Notice Information
Notice Title
NCC460 Provision of Winter Maintenance Services
Notice Description
The Contracting Authority appointed contractors to provide the following services on a call off basis across specified routes throughout the county of Northumberland: * Snow ploughing; * Snow blowing; * Some precautionary gritting. In addition to specified routes, services may also include snow clearance and treatment of rural roads, housing estate roads, car parks, leisure centres, public buildings etc. The services are split across 45 individual Lots based on geographical area and are across three operational areas of the county.
Lot Information
Lot 1
The Council is seeking to appoint contractors to provide Winter Maintenance Services throughout the county of Northumberland. The services required under the contract will include snow ploughing, snow blowing and gritting of various specified routes throughout Northumberland. The services required are currently split across 44 individual Lots based on geographical area.
Renewal: It is proposed that any resulting contract will be for an initial period of 48 months, commencing 1st November 2021, with options to extend for up to a further 3 x 24 months. As a result the anticipated earliest date for renewal will be 2025.
Berwick - AncroftThe Contracting Authority appointed the contractor to provide the following services on a call off basis across specified routes within the Lot in question: * Snow ploughing; * Snow blowing; * Some precautionary gritting. In addition to specified routes, services may also include snow clearance and treatment of rural roads, housing estate roads, car parks, leisure centres, public buildings etc.
Renewal: Initial 48 month contract with options to extend for up to 3 x 24 months. The earliest it is anticipated that this opportunity will be re-tendered is July 2025, with the latest being July 2031 if all options to extend are taken up.
Duddo - CornhillThe Contracting Authority appointed the contractor to provide the following services on a call off basis across specified routes within the Lot in question: * Snow ploughing; * Snow blowing; * Some precautionary gritting. In addition to specified routes, services may also include snow clearance and treatment of rural roads, housing estate roads, car parks, leisure centres, public buildings etc.
Renewal: Initial 48 month contract with options to extend for up to 3 x 24 months. The earliest it is anticipated that this opportunity will be re-tendered is July 2022, with the latest being July 2031 if all options to extend are taken up.
WarkThe Contracting Authority appointed the contractor to provide the following services on a call off basis across specified routes within the Lot in question: * Snow ploughing; * Snow blowing; * Some precautionary gritting. In addition to specified routes, services may also include snow clearance and treatment of rural roads, housing estate roads, car parks, leisure centres, public buildings etc.
Renewal: Initial 48 month contract with options to extend for up to 3 x 24 months. The earliest it is anticipated that this opportunity will be re-tendered is July 2025, with the latest being July 2031 if all options to extend are taken up.
MindrumThe Contracting Authority appointed the contractor to provide the following services on a call off basis across specified routes within the Lot in question: * Snow ploughing; * Snow blowing; * Some precautionary gritting. In addition to specified routes, services may also include snow clearance and treatment of rural roads, housing estate roads, car parks, leisure centres, public buildings etc.
Renewal: Initial 48 month contract with options to extend for up to 3 x 24 months. The earliest it is anticipated that this opportunity will be re-tendered is July 2025, with the latest being July 2031 if all options to extend are taken up.
WoolerThe Contracting Authority appointed the contractor to provide the following services on a call off basis across specified routes within the Lot in question: * Snow ploughing; * Snow blowing; * Some precautionary gritting. In addition to specified routes, services may also include snow clearance and treatment of rural roads, housing estate roads, car parks, leisure centres, public buildings etc.
Renewal: Initial 48 month contract with options to extend for up to 3 x 24 months. The earliest it is anticipated that this opportunity will be re-tendered is July 2022, with the latest being July 2031 if all options to extend are taken up.
Belford - ChattonThe Contracting Authority appointed the contractor to provide the following services on a call off basis across specified routes within the Lot in question: * Snow ploughing; * Snow blowing; * Some precautionary gritting. In addition to specified routes, services may also include snow clearance and treatment of rural roads, housing estate roads, car parks, leisure centres, public buildings etc.
