Notice Information
Notice Title
Harrow Campus Masterplan Consultancy
Notice Description
Consultancy support on the Harrow Campus Masterplan Project. The University of Westminster Harrow Campus is part of the wider Northwick Park Masterplan, for which there are 4 landowners that collectively own the land. The information about the One Public Estate masterplan (OPE) is included as an appendix to the scope document. The OPE masterplan has an outline planning permission, and the planning strategy is to apply for approval of reserve matters .The application should be submitted within 3 years of the outline permission therefore no later than January 2026. The consultants will be for all phases and all buildings , but the team will be appointed initially for RIBA stage 1 for all buildings. Then the appointment will be initially for the buildings included in reserve matters first application. Full scope details can be found in Harrow Campus Masterplan Scope for Design Team.
Lot Information
Harrow Campus Masterplan Consultancy - Architect
Architect Consultancy support on the Harrow Campus Masterplan Project. The University of Westminster Harrow Campus is part of the wider Northwick Park Masterplan, for which there are 4 landowners that collectively own the land. The information about the One Public Estate masterplan (OPE) is included as an appendix to the scope document. The OPE masterplan has an outline planning permission, and the planning strategy is to apply for approval of reserve matters .The application should be submitted within 3 years of the outline permission therefore no later than January 2026. The consultants will be for all phases and all buildings , but the team will be appointed initially for RIBA stage 1 for all buildings. Then the appointment will be initially for the buildings included in reserve matters first application. Full scope details can be found in Harrow Campus Masterplan Scope for Design Team.
Harrow Campus Masterplan Consultancy - Planning ConsultantPlanning Consultancy support on the Harrow Campus Masterplan Project. The University of Westminster Harrow Campus is part of the wider Northwick Park Masterplan, for which there are 4 landowners that collectively own the land. The information about the One Public Estate masterplan (OPE) is included as an appendix to the scope document. The OPE masterplan has an outline planning permission, and the planning strategy is to apply for approval of reserve matters .The application should be submitted within 3 years of the outline permission therefore no later than January 2026. The consultants will be for all phases and all buildings , but the team will be appointed initially for RIBA stage 1 for all buildings. Then the appointment will be initially for the buildings included in reserve matters first application. Full scope details can be found in Harrow Campus Masterplan Scope for Design Team.
Harrow Campus Masterplan Consultancy - Services (M&E)Services (M&E) Consultancy support on the Harrow Campus Masterplan Project. The University of Westminster Harrow Campus is part of the wider Northwick Park Masterplan, for which there are 4 landowners that collectively own the land. The information about the One Public Estate masterplan (OPE) is included as an appendix to the scope document. The OPE masterplan has an outline planning permission, and the planning strategy is to apply for approval of reserve matters .The application should be submitted within 3 years of the outline permission therefore no later than January 2026. The consultants will be for all phases and all buildings , but the team will be appointed initially for RIBA stage 1 for all buildings. Then the appointment will be initially for the buildings included in reserve matters first application. Full scope details can be found in Harrow Campus Masterplan Scope for Design Team.
Harrow Campus Masterplan Consultancy - Civil EngineerCivil Engineer Consultancy support on the Harrow Campus Masterplan Project. The University of Westminster Harrow Campus is part of the wider Northwick Park Masterplan, for which there are 4 landowners that collectively own the land. The information about the One Public Estate masterplan (OPE) is included as an appendix to the scope document. The OPE masterplan has an outline planning permission, and the planning strategy is to apply for approval of reserve matters .The application should be submitted within 3 years of the outline permission therefore no later than January 2026. The consultants will be for all phases and all buildings , but the team will be appointed initially for RIBA stage 1 for all buildings. Then the appointment will be initially for the buildings included in reserve matters first application. Full scope details can be found in Harrow Campus Masterplan Scope for Design Team.
Harrow Campus Masterplan Consultancy - Fire ConsultantFire Consultancy support on the Harrow Campus Masterplan Project. The University of Westminster Harrow Campus is part of the wider Northwick Park Masterplan, for which there are 4 landowners that collectively own the land. The information about the One Public Estate masterplan (OPE) is included as an appendix to the scope document. The OPE masterplan has an outline planning permission, and the planning strategy is to apply for approval of reserve matters .The application should be submitted within 3 years of the outline permission therefore no later than January 2026. The consultants will be for all phases and all buildings , but the team will be appointed initially for RIBA stage 1 for all buildings. Then the appointment will be initially for the buildings included in reserve matters first application. Full scope details can be found in Harrow Campus Masterplan Scope for Design Team.
