Notice Information
Notice Title
Louvres C4 - KCSL
Notice Description
Kilnbridge have secured the HS2 Old Oak Common Station Works Package WP10.2 for construction of the Headhouses and Ancillary Buildings. Part of the scope requires the design, manufacture & installation of various ventilation and envelope louvre systems to numerous satellite buildings around the station complex. Those buildings include the following: * South Portal * North portal * West Core * East Core * Various smaller vent structures The scope of works includes a large number of louvre types ranging in size and build up and will include a range of different specification and performance criteria such as: - Acoustic Louvres (various ratings to meet specifications ) - Mechanical louvre (varied to meet specifications) - Louvres to meet various requirements including security, acoustic, fire and weather proof ratings - Various finishes and materials - Isolators applicable to reduce any risk of bi-metallic corrosion. - Pest control mesh (varied to meet specifications) - Securing to various substrates - all louvre materials should be compliant to Class A-S3D2 in accordance with BS EN 13501-1:2007 - Fire rating to comply with BROOF (t4) requirements (varied class ratings to meet specifications for roof louvres) - and all ancillary items where required. This includes detailing all openings including additional supports around the openings. Works include also mock ups, samples and quality benchmarks The Sub subcontract works includes the provision of all necessary People, Equipment, Plant and Materials for the design, testing (where required including potential post installation testing to verify performance), manufacture and possible installation of various louvre systems The Subsubcontractor will be responsible for progressing the louvre schedule and associated Stage 4 drawings through design for manufacture and in some cases, installation. This will require submission to, and acceptance from, the Subcontractor, the Contractor's representatives and the Employer to ensure the provided Sub subcontractors design satisfies the intent prior to construction. All in accordance with the Contractors design procedure and technical assistance requirements. The scope also includes the design, supply, installation, management and removal of any temporary works required to execute the sub subcontract works and the provision of sufficient temporary protection of the louvres. The works will require multiple visits throughout the contract duration from design stage to completion. Quantity of louvres - circa 800+m2 Expected Subsubcontract award Jan 25 Construction is to be carried out over a 2.5 year period commencing in Q1 2026 and completing in late Q2 2028. Multiple visits will be required over this period.
Notice Details
Publication & Lifecycle
- Open Contracting ID
- ocds-b5fd17-3e59d4f4-b87d-4156-a632-5434bd82c7cb
- Publication Source
- Contracts Finder
- Latest Notice
- https://www.contractsfinder.service.gov.uk/Notice/24c569c4-2f3e-4df5-895f-410680e53ef1
- Current Stage
- Tender
- All Stages
- Tender
Procurement Classification
- Notice Type
- Tender Notice
- Procurement Type
- Standard
- Procurement Category
- Works
- Procurement Method
- Not Specified
- Procurement Method Details
- Tender Suitability
- Not specified
- Awardee Scale
- Not specified
Common Procurement Vocabulary (CPV)
- CPV Divisions
42 - Industrial machinery
-
- CPV Codes
42512520 - Louvres
Notice Value(s)
- Tender Value
- £1,000,000 £1M-£10M
- Lots Value
- Not specified
- Awards Value
- Not specified
- Contracts Value
- Not specified
Notice Dates
- Publication Date
- 9 Oct 20241 years ago
- Submission Deadline
- 15 Oct 2024Expired
- Future Notice Date
- Not specified
- Award Date
- Not specified
- Contract Period
- 29 Sep 2025 - 30 Jul 2028 2-3 years
- Recurrence
- Not specified
Notice Status
- Tender Status
- Active
- Lots Status
- Not Specified
- Awards Status
- Not Specified
- Contracts Status
- Not Specified
Buyer & Supplier
Contracting Authority (Buyer)
- Main Buyer
- KILNBRIDGE CONSTRUCTION SERVICES LTD
- Contact Name
- Available with D3 Tenders Premium →
- Contact Email
- Available with D3 Tenders Premium →
- Contact Phone
- Available with D3 Tenders Premium →
Buyer Location
- Locality
- LONDON
- Postcode
- E16 4TL
- Post Town
- East London
- Country
- England
-
- Major Region (ITL 1)
- TLI London
- Basic Region (ITL 2)
- TLI4 Inner London - East
- Small Region (ITL 3)
- TLI41 Hackney and Newham
- Delivery Location
- TLI London
-
- Local Authority
- Newham
- Electoral Ward
- Canning Town North
- Westminster Constituency
- West Ham and Beckton
Further Information
Notice Documents
-
https://www.contractsfinder.service.gov.uk/Notice/24c569c4-2f3e-4df5-895f-410680e53ef1
9th October 2024 - Opportunity notice on Contracts Finder -
https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=85874910
Please follow this link to view the notice.
