard; extend utility lines to clean room 4; install process and emergency vent for the process from clean room 4 and link signals from new equipment into the BMS and EMS. The specific process equipment required for the Grand Challenge 3 will be procured by CPI as will 3 extract booths to house the process equipment. This tender is for the integration work surrounding the new process equipment and flow booths and for the appointed party to carry out the Principal Contractor and Principal Designer duties for this project. The work has been divided into 6 sections and it is expected that the principal contractor, or appointed sub-contractor(s) will deliver all of these sections. Please download the tender pack from https://www.publiccontractsscotland.gov.uk/Default.aspx for more information. Please note, as per the invitation to tender document, our estimated budget for this scope of work is 750,000.00 GBP, however, the total framework spend for this tender will be 2,000,000 GBP to cover any future requirements (if necessary) falling within the scope of the tender.

## Key Details

| Field | Value |
| --- | --- |
| Publication source | Public Contracts Scotland |
| Latest notice | https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=NOV493754 |
| Notice type | PCS Notice - Website Contract Award Notice |
| Procurement type | Framework |
| Procurement category | Works |
| Procurement method | Open |
| Procurement method details | Open procedure |
| Tender suitability | Not specified |
| Awardee scale | Large |
| All stages | Tender, Award |

## Dates

| Field | Value |
| --- | --- |
| Publication date | 29 Nov 2023 |
| Submission deadline | 9 Jun 2023 |
| Future notice date | Not specified |
| Award date | 11 Sep 2023 |
| Contract period | Not specified |
| Recurrence | Not specified |

## Values

| Field | Value |
| --- | --- |
| Tender value | £2,000,000 |
| Lots value | Not specified |
| Awards value | Not specified |
| Contracts value | £2,000,000 |

## Status

| Field | Value |
| --- | --- |
| Tender status | Complete |
| Lots status | Complete |
| Awards status | Not specified |
| Contracts status | Active |

## Buyer

| Field | Value |
| --- | --- |
| Main buyer | CENTRE FOR PROCESS INNOVATION LIMITED |
| Locality | REDCAR |
| Post town | Cleveland |
| Postcode | TS10 4RF |
| Country | England |
| ITL 1 | TLC North East (England) |
| ITL 2 | TLC3 Tees Valley |
| ITL 3 | TLC32 South Teesside |
| Local authority | Redcar and Cleveland |
| Electoral ward | Dormanstown |
| Westminster constituency | Redcar |
| Delivery location | Not specified |

## Supplier

| Field | Value |
| --- | --- |
| Number of suppliers | 1 |
| Supplier names | TILBURY DOUGLAS CONSTRUCTION |

## CPV Codes

### Divisions

- 45 - Construction work

### Codes

- 45000000 - Construction work

## Release History

- 29 Nov 2023 at 00:00 - Award - PCS Notice - Website Contract Award Notice - https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=NOV493754
- 25 May 2023 at 00:00 - Tender - PCS Notice - Website Contract Notice - https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=MAY479339

## Documents

- https://www.publiccontractsscotland.gov.uk/NoticeDownload/DownloadDocument.aspx?id=MAY479339&idx=1
  25th May 2023 - 2675a Tender Pack
- https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=MAY479339
  2675a - Design and Build of a Solvent Storage Area - The Grand Challenge 3 manufacturing process will require a number of facility modifications to enable storage and transfer of solvent in and out of cleanroom 4 from the yard; extend utility lines to clean room 4; install process and emergency vent for the process from clean room 4 and link signals from new equipment into the BMS and EMS. The specific process equipment required for the Grand Challenge 3 will be procured by CPI as will 3 extract booths to house the process equipment. This tender is for the integration work surrounding the new process equipment and flow booths and for the appointed party to carry out the Principal Contractor and Principal Designer duties for this project. The work has been divided into 6 sections and it is expected that the principal contractor, or appointed sub-contractor(s) will deliver all of these sections. Please download the tender pack from https://www.publiccontractsscotland.gov.uk/Default.aspx for more information. Please note, as per the invitation to tender document, our estimated budget for this scope of work is 750,000.00 GBP, however, the total framework spend for this tender will be 2,000,000 GBP to cover any future requirements (if necessary) falling within the scope of the tender.
- https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=NOV493754
  2675a - Design and Build of a Solvent Storage Area - The Grand Challenge 3 manufacturing process will require a number of facility modifications to enable storage and transfer of solvent in and out of cleanroom 4 from the yard; extend utility lines to clean room 4; install process and emergency vent for the process from clean room 4 and link signals from new equipment into the BMS and EMS. The specific process equipment required for the Grand Challenge 3 will be procured by CPI as will 3 extract booths to house the process equipment. This tender is for the integration work surrounding the new process equipment and flow booths and for the appointed party to carry out the Principal Contractor and Principal Designer duties for this project. The work has been divided into 6 sections and it is expected that the principal contractor, or appointed sub-contractor(s) will deliver all of these sections. Please download the tender pack from https://www.publiccontractsscotland.gov.uk/Default.aspx for more information. Please note, as per the invitation to tender document, our estimated budget for this scope of work is 750,000.00 GBP, however, the total framework spend for this tender will be 2,000,000 GBP to cover any future requirements (if necessary) falling within the scope of the tender.

## Notice URLs

- http://
- http://www.uk-cpi.com
- https://api.publiccontractsscotland.gov.uk/v1/Notice?id=ocds-r6ebe6-0000733257
- https://www.publiccontractsscotland.gov.uk/Default.aspx

## Provenance

This Markdown file is an alternate public rendering of the D3 Tenders contract record. The canonical page is https://d3tenders.com/contract/?ocid=ocds-r6ebe6-0000733257. The underlying structured data is available as OCDS JSON at https://d3tenders.com/contract/ocds-r6ebe6-0000733257.json.
