Notice Information
Notice Title
T0483 AD10 M60 Barton High Level Bridge Steady State Assessment and Category 3 Check 23/25
Notice Description
The Area 10, Asset Support Contract completed on 31st March 2019. Since the start of the AD 10 contract on 1st April, NH has enjoyed support from SPATs framework consultants in the management of existing asset risks that traversed both contracts following the uncertainty of ASC, BBMM expertise not transferring either into NH or the DSC under TUPE legislation for the AD contract. That support has come via recent SPATs2 Framework (TO311). A range of structures asset risks currently occupy the Area 10 Risk Register, some with enhanced inspections and live website monitoring equipment in place. These processes, procedures and interpretation of monitoring equipment and the data produced are vital to maintaining the continued safe and operation of the network where these structures are located. M60 Barton High Level Bridge currently sits within National Highways top 20, "Structures Requiring Most Consideration". This task seeks to ensure the continuing use of expertise through this SPATs2 task to successfully manage the ongoing risks posed by the management of substandard bridges in AD 10, including the provision of essential bridge assessment and design expertise on BHLB. In 1989 BHLB was widened. The design allowed for differential vertical movement between the piers that were constructed as part of the original bridge in 1960 and those added in the 1989 widening scheme. The resulting bridge maintenance manual from the 1989 widening scheme required the then Highways Agency, then Highways England, and now National Highways) to monitor the relative movement of the piers and their impact on the bridge deck and running lanes above. The existing piers were also thought to be suffering from Alkali Silica Reaction A tolerance of -3mm was a condition placed in the manual that if exceeded, National Highways would need to implement a jacking scheme that would lift the bridge deck and reintroduce tolerances back into the bridge. Recent monitoring of these tolerances is indicating that they are at or beyond their limit triggering the need for a possible jacking scheme, the first of which has been implemented at Pier D, with further locations done at Piers P and Q. The pier locations over the Manchester Ship Canal are to be jacked in 2023/24 with design and check in advance of works on site. This main risk posed is the possibility of lane restrictions on the M60 at short notice at this key location where 3 motorways converge. Part of this task seeks to further address those needs that do not warrant capital works with disproportionate costs, aimed at safety critical monitoring while limiting disruption of the M60. Interpretation of monitoring information, provided by NH 3rd party monitoring contractor suppliers, remains a key function of the appointment in further assessment of the bridge deck, which is at it limit for normal traffic loading of 40tonnes and no heavier loads above this.
Notice Details
Publication & Lifecycle
- Open Contracting ID
- ocds-b5fd17-02a654af-b1cb-4283-9104-cafffe104a10
- Publication Source
- Contracts Finder
- Latest Notice
- https://www.contractsfinder.service.gov.uk/Notice/be67e6fa-2333-48c0-85fd-d9b9655a2e93
- Current Stage
- Award
- All Stages
- Award
Procurement Classification
- Notice Type
- Award Notice
- Procurement Type
- Framework
- Procurement Category
- Services
- Procurement Method
- Selective
- Procurement Method Details
- Call-off from a framework agreement
- Tender Suitability
- SME
- Awardee Scale
- Large
Common Procurement Vocabulary (CPV)
- CPV Divisions
73 - Research and development services and related consultancy services
-
- CPV Codes
73220000 - Development consultancy services
Notice Value(s)
- Tender Value
- £449,999 £100K-£500K
- Lots Value
- Not specified
- Awards Value
- £449,999 £100K-£500K
- Contracts Value
- Not specified
Notice Dates
- Publication Date
- 27 Jul 20232 years ago
- Submission Deadline
- 14 Jul 2023Expired
- Future Notice Date
- Not specified
- Award Date
- 26 Jul 20232 years ago
- Contract Period
- 26 Jul 2023 - 31 Mar 2025 1-2 years
- Recurrence
- Not specified
Notice Status
- Tender Status
- Complete
- Lots Status
- Not Specified
- Awards Status
- Active
- Contracts Status
- Not Specified
Buyer & Supplier
Contracting Authority (Buyer)
- Main Buyer
- NATIONAL HIGHWAYS
- Contact Name
- Available with D3 Tenders Premium →
- Contact Email
- Available with D3 Tenders Premium →
- Contact Phone
- Available with D3 Tenders Premium →
Buyer Location
- Locality
- BIRMINGHAM
- Postcode
- B1 1RN
- Post Town
- Birmingham
- Country
- England
-
- Major Region (ITL 1)
- TLG West Midlands (England)
- Basic Region (ITL 2)
- TLG3 West Midlands
- Small Region (ITL 3)
- TLG31 Birmingham
- Delivery Location
- Not specified
-
- Local Authority
- Birmingham
- Electoral Ward
- Ladywood
- Westminster Constituency
- Birmingham Ladywood
Further Information
Notice Documents
-
https://www.contractsfinder.service.gov.uk/Notice/be67e6fa-2333-48c0-85fd-d9b9655a2e93
27th July 2023 - Awarded contract notice on Contracts Finder
Open Contracting Data Standard (OCDS)
View full OCDS Record for this contracting process
The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.
