Notice Information
Notice Title
Terminal and Amenities Building Expansion
Notice Description
London Gateway Port Limited is planning to extend the existing Terminal Building and Amenities Building at the Port. The two buildings are located within the operational area of the Port and they shall continue to be occupied and operational during construction stage. Access for people and port vehicles/cranes/equipment to both buildings shall be maintained. The existing Terminal Building (TB) is a steel framed building comprises a four-storey office area located at the centre of the TB. To the north of the TB is a single-storey Internal Mobile Vehicle (IMV) workshop with a two-storey store and to the south is a single-storey Shuttle Carrier (SHC) workshop. The existing Amenities Building (AB) is a three-storey steel framed building that provides toilets, changing rooms/locker facilities, canteen, gym and office. Both of TB and AB have a BREEAM rating of "Very Good" under the NC2011 technical standard. The Terminal Building extension includes but is not limited to - a four-storey extension of circa total 1,200 sq.m. floor area to office area; - two repair bays of one-storey 15m high circa 650 sq.m. floor area to IMV workshop; - two repair bays of one-storey 20m high circa 650 sq.m. floor area to SHC workshop; - an overhead crane to the external repair bays; - an oil storage extension; - a new grease pit; - extension of existing climate controlled room; - modification of existing office areas. The Amenities Building extension includes but is not limited to - a three-storey extension of circa total 600 sq.m. floor area to the east of the Amenities Building. The tentative commencement of site works will be October 2022. The time for completion of the works is 8 months.
Lot Information
Lot 1
London Gateway Port Limited is planning to extend the existing Terminal Building and Amenities Building at the Port. The two buildings are located within the operational area of the Port and they shall continue to be occupied and operational during construction stage. Access for people and port vehicles/cranes/equipment to both buildings shall be maintained. The existing Terminal Building (TB) is a steel framed building comprises a four-storey office area located at the centre of the TB. To the north of the TB is a single-storey Internal Mobile Vehicle (IMV) workshop with a two-storey store and to the south is a single-storey Shuttle Carrier (SHC) workshop. The existing Amenities Building (AB) is a three-storey steel framed building that provides toilets, changing rooms/locker facilities, canteen, gym and office. Both of TB and AB have a BREEAM rating of "Very Good" under the NC2011 technical standard. The Terminal Building extension includes but is not limited to - a four-storey extension of circa total 1,200 sq.m. floor area to office area; - two repair bays of one-storey 15m high circa 650 sq.m. floor area to IMV workshop; - two repair bays of one-storey 20m high circa 650 sq.m. floor area to SHC workshop; - an overhead crane to the external repair bays; - an oil storage extension; - a new grease pit; - extension of existing climate controlled room; - modification of existing office areas. The Amenities Building extension includes but is not limited to - a three-storey extension of circa total 600 sq.m. floor area to the east of the Amenities Building. The tentative commencement of site works will be October 2022. The time for completion of the works is 8 months.
Notice Details
Publication & Lifecycle
- Open Contracting ID
- ocds-h6vhtk-03487b
- Publication Source
- Find A Tender Service
- Latest Notice
- https://www.find-tender.service.gov.uk/Notice/016854-2022
- Current Stage
- Tender
- All Stages
- Tender
Procurement Classification
- Notice Type
- Tender Notice
- Procurement Type
- Standard
- Procurement Category
- Works
- Procurement Method
- Selective
- Procurement Method Details
- Restricted procedure
- Tender Suitability
- Not specified
- Awardee Scale
- Not specified
Common Procurement Vocabulary (CPV)
- CPV Divisions
45 - Construction work
-
- CPV Codes
45000000 - Construction work
45210000 - Building construction work
Notice Value(s)
- Tender Value
- Not specified
- Lots Value
- Not specified
- Awards Value
- Not specified
- Contracts Value
- Not specified
Notice Dates
- Publication Date
- 20 Jun 20223 years ago
- Submission Deadline
- 26 Jul 2022Expired
- Future Notice Date
- Not specified
- Award Date
- Not specified
- Contract Period
- Not specified - Not specified
- Recurrence
- Not specified
Notice Status
- Tender Status
- Active
- Lots Status
- Active
- Awards Status
- Not Specified
- Contracts Status
- Not Specified
Buyer & Supplier
Contracting Authority (Buyer)
- Main Buyer
- LONDON GATEWAY PORT LIMITED
- Contact Name
- Oluchi Nwaiwu
- Contact Email
- oluchi.nwaiwu@dpworld.com
- Contact Phone
- +44 1375648441
Buyer Location
- Locality
- STANFORD-LE-HOPE
- Postcode
- SS17 9DY
- Post Town
- Southend-on-Sea
- Country
- England
-
- Major Region (ITL 1)
- TLH East (England)
- Basic Region (ITL 2)
- TLH3 Essex
- Small Region (ITL 3)
- TLH32 Thurrock
- Delivery Location
- TLH32 Thurrock
-
- Local Authority
- Thurrock
- Electoral Ward
- Corringham and Fobbing
- Westminster Constituency
- South Basildon and East Thurrock
Further Information
Notice URLs
Open Contracting Data Standard (OCDS)
View full OCDS Record for this contracting process
The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.
