Black Start Infrastructure and Gas engines in Northern Ireland
Notice Description
EPUKI on behalf of EPKL (together, the "Client") is inviting qualification responses from Economic Operators to Engineer, Procure and Construct (EPC) electrical infrastructure associated with black start and the provision of a new containerised Gas Engine package to provide the site standing loads which have a range from circa 1MW to 3.5MW at its Kilroot site in Northern Ireland ("Procurement"). This package of work forms part of a wider site programme.
Lot Information
Lot 1
Kilroot Power station has 2 coal fired units, 4 GT units and a Battery Energy Storage System ("BESS"). Soon the 2 coal fired units may be decommissioned and 1 or 2 new gas-fired Open Cycle Gas Turbine ("OCGT") 4 peaking units will be installed. These are referred to as OCGT6 and OCGT7 in this document. The 4 existing GT units (GT1 to GT4) will remain and continue to provide services to SONI along with the BESS. Figure 2 (below) provides a general layout of the Kilroot site. The 275kV Kilroot substation is located to the north of the site and enclosed within its own building. The location for the new OCGTs is within the existing turbine building for the coal fired power station. When Kilroot was originally built one half of the building was fitted out with two coal fired units. The other half of the building remained empty except for being used for storage / workshop. The existing GT units, GT1 to GT4, are located to the south east side of the site. GT1 and GT2 are located within a building and connected to the 275kV grid via the coal station electrical systems. GT3 and GT3 are located in separate cabinets, north of the building which houses GT1 and GT2. and connected to the 275kV grid via a common grid connection that is independent to the coal station. The step-up transformer for GT3 and GT4 is located just to the north of GT3 and GT4, this compound also has the 275kV cable sealing ends. The BESS system is physically located in the coal station and connected into one of the coal unit electrical systems for import and export. There is currently no natural gas onsite, however a natural gas supply will be brought onto the Kilroot site for the new OCGTs and gas engine package. The works will be undertaken on an operational Power Station Site. Further detail in relation to the Client requirements can be found in the Market Brochure appended to this SQ. The technical specifications for the Procurement will be formally issued to all Economic Operators shortlisted for the tender stage.
Notice Details
Publication & Lifecycle
- Open Contracting ID
- ocds-h6vhtk-02b146
- Publication Source
- Find A Tender Service
- Latest Notice
- https://www.find-tender.service.gov.uk/Notice/010709-2021
- Current Stage
- Tender
- All Stages
- Tender
Procurement Classification
- Notice Type
- Tender Notice
- Procurement Type
- Standard
- Procurement Category
- Services
- Procurement Method
- Selective
- Procurement Method Details
- Negotiated procedure with prior call for competition
- Tender Suitability
- Not specified
- Awardee Scale
- Not specified
Common Procurement Vocabulary (CPV)
- CPV Divisions
51 - Installation services (except software)
-
- CPV Codes
51111000 - Installation services of electric motors, generators and transformers
Notice Value(s)
- Tender Value
- Not specified
- Lots Value
- Not specified
- Awards Value
- Not specified
- Contracts Value
- Not specified
Notice Dates
- Publication Date
- 14 May 20214 years ago
- Submission Deadline
- 31 May 2021Expired
- Future Notice Date
- Not specified
- Award Date
- Not specified
- Contract Period
- Not specified - Not specified
- Recurrence
- Not specified
Notice Status
- Tender Status
- Active
- Lots Status
- Active
- Awards Status
- Not Specified
- Contracts Status
- Not Specified
Buyer & Supplier
Contracting Authority (Buyer)
- Main Buyer
- EP UK INVESTMENTS LTD
- Contact Name
- Jacqueline Roose
- Contact Email
- jacqueline.roose@epuki.co.uk
- Contact Phone
- +44 7710781708
Buyer Location
- Locality
- LONDON
- Postcode
- SW1A 1EE
- Post Town
- South West London
- Country
- England
-
- Major Region (ITL 1)
- TLI London
- Basic Region (ITL 2)
- TLI3 Inner London - West
- Small Region (ITL 3)
- TLI35 Westminster and City of London
- Delivery Location
- TLN Northern Ireland
-
- Local Authority
- Westminster
- Electoral Ward
- St James's
- Westminster Constituency
- Cities of London and Westminster
Further Information
Open Contracting Data Standard (OCDS)
View full OCDS Record for this contracting process
The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.
