Planning

Additional Water Process Development

UNITED UTILITIES WATER LIMITED

This public procurement record has 1 release in its history.

Planning

22 Aug 2022 at 13:12

Summary of the contracting process

The United Utilities Water Limited is planning a procurement process for the development of additional water processes. The tender titled "Additional Water Process Development" falls under the water distribution industry category. The procurement is at the planning stage, with a closing date set for the 5th of September 2022 at 15:00. The process involves sourcing an additional 357.4 litres/second of raw water from the River Dee to meet demand for two local process developments.

This procurement opportunity by United Utilities Water Limited offers business growth prospects for companies specializing in water distribution services. Businesses capable of supplying new raw water connections to meet the specified demands are well-suited to compete. The procurement method initiated is a tender, providing opportunities for service providers to engage in delivering water transport and distribution services in the North West of England, particularly in supporting local process developments with specific water flow requirements.

Find more tenders on our Open Data Platform.
How relevant is this notice?

D3 Tenders Premium

Win More Public Sector Contracts

AI-powered tender discovery, pipeline management, and market intelligence — everything you need to grow your public sector business.

Notice Title

Additional Water Process Development

Notice Description

United Utilities have been requested to supply an additional 357.4l/s from their Raw Water feed from the River Dee. Hence, we are looking for any new Raw water connections to cover this request. The additional Raw Water demand is to feed 2 separate process developments in the local area. The first connection will require a maximum flow of 200l/s to the inlet of a tank which will be required to be continuously refilled. The second connection will require a maximum flow of 157.4l/s to the inlet of a tank, and will also require a continuous refill.

Lot Information

Lot 1

United Utilities have been requested to supply an additional 357.4l/s from their Raw Water feed from the River Dee. Hence, we are looking for any new Raw water connections to cover this request. The additional Raw Water demand is to feed 2 separate process developments in the local area. The first connection will require a maximum flow of 200l/s to the inlet of a tank which will be required to be continuously refilled. The second connection will require a maximum flow of 157.4l/s to the inlet of a tank, and will also require a continuous refill. Further to this, the detail of the water requirement is, listed with geographical location of where the water requirement is located. * Ellesmere Port. For this, water usage will be required by the 1.1.2026. * Ellesmere Port. This is a phased development with the initial 100 l/s allocated to Phase 2. This has an outline programme of 5 years for full occupation and it is anticipated that 75% of the plots will occupied by year 3 (2025). By simple pro rata the development would require 75 l/s by 2025 and 100 l/s by 2027. Phase 3 requires an additional 100 l/s. Initial occupation unlikely until after 2027 and then probably a further 5 years from then to full occupation. Additional information: 1. If you cannot fulfil the full % of demand requested, could you please provide the % of demand that you can fulfil? 2. If supply is via alternative does that mean a new pipe or is the water still fed into the UU network which developers then draw demand off? 3. What would be the process for securing capacity with an alternative supplier?

Publication & Lifecycle

Open Contracting ID
ocds-h6vhtk-036193
Publication Source
Find A Tender Service
Latest Notice
https://www.find-tender.service.gov.uk/Notice/023305-2022
Current Stage
Planning
All Stages
Planning

Procurement Classification

Notice Type
Planning Notice
Procurement Type
Standard
Procurement Category
Services
Procurement Method
Not Specified
Procurement Method Details
Not specified
Tender Suitability
Not specified
Awardee Scale
Not specified

Common Procurement Vocabulary (CPV)

CPV Divisions

60 - Transport services (excl. Waste transport)

65 - Public utilities


CPV Codes

60600000 - Water transport services

65100000 - Water distribution and related services

65110000 - Water distribution

Notice Value(s)

Tender Value
Not specified
Lots Value
Not specified
Awards Value
Not specified
Contracts Value
Not specified

Notice Dates

Publication Date
22 Aug 20223 years ago
Submission Deadline
Not specified
Future Notice Date
9 Jan 2023Expired
Award Date
Not specified
Contract Period
Not specified - Not specified
Recurrence
Not specified

Notice Status

Tender Status
Planned
Lots Status
Planned
Awards Status
Not Specified
Contracts Status
Not Specified

Contracting Authority (Buyer)

Main Buyer
UNITED UTILITIES WATER LIMITED
Contact Name
Amelia Whewell
Contact Email
amelia.whewell@uuplc.co.uk
Contact Phone
+44 01925678021

Buyer Location

Locality
WARRINGTON
Postcode
WA5 3LP
Post Town
Warrington
Country
England

Major Region (ITL 1)
TLD North West (England)
Basic Region (ITL 2)
TLD6 Cheshire
Small Region (ITL 3)
TLD61 Warrington
Delivery Location
TLD North West (England)

Local Authority
Warrington
Electoral Ward
Great Sankey North and Whittle Hall
Westminster Constituency
Warrington South

Open Contracting Data Standard (OCDS)

View full OCDS Record for this contracting process

Download

The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.