Renewal: Initial 48 month contract with options to extend for up to 3 x 24 months. The earliest it is anticipated that this opportunity will be re-tendered is July 2022, with the latest being July 2031 if all options to extend are taken up.
WarenfordThe Contracting Authority appointed the contractor to provide the following services on a call off basis across specified routes within the Lot in question: * Snow ploughing; * Snow blowing; * Some precautionary gritting. In addition to specified routes, services may also include snow clearance and treatment of rural roads, housing estate roads, car parks, leisure centres, public buildings etc.
Renewal: Initial 48 month contract with options to extend for up to 3 x 24 months. The earliest it is anticipated that this opportunity will be re-tendered is July 2022, with the latest being July 2031 if all options to extend are taken up.
Embleton - South CharltonThe Contracting Authority appointed the contractor to provide the following services on a call off basis across specified routes within the Lot in question: * Snow ploughing; * Snow blowing; * Some precautionary gritting. In addition to specified routes, services may also include snow clearance and treatment of rural roads, housing estate roads, car parks, leisure centres, public buildings etc.
Renewal: Initial 48 month contract with options to extend for up to 3 x 24 months. The earliest it is anticipated that this opportunity will be re-tendered is July 2022, with the latest being July 2031 if all options to extend are taken up.
PowburnThe Contracting Authority appointed the contractor to provide the following services on a call off basis across specified routes within the Lot in question: * Snow ploughing; * Snow blowing; * Some precautionary gritting. In addition to specified routes, services may also include snow clearance and treatment of rural roads, housing estate roads, car parks, leisure centres, public buildings etc.
Renewal: Initial 48 month contract with options to extend for up to 3 x 24 months. The earliest it is anticipated that this opportunity will be re-tendered is July 2022, with the latest being July 2031 if all options to extend are taken up.
Netherton - AlwintonThe Contracting Authority appointed the contractor to provide the following services on a call off basis across specified routes within the Lot in question: * Snow ploughing; * Snow blowing; * Some precautionary gritting. In addition to specified routes, services may also include snow clearance and treatment of rural roads, housing estate roads, car parks, leisure centres, public buildings etc.
Renewal: Initial 48 month contract with options to extend for up to 3 x 24 months. The earliest it is anticipated that this opportunity will be re-tendered is July 2022, with the latest being July 2031 if all options to extend are taken up.
EdlinghamThe Contracting Authority appointed the contractor to provide the following services on a call off basis across specified routes within the Lot in question: * Snow ploughing; * Snow blowing; * Some precautionary gritting. In addition to specified routes, services may also include snow clearance and treatment of rural roads, housing estate roads, car parks, leisure centres, public buildings etc.
Renewal: Initial 48 month contract with options to extend for up to 3 x 24 months. The earliest it is anticipated that this opportunity will be re-tendered is July 2022, with the latest being July 2031 if all options to extend are taken up.
PauperhaughThe Contracting Authority appointed the contractor to provide the following services on a call off basis across specified routes within the Lot in question: * Snow ploughing; * Snow blowing; * Some precautionary gritting. In addition to specified routes, services may also include snow clearance and treatment of rural roads, housing estate roads, car parks, leisure centres, public buildings etc.
Renewal: Initial 48 month contract with options to extend for up to 3 x 24 months. The earliest it is anticipated that this opportunity will be re-tendered is July 2022, with the latest being July 2031 if all options to extend are taken up.
Morpeth - ShilbottleThe Contracting Authority appointed the contractor to provide the following services on a call off basis across specified routes within the Lot in question: * Snow ploughing; * Snow blowing; * Some precautionary gritting. In addition to specified routes, services may also include snow clearance and treatment of rural roads, housing estate roads, car parks, leisure centres, public buildings etc.
Renewal: Initial 48 month contract with options to extend for up to 3 x 24 months. The earliest it is anticipated that this opportunity will be re-tendered is July 2022, with the latest being July 2031 if all options to extend are taken up.