{
"tag": [
"compiled"
],
"id": "ocds-h6vhtk-03487b-2022-06-20T16:06:27+01:00",
"date": "2022-06-20T16:06:27+01:00",
"ocid": "ocds-h6vhtk-03487b",
"initiationType": "tender",
"tender": {
"id": "C4506",
"legalBasis": {
"id": "32014L0025",
"scheme": "CELEX"
},
"title": "Terminal and Amenities Building Expansion",
"status": "active",
"classification": {
"scheme": "CPV",
"id": "45000000",
"description": "Construction work"
},
"mainProcurementCategory": "works",
"description": "London Gateway Port Limited is planning to extend the existing Terminal Building and Amenities Building at the Port. The two buildings are located within the operational area of the Port and they shall continue to be occupied and operational during construction stage. Access for people and port vehicles/cranes/equipment to both buildings shall be maintained. The existing Terminal Building (TB) is a steel framed building comprises a four-storey office area located at the centre of the TB. To the north of the TB is a single-storey Internal Mobile Vehicle (IMV) workshop with a two-storey store and to the south is a single-storey Shuttle Carrier (SHC) workshop. The existing Amenities Building (AB) is a three-storey steel framed building that provides toilets, changing rooms/locker facilities, canteen, gym and office. Both of TB and AB have a BREEAM rating of \"Very Good\" under the NC2011 technical standard. The Terminal Building extension includes but is not limited to - a four-storey extension of circa total 1,200 sq.m. floor area to office area; - two repair bays of one-storey 15m high circa 650 sq.m. floor area to IMV workshop; - two repair bays of one-storey 20m high circa 650 sq.m. floor area to SHC workshop; - an overhead crane to the external repair bays; - an oil storage extension; - a new grease pit; - extension of existing climate controlled room; - modification of existing office areas. The Amenities Building extension includes but is not limited to - a three-storey extension of circa total 600 sq.m. floor area to the east of the Amenities Building. The tentative commencement of site works will be October 2022. The time for completion of the works is 8 months.",
"lots": [
{
"id": "1",
"description": "London Gateway Port Limited is planning to extend the existing Terminal Building and Amenities Building at the Port. The two buildings are located within the operational area of the Port and they shall continue to be occupied and operational during construction stage. Access for people and port vehicles/cranes/equipment to both buildings shall be maintained. The existing Terminal Building (TB) is a steel framed building comprises a four-storey office area located at the centre of the TB. To the north of the TB is a single-storey Internal Mobile Vehicle (IMV) workshop with a two-storey store and to the south is a single-storey Shuttle Carrier (SHC) workshop. The existing Amenities Building (AB) is a three-storey steel framed building that provides toilets, changing rooms/locker facilities, canteen, gym and office. Both of TB and AB have a BREEAM rating of \"Very Good\" under the NC2011 technical standard. The Terminal Building extension includes but is not limited to - a four-storey extension of circa total 1,200 sq.m. floor area to office area; - two repair bays of one-storey 15m high circa 650 sq.m. floor area to IMV workshop; - two repair bays of one-storey 20m high circa 650 sq.m. floor area to SHC workshop; - an overhead crane to the external repair bays; - an oil storage extension; - a new grease pit; - extension of existing climate controlled room; - modification of existing office areas. The Amenities Building extension includes but is not limited to - a three-storey extension of circa total 600 sq.m. floor area to the east of the Amenities Building. The tentative commencement of site works will be October 2022. The time for completion of the works is 8 months.",
"contractPeriod": {
"durationInDays": 240
},
"hasRenewal": false,
"submissionTerms": {
"variantPolicy": "notAllowed"
},
"hasOptions": false,
"status": "active"
}
],
"items": [
{
"id": "1",
"additionalClassifications": [
{
"scheme": "CPV",
"id": "45210000",
"description": "Building construction work"
}
],
"deliveryAddresses": [
{
"region": "UKH32"
}
],
"relatedLot": "1"
}
],
"submissionMethod": [
"electronicSubmission",
"written"
],
"submissionMethodDetails": "https://dpworld.tejari.com",
"procurementMethod": "selective",
"procurementMethodDetails": "Restricted procedure",
"coveredBy": [
"GPA"
],
"tenderPeriod": {
"endDate": "2022-07-26T23:59:00+01:00"
},
"secondStage": {
"invitationDate": "2022-08-08T00:00:00+01:00"
},
"submissionTerms": {
"languages": [
"en"
],
"bidValidityPeriod": {
"durationInDays": 270
}
},
"hasRecurrence": false,
"contractTerms": {
"hasElectronicOrdering": true,
"electronicInvoicingPolicy": "allowed",
"hasElectronicPayment": true
}
},
"parties": [
{
"id": "GB-FTS-13225",
"name": "London Gateway Port Limited",
"identifier": {
"legalName": "London Gateway Port Limited"
},
"address": {
"streetAddress": "No 1 London Gateway",
"locality": "Stanford-le-hope",
"region": "UKH32",
"postalCode": "SS17 9DY",
"countryName": "United Kingdom"
},
"contactPoint": {
"name": "Oluchi Nwaiwu",
"telephone": "+44 1375648441",
"email": "oluchi.nwaiwu@dpworld.com",
"url": "https://dpworld.tejari.com"
},
"roles": [
"buyer",
"reviewBody"
],
"details": {
"url": "https://dpworld.tejari.com",
"classifications": [
{
"scheme": "TED_CE_ACTIVITY",
"id": "PORT_RELATED_ACTIVITIES",
"description": "Port-related activities"
}
]
},
"additionalContactPoints": [
{
"email": "oluchi.nwaiwu@dpworld.com"
}
]
}
],
"buyer": {
"id": "GB-FTS-13225",
"name": "London Gateway Port Limited"
},
"language": "en"
}