{
"tag": [
"compiled"
],
"id": "ocds-h6vhtk-02b146-2021-05-14T15:14:13+01:00",
"date": "2021-05-14T15:14:13+01:00",
"ocid": "ocds-h6vhtk-02b146",
"initiationType": "tender",
"tender": {
"id": "ocds-h6vhtk-02b146",
"legalBasis": {
"id": "32014L0025",
"scheme": "CELEX"
},
"title": "Black Start Infrastructure and Gas engines in Northern Ireland",
"status": "active",
"classification": {
"scheme": "CPV",
"id": "51111000",
"description": "Installation services of electric motors, generators and transformers"
},
"mainProcurementCategory": "services",
"description": "EPUKI on behalf of EPKL (together, the \"Client\") is inviting qualification responses from Economic Operators to Engineer, Procure and Construct (EPC) electrical infrastructure associated with black start and the provision of a new containerised Gas Engine package to provide the site standing loads which have a range from circa 1MW to 3.5MW at its Kilroot site in Northern Ireland (\"Procurement\"). This package of work forms part of a wider site programme.",
"lots": [
{
"id": "1",
"description": "Kilroot Power station has 2 coal fired units, 4 GT units and a Battery Energy Storage System (\"BESS\"). Soon the 2 coal fired units may be decommissioned and 1 or 2 new gas-fired Open Cycle Gas Turbine (\"OCGT\") 4 peaking units will be installed. These are referred to as OCGT6 and OCGT7 in this document. The 4 existing GT units (GT1 to GT4) will remain and continue to provide services to SONI along with the BESS. Figure 2 (below) provides a general layout of the Kilroot site. The 275kV Kilroot substation is located to the north of the site and enclosed within its own building. The location for the new OCGTs is within the existing turbine building for the coal fired power station. When Kilroot was originally built one half of the building was fitted out with two coal fired units. The other half of the building remained empty except for being used for storage / workshop. The existing GT units, GT1 to GT4, are located to the south east side of the site. GT1 and GT2 are located within a building and connected to the 275kV grid via the coal station electrical systems. GT3 and GT3 are located in separate cabinets, north of the building which houses GT1 and GT2. and connected to the 275kV grid via a common grid connection that is independent to the coal station. The step-up transformer for GT3 and GT4 is located just to the north of GT3 and GT4, this compound also has the 275kV cable sealing ends. The BESS system is physically located in the coal station and connected into one of the coal unit electrical systems for import and export. There is currently no natural gas onsite, however a natural gas supply will be brought onto the Kilroot site for the new OCGTs and gas engine package. The works will be undertaken on an operational Power Station Site. Further detail in relation to the Client requirements can be found in the Market Brochure appended to this SQ. The technical specifications for the Procurement will be formally issued to all Economic Operators shortlisted for the tender stage.",
"contractPeriod": {
"startDate": "2021-08-01T00:00:00+01:00"
},
"hasRenewal": false,
"submissionTerms": {
"variantPolicy": "allowed"
},
"hasOptions": false,
"status": "active"
}
],
"items": [
{
"id": "1",
"deliveryAddresses": [
{
"region": "UKN"
}
],
"relatedLot": "1"
}
],
"submissionMethod": [
"electronicSubmission"
],
"submissionMethodDetails": "https://www.epuki.co.uk/getmedia/af03dab3-2895-4fc1-a662-3ecfec8b4bb5/EPUKI-SQ-Black-Start-NI",
"procurementMethod": "selective",
"procurementMethodDetails": "Negotiated procedure with prior call for competition",
"tenderPeriod": {
"endDate": "2021-05-31T12:00:00+01:00"
},
"submissionTerms": {
"languages": [
"en"
]
},
"hasRecurrence": false
},
"parties": [
{
"id": "GB-FTS-16279",
"name": "EP UK INVESTMENTS LTD",
"identifier": {
"legalName": "EP UK INVESTMENTS LTD"
},
"address": {
"streetAddress": "Byron House,7-9 St. James's Street",
"locality": "LONDON",
"region": "UKN",
"postalCode": "SW1A1EE",
"countryName": "United Kingdom"
},
"contactPoint": {
"name": "Jacqueline Roose",
"telephone": "+44 7710781708",
"email": "jacqueline.roose@epuki.co.uk",
"url": "https://www.epuki.co.uk/getmedia/af03dab3-2895-4fc1-a662-3ecfec8b4bb5/EPUKI-SQ-Black-Start-NI"
},
"roles": [
"buyer"
],
"details": {
"url": "http://www.epuki.co.uk",
"classifications": [
{
"scheme": "TED_CE_ACTIVITY",
"id": "ELECTRICITY",
"description": "Electricity"
}
]
}
},
{
"id": "GB-FTS-16280",
"name": "High Court of Justice in Northern Ireland",
"identifier": {
"legalName": "High Court of Justice in Northern Ireland"
},
"address": {
"streetAddress": "Royal Courts of Justice, Chichester Street,",
"locality": "Belfast",
"postalCode": "BT1 3JY",
"countryName": "United Kingdom"
},
"roles": [
"reviewBody"
]
}
],
"buyer": {
"id": "GB-FTS-16279",
"name": "EP UK INVESTMENTS LTD"
},
"language": "en"
}