{
    "tag": [
        "compiled"
    ],
    "id": "ocds-h6vhtk-036193-2022-08-22T14:12:03+01:00",
    "date": "2022-08-22T14:12:03+01:00",
    "ocid": "ocds-h6vhtk-036193",
    "description": "If you have experience in this area please could you provide at a minimum the following information and submit to the United Utilities Sourcing Excellence Team mailbox: Sourcingexcellence@uuplc.co.uk 1. If you cannot fulfil the full % of demand requested, could you please provide the % of demand that you can fulfil. 2. If supply is via alternative does that mean a new pipe or is the water still fed into the UU network which developers then draw demand off? 3. What would be the process for securing capacity with an alternative supplier? * Company Name * Contact details, including location telephone and e-mail address, main point of contact and position in Company The closing date for this PIN is the 5th September at 15.00",
    "initiationType": "tender",
    "tender": {
        "id": "BAF002",
        "legalBasis": {
            "id": "32014L0025",
            "scheme": "CELEX"
        },
        "title": "Additional Water Process Development",
        "status": "planned",
        "classification": {
            "scheme": "CPV",
            "id": "65110000",
            "description": "Water distribution"
        },
        "mainProcurementCategory": "services",
        "description": "United Utilities have been requested to supply an additional 357.4l/s from their Raw Water feed from the River Dee. Hence, we are looking for any new Raw water connections to cover this request. The additional Raw Water demand is to feed 2 separate process developments in the local area. The first connection will require a maximum flow of 200l/s to the inlet of a tank which will be required to be continuously refilled. The second connection will require a maximum flow of 157.4l/s to the inlet of a tank, and will also require a continuous refill.",
        "lots": [
            {
                "id": "1",
                "description": "United Utilities have been requested to supply an additional 357.4l/s from their Raw Water feed from the River Dee. Hence, we are looking for any new Raw water connections to cover this request. The additional Raw Water demand is to feed 2 separate process developments in the local area. The first connection will require a maximum flow of 200l/s to the inlet of a tank which will be required to be continuously refilled. The second connection will require a maximum flow of 157.4l/s to the inlet of a tank, and will also require a continuous refill. Further to this, the detail of the water requirement is, listed with geographical location of where the water requirement is located. * Ellesmere Port. For this, water usage will be required by the 1.1.2026. * Ellesmere Port. This is a phased development with the initial 100 l/s allocated to Phase 2. This has an outline programme of 5 years for full occupation and it is anticipated that 75% of the plots will occupied by year 3 (2025). By simple pro rata the development would require 75 l/s by 2025 and 100 l/s by 2027. Phase 3 requires an additional 100 l/s. Initial occupation unlikely until after 2027 and then probably a further 5 years from then to full occupation. Additional information: 1. If you cannot fulfil the full % of demand requested, could you please provide the % of demand that you can fulfil? 2. If supply is via alternative does that mean a new pipe or is the water still fed into the UU network which developers then draw demand off? 3. What would be the process for securing capacity with an alternative supplier?",
                "status": "planned"
            }
        ],
        "items": [
            {
                "id": "1",
                "additionalClassifications": [
                    {
                        "scheme": "CPV",
                        "id": "60600000",
                        "description": "Water transport services"
                    },
                    {
                        "scheme": "CPV",
                        "id": "65100000",
                        "description": "Water distribution and related services"
                    }
                ],
                "deliveryAddresses": [
                    {
                        "region": "UKD"
                    }
                ],
                "deliveryLocation": {
                    "description": "North West of England"
                },
                "relatedLot": "1"
            }
        ],
        "communication": {
            "futureNoticeDate": "2023-01-09T00:00:00Z"
        }
    },
    "parties": [
        {
            "id": "GB-FTS-4736",
            "name": "United Utilities Water Limited",
            "identifier": {
                "legalName": "United Utilities Water Limited",
                "id": "02366678"
            },
            "address": {
                "streetAddress": "Lingley Mere Business Park",
                "locality": "Warrington",
                "region": "UKD",
                "postalCode": "WA5 3LP",
                "countryName": "United Kingdom"
            },
            "contactPoint": {
                "name": "Amelia Whewell",
                "telephone": "+44 01925678021",
                "email": "Amelia.Whewell@uuplc.co.uk"
            },
            "roles": [
                "buyer"
            ],
            "details": {
                "url": "http://www.unitedutilities.com",
                "buyerProfile": "https://uk.eu-supply.com/ctm/Company/CompanyInformation/Index/43984",
                "classifications": [
                    {
                        "scheme": "TED_CE_ACTIVITY",
                        "id": "WATER",
                        "description": "Water"
                    }
                ]
            }
        }
    ],
    "buyer": {
        "id": "GB-FTS-4736",
        "name": "United Utilities Water Limited"
    },
    "language": "en"
}