NetherwittonThe Contracting Authority appointed the contractor to provide the following services on a call off basis across specified routes within the Lot in question: * Snow ploughing; * Snow blowing; * Some precautionary gritting. In addition to specified routes, services may also include snow clearance and treatment of rural roads, housing estate roads, car parks, leisure centres, public buildings etc.
Renewal: Initial 48 month contract with options to extend for up to 3 x 24 months. The earliest it is anticipated that this opportunity will be re-tendered is July 2022, with the latest being July 2031 if all options to extend are taken up.
ElsdonThe Contracting Authority appointed the contractor to provide the following services on a call off basis across specified routes within the Lot in question: * Snow ploughing; * Snow blowing; * Some precautionary gritting. In addition to specified routes, services may also include snow clearance and treatment of rural roads, housing estate roads, car parks, leisure centres, public buildings etc.
Renewal: Initial 48 month contract with options to extend for up to 3 x 24 months. The earliest it is anticipated that this opportunity will be re-tendered is July 2022, with the latest being July 2031 if all options to extend are taken up.
Lynmouth and EllingtonThe Contracting Authority appointed the contractor to provide the following services on a call off basis across specified routes within the Lot in question: * Snow ploughing; * Snow blowing; * Some precautionary gritting. In addition to specified routes, services may also include snow clearance and treatment of rural roads, housing estate roads, car parks, leisure centres, public buildings etc.
Renewal: Initial 48 month contract with options to extend for up to 3 x 24 months. The earliest it is anticipated that this opportunity will be re-tendered is July 2022, with the latest being July 2031 if all options to extend are taken up.
WansbeckThe Contracting Authority appointed the contractor to provide the following services on a call off basis across specified routes within the Lot in question: * Snow ploughing; * Snow blowing; * Some precautionary gritting. In addition to specified routes, services may also include snow clearance and treatment of rural roads, housing estate roads, car parks, leisure centres, public buildings etc.
Renewal: Initial 48 month contract with options to extend for up to 3 x 24 months. The earliest it is anticipated that this opportunity will be re-tendered is July 2022, with the latest being July 2031 if all options to extend are taken up.
Blyth ValleyThe Contracting Authority appointed the contractor to provide the following services on a call off basis across specified routes within the Lot in question: * Snow ploughing; * Snow blowing; * Some precautionary gritting. In addition to specified routes, services may also include snow clearance and treatment of rural roads, housing estate roads, car parks, leisure centres, public buildings etc.
Renewal: Initial 48 month contract with options to extend for up to 3 x 24 months. The earliest it is anticipated that this opportunity will be re-tendered is July 2022, with the latest being July 2031 if all options to extend are taken up.
Cambo and PontelandThe Contracting Authority appointed the contractor to provide the following services on a call off basis across specified routes within the Lot in question: * Snow ploughing; * Snow blowing; * Some precautionary gritting. In addition to specified routes, services may also include snow clearance and treatment of rural roads, housing estate roads, car parks, leisure centres, public buildings etc.
Renewal: Initial 48 month contract with options to extend for up to 3 x 24 months. The earliest it is anticipated that this opportunity will be re-tendered is July 2022, with the latest being July 2031 if all options to extend are taken up.
KielderThe Contracting Authority appointed the contractor to provide the following services on a call off basis across specified routes within the Lot in question: * Snow ploughing; * Snow blowing; * Some precautionary gritting. In addition to specified routes, services may also include snow clearance and treatment of rural roads, housing estate roads, car parks, leisure centres, public buildings etc.
Renewal: Initial 48 month contract with options to extend for up to 3 x 24 months. The earliest it is anticipated that this opportunity will be re-tendered is July 2022, with the latest being July 2031 if all options to extend are taken up.