Harrow Campus Masterplan Consultancy - Project ManagerProject Manager support on the Harrow Campus Masterplan Project. The University of Westminster Harrow Campus is part of the wider Northwick Park Masterplan, for which there are 4 landowners that collectively own the land. The information about the One Public Estate masterplan (OPE) is included as an appendix to the scope document. The OPE masterplan has an outline planning permission, and the planning strategy is to apply for approval of reserve matters .The application should be submitted within 3 years of the outline permission therefore no later than January 2026. The consultants will be for all phases and all buildings , but the team will be appointed initially for RIBA stage 1 for all buildings. Then the appointment will be initially for the buildings included in reserve matters first application. Full scope details can be found in Harrow Campus Masterplan Scope for Design Team.
Harrow Campus Masterplan Consultancy - Cost ManagerCost Manager support on the Harrow Campus Masterplan Project. The University of Westminster Harrow Campus is part of the wider Northwick Park Masterplan, for which there are 4 landowners that collectively own the land. The information about the One Public Estate masterplan (OPE) is included as an appendix to the scope document. The OPE masterplan has an outline planning permission, and the planning strategy is to apply for approval of reserve matters .The application should be submitted within 3 years of the outline permission therefore no later than January 2026. The consultants will be for all phases and all buildings , but the team will be appointed initially for RIBA stage 1 for all buildings. Then the appointment will be initially for the buildings included in reserve matters first application. Full scope details can be found in Harrow Campus Masterplan Scope for Design Team.
Harrow Campus Masterplan Consultancy - Acoustics and BREEAMAcoustic and BREEAM Consultancy support on the Harrow Campus Masterplan Project. The University of Westminster Harrow Campus is part of the wider Northwick Park Masterplan, for which there are 4 landowners that collectively own the land. The information about the One Public Estate masterplan (OPE) is included as an appendix to the scope document. The OPE masterplan has an outline planning permission, and the planning strategy is to apply for approval of reserve matters .The application should be submitted within 3 years of the outline permission therefore no later than January 2026. The consultants will be for all phases and all buildings , but the team will be appointed initially for RIBA stage 1 for all buildings. Then the appointment will be initially for the buildings included in reserve matters first application. Full scope details can be found in Harrow Campus Masterplan Scope for Design Team.
AcousticianThe University is seeking a suitably experienced supplier/s to provide Consultancy support on the Harrow Campus Masterplan Project. The University of Westminster Harrow Campus is part of the wider Northwick Park Masterplan, for which there are 4 landowners that collectively own the land. The information about the One Public Estate masterplan (OPE) is included as an appendix to the scope document. The OPE masterplan has an outline planning permission, and the planning strategy is to apply for approval of reserve matters .The application should be submitted within 3 years of the outline permission therefore no later than January 2026. The tender for the consultants will be for all phases and all buildings , but the team will be appointed initially for RIBA stage 1 for all buildings. Then the appointment will be initially for the buildings included in reserve matters first application. Full scope details can be found in Harrow Campus Masterplan Scope for Design Team.
Principal designerThe University is seeking a suitably experienced supplier/s to provide Consultancy support on the Harrow Campus Masterplan Project. The University of Westminster Harrow Campus is part of the wider Northwick Park Masterplan, for which there are 4 landowners that collectively own the land. The information about the One Public Estate masterplan (OPE) is included as an appendix to the scope document. The OPE masterplan has an outline planning permission, and the planning strategy is to apply for approval of reserve matters .The application should be submitted within 3 years of the outline permission therefore no later than January 2026. The tender for the consultants will be for all phases and all buildings , but the team will be appointed initially for RIBA stage 1 for all buildings. Then the appointment will be initially for the buildings included in reserve matters first application. Full scope details can be found in Harrow Campus Masterplan Scope for Design Team.