Open Contracting Data Standard (OCDS)
View full OCDS Record for this contracting process
The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.
{
"tag": [
"compiled"
],
"id": "ocds-b5fd17-3e59d4f4-b87d-4156-a632-5434bd82c7cb-2024-10-09T10:45:04+01:00",
"date": "2024-10-09T10:45:04+01:00",
"ocid": "ocds-b5fd17-3e59d4f4-b87d-4156-a632-5434bd82c7cb",
"language": "en",
"initiationType": "tender",
"tender": {
"id": "C4N85874887",
"title": "Louvres C4 - KCSL",
"description": "Kilnbridge have secured the HS2 Old Oak Common Station Works Package WP10.2 for construction of the Headhouses and Ancillary Buildings. Part of the scope requires the design, manufacture & installation of various ventilation and envelope louvre systems to numerous satellite buildings around the station complex. Those buildings include the following: * South Portal * North portal * West Core * East Core * Various smaller vent structures The scope of works includes a large number of louvre types ranging in size and build up and will include a range of different specification and performance criteria such as: - Acoustic Louvres (various ratings to meet specifications ) - Mechanical louvre (varied to meet specifications) - Louvres to meet various requirements including security, acoustic, fire and weather proof ratings - Various finishes and materials - Isolators applicable to reduce any risk of bi-metallic corrosion. - Pest control mesh (varied to meet specifications) - Securing to various substrates - all louvre materials should be compliant to Class A-S3D2 in accordance with BS EN 13501-1:2007 - Fire rating to comply with BROOF (t4) requirements (varied class ratings to meet specifications for roof louvres) - and all ancillary items where required. This includes detailing all openings including additional supports around the openings. Works include also mock ups, samples and quality benchmarks The Sub subcontract works includes the provision of all necessary People, Equipment, Plant and Materials for the design, testing (where required including potential post installation testing to verify performance), manufacture and possible installation of various louvre systems The Subsubcontractor will be responsible for progressing the louvre schedule and associated Stage 4 drawings through design for manufacture and in some cases, installation. This will require submission to, and acceptance from, the Subcontractor, the Contractor's representatives and the Employer to ensure the provided Sub subcontractors design satisfies the intent prior to construction. All in accordance with the Contractors design procedure and technical assistance requirements. The scope also includes the design, supply, installation, management and removal of any temporary works required to execute the sub subcontract works and the provision of sufficient temporary protection of the louvres. The works will require multiple visits throughout the contract duration from design stage to completion. Quantity of louvres - circa 800+m2 Expected Subsubcontract award Jan 25 Construction is to be carried out over a 2.5 year period commencing in Q1 2026 and completing in late Q2 2028. Multiple visits will be required over this period.",
"datePublished": "2024-10-09T10:45:04+01:00",
"status": "active",
"classification": {
"scheme": "CPV",
"id": "42512520",
"description": "Louvres"
},
"items": [
{
"id": "1",
"deliveryAddresses": [
{
"region": "London",
"countryName": "United Kingdom"
}
]
}
],
"minValue": {
"amount": 500000,
"currency": "GBP"
},
"value": {
"amount": 1000000,
"currency": "GBP"
},
"tenderPeriod": {
"endDate": "2024-10-15T12:00:00+01:00"
},
"contractPeriod": {
"startDate": "2025-09-30T00:00:00+01:00",
"endDate": "2028-07-30T23:59:59+01:00"
},
"suitability": {
"sme": false,
"vcse": false
},
"mainProcurementCategory": "works",
"documents": [
{
"id": "1",
"documentType": "tenderNotice",
"description": "Opportunity notice on Contracts Finder",
"url": "https://www.contractsfinder.service.gov.uk/Notice/24c569c4-2f3e-4df5-895f-410680e53ef1",
"datePublished": "2024-10-09T10:45:04+01:00",
"format": "text/html",
"language": "en"
},
{
"id": "2",
"documentType": "tenderNotice",
"description": "Please follow this link to view the notice.",
"url": "https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=85874910"
}
]
},
"parties": [
{
"id": "GB-CFS-288768",
"name": "Kilnbridge Construction Services Ltd",
"identifier": {
"legalName": "Kilnbridge Construction Services Ltd"
},
"address": {
"streetAddress": "McDermott House, South Crescent",
"locality": "London",
"postalCode": "E164TL",
"countryName": "UK"
},
"contactPoint": {
"name": "Clare Llewellyn",
"email": "supplychain@kilnbridge.com",
"telephone": "07933529243"
},
"roles": [
"buyer"
]
}
],
"buyer": {
"id": "GB-CFS-288768",
"name": "Kilnbridge Construction Services Ltd"
}
}