WoodburnThe Contracting Authority appointed the contractor to provide the following services on a call off basis across specified routes within the Lot in question: * Snow ploughing; * Snow blowing; * Some precautionary gritting. In addition to specified routes, services may also include snow clearance and treatment of rural roads, housing estate roads, car parks, leisure centres, public buildings etc.
Renewal: Initial 48 month contract with options to extend for up to 3 x 24 months. The earliest it is anticipated that this opportunity will be re-tendered is July 2022, with the latest being July 2031 if all options to extend are taken up.
BellinghamThe Contracting Authority appointed the contractor to provide the following services on a call off basis across specified routes within the Lot in question: * Snow ploughing; * Snow blowing; * Some precautionary gritting. In addition to specified routes, services may also include snow clearance and treatment of rural roads, housing estate roads, car parks, leisure centres, public buildings etc.
Renewal: Initial 48 month contract with options to extend for up to 3 x 24 months. The earliest it is anticipated that this opportunity will be re-tendered is July 2022, with the latest being July 2031 if all options to extend are taken up.
StonehaughThe Contracting Authority appointed the contractor to provide the following services on a call off basis across specified routes within the Lot in question: * Snow ploughing; * Snow blowing; * Some precautionary gritting. In addition to specified routes, services may also include snow clearance and treatment of rural roads, housing estate roads, car parks, leisure centres, public buildings etc.
Renewal: Initial 48 month contract with options to extend for up to 3 x 24 months. The earliest it is anticipated that this opportunity will be re-tendered is July 2022, with the latest being July 2031 if all options to extend are taken up.
BirtleyThe Contracting Authority appointed the contractor to provide the following services on a call off basis across specified routes within the Lot in question: * Snow ploughing; * Snow blowing; * Some precautionary gritting. In addition to specified routes, services may also include snow clearance and treatment of rural roads, housing estate roads, car parks, leisure centres, public buildings etc.
Renewal: Initial 48 month contract with options to extend for up to 3 x 24 months. The earliest it is anticipated that this opportunity will be re-tendered is July 2022, with the latest being July 2031 if all options to extend are taken up.
BavingtonThe Contracting Authority appointed the contractor to provide the following services on a call off basis across specified routes within the Lot in question: * Snow ploughing; * Snow blowing; * Some precautionary gritting. In addition to specified routes, services may also include snow clearance and treatment of rural roads, housing estate roads, car parks, leisure centres, public buildings etc.
Renewal: Initial 48 month contract with options to extend for up to 3 x 24 months. The earliest it is anticipated that this opportunity will be re-tendered is July 2022, with the latest being July 2031 if all options to extend are taken up.
MatfenThe Contracting Authority appointed the contractor to provide the following services on a call off basis across specified routes within the Lot in question: * Snow ploughing; * Snow blowing; * Some precautionary gritting. In addition to specified routes, services may also include snow clearance and treatment of rural roads, housing estate roads, car parks, leisure centres, public buildings etc.
Renewal: Initial 48 month contract with options to extend for up to 3 x 24 months. The earliest it is anticipated that this opportunity will be re-tendered is July 2022, with the latest being July 2031 if all options to extend are taken up.
StamfordhamThe Contracting Authority appointed the contractor to provide the following services on a call off basis across specified routes within the Lot in question: * Snow ploughing; * Snow blowing; * Some precautionary gritting. In addition to specified routes, services may also include snow clearance and treatment of rural roads, housing estate roads, car parks, leisure centres, public buildings etc.
Renewal: Initial 48 month contract with options to extend for up to 3 x 24 months. The earliest it is anticipated that this opportunity will be re-tendered is July 2022, with the latest being July 2031 if all options to extend are taken up.
Whittle DeneThe Contracting Authority appointed the contractor to provide the following services on a call off basis across specified routes within the Lot in question: * Snow ploughing; * Snow blowing; * Some precautionary gritting. In addition to specified routes, services may also include snow clearance and treatment of rural roads, housing estate roads, car parks, leisure centres, public buildings etc.