Notice Details
Publication & Lifecycle
- Open Contracting ID
- ocds-h6vhtk-03a4b2
- Publication Source
- Find A Tender Service
- Latest Notice
- https://www.find-tender.service.gov.uk/Notice/027729-2024
- Current Stage
- Award
- All Stages
- Tender, Award
Procurement Classification
- Notice Type
- Tender Notice
- Procurement Type
- Standard
- Procurement Category
- Services
- Procurement Method
- Selective
- Procurement Method Details
- Restricted procedure
- Tender Suitability
- Not specified
- Awardee Scale
- Large
Common Procurement Vocabulary (CPV)
- CPV Divisions
71 - Architectural, construction, engineering and inspection services
-
- CPV Codes
71000000 - Architectural, construction, engineering and inspection services
71530000 - Construction consultancy services
Notice Value(s)
- Tender Value
- £15,000,000 £10M-£100M
- Lots Value
- £15,000,000 £10M-£100M
- Awards Value
- Not specified
- Contracts Value
- Not specified
Notice Dates
- Publication Date
- 30 Aug 20241 years ago
- Submission Deadline
- 13 Mar 2023Expired
- Future Notice Date
- Not specified
- Award Date
- 28 Aug 20232 years ago
- Contract Period
- 13 May 2023 - 31 Dec 2028 Over 5 years
- Recurrence
- Not specified
Notice Status
- Tender Status
- Complete
- Lots Status
- Active, Cancelled
- Awards Status
- Active
- Contracts Status
- Active
Buyer & Supplier
Contracting Authority (Buyer)
- Main Buyer
- THE UNIVERSITY OF WESTMINSTER
- Contact Name
- Steve Phelps
- Contact Email
- phelpss@westminster.ac.uk
- Contact Phone
- +44 7725138435
Buyer Location
- Locality
- LONDON
- Postcode
- W1B 2HW
- Post Town
- West London
- Country
- England
-
- Major Region (ITL 1)
- TLI London
- Basic Region (ITL 2)
- TLI3 Inner London - West
- Small Region (ITL 3)
- TLI35 Westminster and City of London
- Delivery Location
- TLI London
-
- Local Authority
- Westminster
- Electoral Ward
- West End
- Westminster Constituency
- Cities of London and Westminster
Further Information
Open Contracting Data Standard (OCDS)
View full OCDS Record for this contracting process
The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.
{
"tag": [
"compiled"
],
"id": "ocds-h6vhtk-03a4b2-2024-08-30T11:48:17+01:00",
"date": "2024-08-30T11:48:17+01:00",
"ocid": "ocds-h6vhtk-03a4b2",
"initiationType": "tender",
"tender": {
"id": "DN655895",
"legalBasis": {
"id": "32014L0024",
"scheme": "CELEX"
},
"title": "Harrow Campus Masterplan Consultancy",
"status": "complete",
"classification": {
"scheme": "CPV",
"id": "71530000",
"description": "Construction consultancy services"
},
"mainProcurementCategory": "services",
"description": "Consultancy support on the Harrow Campus Masterplan Project. The University of Westminster Harrow Campus is part of the wider Northwick Park Masterplan, for which there are 4 landowners that collectively own the land. The information about the One Public Estate masterplan (OPE) is included as an appendix to the scope document. The OPE masterplan has an outline planning permission, and the planning strategy is to apply for approval of reserve matters .The application should be submitted within 3 years of the outline permission therefore no later than January 2026. The consultants will be for all phases and all buildings , but the team will be appointed initially for RIBA stage 1 for all buildings. Then the appointment will be initially for the buildings included in reserve matters first application. Full scope details can be found in Harrow Campus Masterplan Scope for Design Team.",
"value": {
"amount": 15000000,
"currency": "GBP"
},
"lotDetails": {
"awardCriteriaDetails": "Lot Exclusions - In order to maintain independence of service, the University will not award any combination of the following lots to a single supplier: Lot 1: Architect, Lot 6: Project Manager, Lot 7: Cost Manager Suppliers may be selected for tender, if they successfully pass the SSQ stage for any lot. In this case, at tender evaluation the University will either: * Take the supplier preference into account, and/or * Award any conflicting lots to the closest 2nd place bidder"
},
"lots": [
{
"id": "1",
"title": "Harrow Campus Masterplan Consultancy - Architect",