{
"tag": [
"compiled"
],
"id": "ocds-b5fd17-02a654af-b1cb-4283-9104-cafffe104a10-2023-07-27T12:27:54+01:00",
"date": "2023-07-27T12:27:54+01:00",
"ocid": "ocds-b5fd17-02a654af-b1cb-4283-9104-cafffe104a10",
"language": "en",
"initiationType": "tender",
"tender": {
"id": "tender_376245/1241056",
"title": "T0483 AD10 M60 Barton High Level Bridge Steady State Assessment and Category 3 Check 23/25",
"description": "The Area 10, Asset Support Contract completed on 31st March 2019. Since the start of the AD 10 contract on 1st April, NH has enjoyed support from SPATs framework consultants in the management of existing asset risks that traversed both contracts following the uncertainty of ASC, BBMM expertise not transferring either into NH or the DSC under TUPE legislation for the AD contract. That support has come via recent SPATs2 Framework (TO311). A range of structures asset risks currently occupy the Area 10 Risk Register, some with enhanced inspections and live website monitoring equipment in place. These processes, procedures and interpretation of monitoring equipment and the data produced are vital to maintaining the continued safe and operation of the network where these structures are located. M60 Barton High Level Bridge currently sits within National Highways top 20, \"Structures Requiring Most Consideration\". This task seeks to ensure the continuing use of expertise through this SPATs2 task to successfully manage the ongoing risks posed by the management of substandard bridges in AD 10, including the provision of essential bridge assessment and design expertise on BHLB. In 1989 BHLB was widened. The design allowed for differential vertical movement between the piers that were constructed as part of the original bridge in 1960 and those added in the 1989 widening scheme. The resulting bridge maintenance manual from the 1989 widening scheme required the then Highways Agency, then Highways England, and now National Highways) to monitor the relative movement of the piers and their impact on the bridge deck and running lanes above. The existing piers were also thought to be suffering from Alkali Silica Reaction A tolerance of -3mm was a condition placed in the manual that if exceeded, National Highways would need to implement a jacking scheme that would lift the bridge deck and reintroduce tolerances back into the bridge. Recent monitoring of these tolerances is indicating that they are at or beyond their limit triggering the need for a possible jacking scheme, the first of which has been implemented at Pier D, with further locations done at Piers P and Q. The pier locations over the Manchester Ship Canal are to be jacked in 2023/24 with design and check in advance of works on site. This main risk posed is the possibility of lane restrictions on the M60 at short notice at this key location where 3 motorways converge. Part of this task seeks to further address those needs that do not warrant capital works with disproportionate costs, aimed at safety critical monitoring while limiting disruption of the M60. Interpretation of monitoring information, provided by NH 3rd party monitoring contractor suppliers, remains a key function of the appointment in further assessment of the bridge deck, which is at it limit for normal traffic loading of 40tonnes and no heavier loads above this.",
"status": "complete",
"classification": {
"scheme": "CPV",
"id": "73220000",
"description": "Development consultancy services"
},
"items": [
{
"id": "1",
"deliveryAddresses": [
{
"countryName": "Guernsey"
},
{
"countryName": "Jersey"
}
]
}
],
"value": {
"amount": 449999.13,
"currency": "GBP"
},
"procurementMethod": "selective",
"procurementMethodDetails": "Call-off from a framework agreement",
"tenderPeriod": {
"endDate": "2023-07-14T19:00:00+01:00"
},
"contractPeriod": {
"startDate": "2023-07-27T00:00:00+01:00",
"endDate": "2025-03-31T23:59:59+01:00"
},
"suitability": {
"sme": true,
"vcse": false
},
"mainProcurementCategory": "services"
},
"parties": [
{
"id": "GB-CFS-229658",
"name": "National Highways",
"identifier": {
"legalName": "National Highways"
},
"address": {
"streetAddress": "The Cube, 199 Wharfside Street",
"locality": "Birmingham",
"postalCode": "B1 1RN",
"countryName": "England"
},
"contactPoint": {
"name": "Sophie Wood",
"email": "SPaTS2@nationalhighways.co.uk"
},
"roles": [
"buyer"
]
},
{
"id": "GB-CFS-245684",
"name": "SPaTS Atkins and CH2M Joint Venture",
"identifier": {
"legalName": "SPaTS Atkins and CH2M Joint Venture"
},
"details": {
"scale": "large",
"vcse": false
},
"roles": [
"supplier"
]
}
],
"buyer": {
"id": "GB-CFS-229658",
"name": "National Highways"
},
"awards": [
{
"id": "ocds-b5fd17-02a654af-b1cb-4283-9104-cafffe104a10-1",
"status": "active",
"date": "2023-07-27T00:00:00+01:00",
"datePublished": "2023-07-27T12:27:54+01:00",
"value": {
"amount": 449999.13,
"currency": "GBP"
},
"suppliers": [
{
"id": "GB-CFS-245684",
"name": "SPaTS Atkins and CH2M Joint Venture"
}
],
"contractPeriod": {
"startDate": "2023-07-27T00:00:00+01:00",
"endDate": "2025-03-31T23:59:59+01:00"
},
"documents": [
{
"id": "1",
"documentType": "awardNotice",
"description": "Awarded contract notice on Contracts Finder",
"url": "https://www.contractsfinder.service.gov.uk/Notice/be67e6fa-2333-48c0-85fd-d9b9655a2e93",
"datePublished": "2023-07-27T12:27:54+01:00",
"format": "text/html",
"language": "en"
},
{
"id": "2",
"description": "n/a",
"url": "https://www.contractsfinder.service.gov.uk/Notice/Attachment/86e49ab4-621c-493a-8149-ff837119f27c",
"format": "application/vnd.openxmlformats-officedocument.wordprocessingml.document"
}
]
}
]
}