Renewal: Initial 48 month contract with options to extend for up to 3 x 24 months. The earliest it is anticipated that this opportunity will be re-tendered is July 2022, with the latest being July 2031 if all options to extend are taken up.
ChollerfordThe Contracting Authority appointed the contractor to provide the following services on a call off basis across specified routes within the Lot in question: * Snow ploughing; * Snow blowing; * Some precautionary gritting. In addition to specified routes, services may also include snow clearance and treatment of rural roads, housing estate roads, car parks, leisure centres, public buildings etc.
Renewal: Initial 48 month contract with options to extend for up to 3 x 24 months. The earliest it is anticipated that this opportunity will be re-tendered is July 2022, with the latest being July 2031 if all options to extend are taken up.
NewbroughThe Contracting Authority appointed the contractor to provide the following services on a call off basis across specified routes within the Lot in question: * Snow ploughing; * Snow blowing; * Some precautionary gritting. In addition to specified routes, services may also include snow clearance and treatment of rural roads, housing estate roads, car parks, leisure centres, public buildings etc.
Renewal: Initial 48 month contract with options to extend for up to 3 x 24 months. The earliest it is anticipated that this opportunity will be re-tendered is July 2022, with the latest being July 2031 if all options to extend are taken up.
Haltwhistle NorthThe Contracting Authority appointed the contractor to provide the following services on a call off basis across specified routes within the Lot in question: * Snow ploughing; * Snow blowing; * Some precautionary gritting. In addition to specified routes, services may also include snow clearance and treatment of rural roads, housing estate roads, car parks, leisure centres, public buildings etc.
Renewal: Initial 48 month contract with options to extend for up to 3 x 24 months. The earliest it is anticipated that this opportunity will be re-tendered is July 2022, with the latest being July 2031 if all options to extend are taken up.
Haltwhistle SorthThe Contracting Authority appointed the contractor to provide the following services on a call off basis across specified routes within the Lot in question: * Snow ploughing; * Snow blowing; * Some precautionary gritting. In addition to specified routes, services may also include snow clearance and treatment of rural roads, housing estate roads, car parks, leisure centres, public buildings etc.
Renewal: Initial 48 month contract with options to extend for up to 3 x 24 months. The earliest it is anticipated that this opportunity will be re-tendered is July 2022, with the latest being July 2031 if all options to extend are taken up.
WhitfieldThe Contracting Authority appointed the contractor to provide the following services on a call off basis across specified routes within the Lot in question: * Snow ploughing; * Snow blowing; * Some precautionary gritting. In addition to specified routes, services may also include snow clearance and treatment of rural roads, housing estate roads, car parks, leisure centres, public buildings etc.
Renewal: Initial 48 month contract with options to extend for up to 3 x 24 months. The earliest it is anticipated that this opportunity will be re-tendered is July 2022, with the latest being July 2031 if all options to extend are taken up.
SlaggyfordThe Contracting Authority appointed the contractor to provide the following services on a call off basis across specified routes within the Lot in question: * Snow ploughing; * Snow blowing; * Some precautionary gritting. In addition to specified routes, services may also include snow clearance and treatment of rural roads, housing estate roads, car parks, leisure centres, public buildings etc.
Renewal: Initial 48 month contract with options to extend for up to 3 x 24 months. The earliest it is anticipated that this opportunity will be re-tendered is July 2022, with the latest being July 2031 if all options to extend are taken up.
North East AllendaleThe Contracting Authority appointed the contractor to provide the following services on a call off basis across specified routes within the Lot in question: * Snow ploughing; * Snow blowing; * Some precautionary gritting. In addition to specified routes, services may also include snow clearance and treatment of rural roads, housing estate roads, car parks, leisure centres, public buildings etc.
Renewal: Initial 48 month contract with options to extend for up to 3 x 24 months. The earliest it is anticipated that this opportunity will be re-tendered is July 2022, with the latest being July 2031 if all options to extend are taken up.
