# MC14 - Crookfur Road Completion of Footway Widening

Buyer: EAST RENFREWSHIRE COUNCIL  
Current stage: Award  
OCID: ocds-r6ebe6-0000768684

[View canonical contract page](https://d3tenders.com/contract/?ocid=ocds-r6ebe6-0000768684)  
[Download OCDS JSON](https://d3tenders.com/contract/ocds-r6ebe6-0000768684.json)

## Summary

The East Renfrewshire Council has awarded a contract to John McGeady Ltd for the project titled "MC14 - Crookfur Road Completion of Footway Widening". This contract falls under the main procurement category of works and is part of the procurement process initiated as a tender. The project involves completing earlier works started in 2023 and includes footway widening, junction treatments, and construction of zebra style crossings. The contract value is £50,500.20 GBP, with a signing date of 20th May 2024.

This public procurement opportunity by East Renfrewshire Council presents potential business growth prospects for contractors specialising in construction and infrastructure development. Businesses with expertise in roadworks, civil engineering, and landscaping are well-positioned to compete for this contract. The project is scheduled to be executed during the summer holidays in 2024 and requires close attention to details such as traffic management and construction coordination to ensure successful project delivery.

## Notice

These works are for the completion of an earlier Phase of works carried out in November & December 2023. The earlier works were terminated (through no fault of the contractor) due to persistent traffic conflict between construction and school operations. Works in close proximity to the signalised junction at Harvie Avenue led to queuing levels deemed unacceptable by road users, local residents and councillors. As a result, this Contract is programmed to be carried during the school summer holidays, 27th June to 13th August, 2024. The works closest to Harvie Avenue must be carried out at weekends. Works include junction treatment at both legs of Crookfur Drive to reduce radii and create a build-out/ stop end. Associated with this will be relocation of gullys to new kerbline. In some areas, the footways will be scarified to the depth of the bituminous layers and re-constructed in 30mm hot rolled asphalt, on 50mm asphalt concrete on a regulating layer of Type 1. A new zebra style crossings will be constructed on Crookfur Drive. Also included is reinstatement / upgrading of grassed verges adjacent to footways widened in the earlier contract.

### Lot Information

Lot 1

These works are for the completion of an earlier Phase of works carried out in November & December 2023. The earlier works were terminated (through no fault of the contractor) due to persistent traffic conflict between construction and school operations. Works in close proximity to the signalised junction at Harvie Avenue led to queuing levels deemed unacceptable by road users, local residents and councillors. As a result, this Contract is programmed to be carried during the school summer holidays, 27th June to 13th August, 2024. The works closest to Harvie Avenue must be carried out at weekends. Works include junction treatment at both legs of Crookfur Drive to reduce radii and create a build-out/ stop end. Associated with this will be relocation of gullys to new kerbline. In some areas, the footways will be scarified to the depth of the bituminous layers and re-constructed in 30mm hot rolled asphalt, on 50mm asphalt concrete on a regulating layer of Type 1. A new zebra style crossings will be constructed on Crookfur Drive. Also included is reinstatement / upgrading of grassed verges adjacent to footways widened in the earlier contract.. This is a contract award notice under a call-off from Footways & Cycle Paths Framework Agreement - ERC000041.

## Key Details

| Field | Value |
| --- | --- |
| Publication source | Public Contracts Scotland |
| Latest notice | https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=JUN506852 |
| Notice type | PCS Notice - Website Contract Award Notice |
| Procurement type | Standard |
| Procurement category | Works |
| Procurement method | Open |
| Procurement method details | Open procedure |
| Tender suitability | Not specified |
| Awardee scale | SME |
| All stages | Award |

## Dates

| Field | Value |
| --- | --- |
| Publication date | 6 Jun 2024 |
| Submission deadline | Not specified |
| Future notice date | Not specified |
| Award date | 20 May 2024 |
| Contract period | Not specified |
| Recurrence | Not specified |

## Values

| Field | Value |
| --- | --- |
| Tender value | Not specified |
| Lots value | Not specified |
| Awards value | Not specified |
| Contracts value | £50,500 |

## Status

| Field | Value |
| --- | --- |
| Tender status | Complete |
| Lots status | Complete |
| Awards status | Not specified |
| Contracts status | Active |

## Buyer

| Field | Value |
| --- | --- |
| Main buyer | EAST RENFREWSHIRE COUNCIL |
| Locality | GIFFNOCK |
| Post town | Glasgow |
| Postcode | G46 6UG |
| Country | Scotland |
| ITL 1 | TLM Scotland |
| ITL 2 | TLM3 West Central Scotland |
| ITL 3 | TLM33 Inverclyde, East Renfrewshire, and Renfrewshire |
| Local authority | East Renfrewshire |
| Electoral ward | Giffnock and Thornliebank |
| Westminster constituency | East Renfrewshire |
| Delivery location | TLM83 Inverclyde, East Renfrewshire, and Renfrewshire |

## Supplier

| Field | Value |
| --- | --- |
| Number of suppliers | 1 |
| Supplier names | JOHN MCGEADY |

## CPV Codes

### Divisions

- 45 - Construction work

### Codes

- 45233120 - Road construction works

## Release History

- 6 Jun 2024 at 00:00 - Award - PCS Notice - Website Contract Award Notice - https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=JUN506852

## Documents

- https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=JUN506852
  MC14 - Crookfur Road Completion of Footway Widening - These works are for the completion of an earlier Phase of works carried out in November & December 2023. The earlier works were terminated (through no fault of the contractor) due to persistent traffic conflict between construction and school operations. Works in close proximity to the signalised junction at Harvie Avenue led to queuing levels deemed unacceptable by road users, local residents and councillors. As a result, this Contract is programmed to be carried during the school summer holidays, 27th June to 13th August, 2024. The works closest to Harvie Avenue must be carried out at weekends. Works include junction treatment at both legs of Crookfur Drive to reduce radii and create a build-out/ stop end. Associated with this will be relocation of gullys to new kerbline. In some areas, the footways will be scarified to the depth of the bituminous layers and re-constructed in 30mm hot rolled asphalt, on 50mm asphalt concrete on a regulating layer of Type 1. A new zebra style crossings will be constructed on Crookfur Drive. Also included is reinstatement / upgrading of grassed verges adjacent to footways widened in the earlier contract.

## Notice URLs

- http://
- http://www.eastrenfrewshire.gov.uk
- https://api.publiccontractsscotland.gov.uk/v1/Notice?id=ocds-r6ebe6-0000768684

## Provenance

This Markdown file is an alternate public rendering of the D3 Tenders contract record. The canonical page is https://d3tenders.com/contract/?ocid=ocds-r6ebe6-0000768684. The underlying structured data is available as OCDS JSON at https://d3tenders.com/contract/ocds-r6ebe6-0000768684.json.