North West AllendaleThe Contracting Authority appointed the contractor to provide the following services on a call off basis across specified routes within the Lot in question: * Snow ploughing; * Snow blowing; * Some precautionary gritting. In addition to specified routes, services may also include snow clearance and treatment of rural roads, housing estate roads, car parks, leisure centres, public buildings etc.
Renewal: Initial 48 month contract with options to extend for up to 3 x 24 months. The earliest it is anticipated that this opportunity will be re-tendered is July 2022, with the latest being July 2031 if all options to extend are taken up.
South AllendaleThe Contracting Authority appointed the contractor to provide the following services on a call off basis across specified routes within the Lot in question: * Snow ploughing; * Snow blowing; * Some precautionary gritting. In addition to specified routes, services may also include snow clearance and treatment of rural roads, housing estate roads, car parks, leisure centres, public buildings etc.
Renewal: Initial 48 month contract with options to extend for up to 3 x 24 months. The earliest it is anticipated that this opportunity will be re-tendered is July 2022, with the latest being July 2031 if all options to extend are taken up.
Haydon BridgeThe Contracting Authority appointed the contractor to provide the following services on a call off basis across specified routes within the Lot in question: * Snow ploughing; * Snow blowing; * Some precautionary gritting. In addition to specified routes, services may also include snow clearance and treatment of rural roads, housing estate roads, car parks, leisure centres, public buildings etc.
Renewal: Initial 48 month contract with options to extend for up to 3 x 24 months. The earliest it is anticipated that this opportunity will be re-tendered is July 2022, with the latest being July 2031 if all options to extend are taken up.
HexhamThe Contracting Authority appointed the contractor to provide the following services on a call off basis across specified routes within the Lot in question: * Snow ploughing; * Snow blowing; * Some precautionary gritting. In addition to specified routes, services may also include snow clearance and treatment of rural roads, housing estate roads, car parks, leisure centres, public buildings etc.
Renewal: Initial 48 month contract with options to extend for up to 3 x 24 months. The earliest it is anticipated that this opportunity will be re-tendered is July 2022, with the latest being July 2031 if all options to extend are taken up.
CorbridgeThe Contracting Authority appointed the contractor to provide the following services on a call off basis across specified routes within the Lot in question: * Snow ploughing; * Snow blowing; * Some precautionary gritting. In addition to specified routes, services may also include snow clearance and treatment of rural roads, housing estate roads, car parks, leisure centres, public buildings etc.
Renewal: Initial 48 month contract with options to extend for up to 3 x 24 months. The earliest it is anticipated that this opportunity will be re-tendered is July 2022, with the latest being July 2031 if all options to extend are taken up.
Tyne ValleyThe Contracting Authority appointed the contractor to provide the following services on a call off basis across specified routes within the Lot in question: * Snow ploughing; * Snow blowing; * Some precautionary gritting. In addition to specified routes, services may also include snow clearance and treatment of rural roads, housing estate roads, car parks, leisure centres, public buildings etc.
Renewal: Initial 48 month contract with options to extend for up to 3 x 24 months. The earliest it is anticipated that this opportunity will be re-tendered is July 2022, with the latest being July 2031 if all options to extend are taken up.
HedleyThe Contracting Authority appointed the contractor to provide the following services on a call off basis across specified routes within the Lot in question: * Snow ploughing; * Snow blowing; * Some precautionary gritting. In addition to specified routes, services may also include snow clearance and treatment of rural roads, housing estate roads, car parks, leisure centres, public buildings etc.
Renewal: Initial 48 month contract with options to extend for up to 3 x 24 months. The earliest it is anticipated that this opportunity will be re-tendered is July 2022, with the latest being July 2031 if all options to extend are taken up.
WhittonstallThe Contracting Authority appointed the contractor to provide the following services on a call off basis across specified routes within the Lot in question: * Snow ploughing; * Snow blowing; * Some precautionary gritting. In addition to specified routes, services may also include snow clearance and treatment of rural roads, housing estate roads, car parks, leisure centres, public buildings etc.
Renewal: Initial 48 month contract with options to extend for up to 3 x 24 months. The earliest it is anticipated that this opportunity will be re-tendered is July 2022, with the latest being July 2031 if all options to extend are taken up.
SlaleyThe Contracting Authority appointed the contractor to provide the following services on a call off basis across specified routes within the Lot in question: * Snow ploughing; * Snow blowing; * Some precautionary gritting. In addition to specified routes, services may also include snow clearance and treatment of rural roads, housing estate roads, car parks, leisure centres, public buildings etc.
Renewal: Initial 48 month contract with options to extend for up to 3 x 24 months. The earliest it is anticipated that this opportunity will be re-tendered is July 2022, with the latest being July 2031 if all options to extend are taken up.
HexhamshireThe Contracting Authority appointed the contractor to provide the following services on a call off basis across specified routes within the Lot in question: * Snow ploughing; * Snow blowing; * Some precautionary gritting. In addition to specified routes, services may also include snow clearance and treatment of rural roads, housing estate roads, car parks, leisure centres, public buildings etc.
Renewal: Initial 48 month contract with options to extend for up to 3 x 24 months. The earliest it is anticipated that this opportunity will be re-tendered is July 2022, with the latest being July 2031 if all options to extend are taken up.
Notice Details
Publication & Lifecycle
- Open Contracting ID
- ocds-h6vhtk-02bd9f
- Publication Source
- Find A Tender Service
- Latest Notice
- https://www.find-tender.service.gov.uk/Notice/018694-2022
- Current Stage
- Award
- All Stages
- Planning, Tender, Award
Procurement Classification
- Notice Type
- Planning Notice
- Procurement Type
- Framework
- Procurement Category
- Services
- Procurement Method
- Open
- Procurement Method Details
- Open procedure
- Tender Suitability
- Not specified
- Awardee Scale
- Large, SME
Common Procurement Vocabulary (CPV)
- CPV Divisions
-
- CPV Codes
90620000 - Snow-clearing services
Notice Value(s)
- Tender Value
- £3,000,000 £1M-£10M
- Lots Value
- Not specified
- Awards Value
- Not specified
- Contracts Value
- Not specified
Notice Dates
- Publication Date
- 8 Jul 20224 years ago
- Submission Deadline
- 24 Sep 2021Expired
- Future Notice Date
- 29 Jul 2021Expired
- Award Date
- 1 Nov 20214 years ago
- Contract Period
- Not specified - Not specified
- Recurrence
- The earliest it is anticipated that this opportunity will be re-tendered is July 2022, with the latest being July 2031 if all options to extend are taken up.
Notice Status
- Tender Status
- Complete
- Lots Status
- Cancelled, Planned
- Awards Status
- Active
- Contracts Status
- Active
Buyer & Supplier
Contracting Authority (Buyer)
- Main Buyer
- Northumberland County Council
- Contact Name
- Available with D3 Tenders Premium →
- Contact Email
- Available with D3 Tenders Premium →
- Contact Phone
- Available with D3 Tenders Premium →
Buyer Location
- Locality
- MORPETH
- Postcode
- NE61 2EF
- Postcode Area
- Newcastle upon Tyne
- Country
- England
-
- Major Region (ITL 1)
- TLC North East (England)
- Basic Region (ITL 2)
- TLC4 Northumberland, Durham and Tyne & Wear
- Small Region (ITL 3)
- TLC42 Northumberland
- Delivery Location
- TLC2 Northumberland, and Tyne and Wear, TLC21 Northumberland
-
- Local Authority
- Northumberland
- Electoral Ward
- Morpeth Kirkhill
- Westminster Constituency
- North Northumberland
Further Information
Open Contracting Data Standard (OCDS)
The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.