"description": "Architect Consultancy support on the Harrow Campus Masterplan Project. The University of Westminster Harrow Campus is part of the wider Northwick Park Masterplan, for which there are 4 landowners that collectively own the land. The information about the One Public Estate masterplan (OPE) is included as an appendix to the scope document. The OPE masterplan has an outline planning permission, and the planning strategy is to apply for approval of reserve matters .The application should be submitted within 3 years of the outline permission therefore no later than January 2026. The consultants will be for all phases and all buildings , but the team will be appointed initially for RIBA stage 1 for all buildings. Then the appointment will be initially for the buildings included in reserve matters first application. Full scope details can be found in Harrow Campus Masterplan Scope for Design Team.",
"value": {
"amount": 15000000,
"currency": "GBP"
},
"contractPeriod": {
"startDate": "2023-05-15T00:00:00+01:00",
"endDate": "2028-12-31T23:59:59Z"
},
"hasRenewal": false,
"secondStage": {
"minimumCandidates": 4,
"maximumCandidates": 8
},
"submissionTerms": {
"variantPolicy": "notAllowed"
},
"hasOptions": false,
"status": "cancelled",
"awardCriteria": {
"criteria": [
{
"type": "price"
}
]
}
},
{
"id": "2",
"title": "Harrow Campus Masterplan Consultancy - Planning Consultant",
"description": "Planning Consultancy support on the Harrow Campus Masterplan Project. The University of Westminster Harrow Campus is part of the wider Northwick Park Masterplan, for which there are 4 landowners that collectively own the land. The information about the One Public Estate masterplan (OPE) is included as an appendix to the scope document. The OPE masterplan has an outline planning permission, and the planning strategy is to apply for approval of reserve matters .The application should be submitted within 3 years of the outline permission therefore no later than January 2026. The consultants will be for all phases and all buildings , but the team will be appointed initially for RIBA stage 1 for all buildings. Then the appointment will be initially for the buildings included in reserve matters first application. Full scope details can be found in Harrow Campus Masterplan Scope for Design Team.",
"value": {
"amount": 15000000,
"currency": "GBP"
},
"contractPeriod": {
"startDate": "2023-05-14T00:00:00+01:00",
"endDate": "2028-12-31T23:59:59Z"
},
"hasRenewal": false,
"secondStage": {
"minimumCandidates": 4,
"maximumCandidates": 8
},
"submissionTerms": {
"variantPolicy": "notAllowed"
},
"hasOptions": false,
"status": "cancelled",
"awardCriteria": {
"criteria": [
{
"type": "price"
}
]
}
},
{
"id": "3",
"title": "Harrow Campus Masterplan Consultancy - Services (M&E)",
"description": "Services (M&E) Consultancy support on the Harrow Campus Masterplan Project. The University of Westminster Harrow Campus is part of the wider Northwick Park Masterplan, for which there are 4 landowners that collectively own the land. The information about the One Public Estate masterplan (OPE) is included as an appendix to the scope document. The OPE masterplan has an outline planning permission, and the planning strategy is to apply for approval of reserve matters .The application should be submitted within 3 years of the outline permission therefore no later than January 2026. The consultants will be for all phases and all buildings , but the team will be appointed initially for RIBA stage 1 for all buildings. Then the appointment will be initially for the buildings included in reserve matters first application. Full scope details can be found in Harrow Campus Masterplan Scope for Design Team.",
"value": {
"amount": 15000000,
"currency": "GBP"
},
"contractPeriod": {
"startDate": "2023-05-14T00:00:00+01:00",
"endDate": "2028-12-31T23:59:59Z"
},
"hasRenewal": false,
"secondStage": {
"minimumCandidates": 4,
"maximumCandidates": 8
},
"submissionTerms": {
"variantPolicy": "notAllowed"
},
"hasOptions": false,
"status": "cancelled",
"awardCriteria": {
"criteria": [
{
"type": "price"
}
]
}
},
{
"id": "4",
"title": "Harrow Campus Masterplan Consultancy - Civil Engineer",
"description": "Civil Engineer Consultancy support on the Harrow Campus Masterplan Project. The University of Westminster Harrow Campus is part of the wider Northwick Park Masterplan, for which there are 4 landowners that collectively own the land. The information about the One Public Estate masterplan (OPE) is included as an appendix to the scope document. The OPE masterplan has an outline planning permission, and the planning strategy is to apply for approval of reserve matters .The application should be submitted within 3 years of the outline permission therefore no later than January 2026. The consultants will be for all phases and all buildings , but the team will be appointed initially for RIBA stage 1 for all buildings. Then the appointment will be initially for the buildings included in reserve matters first application. Full scope details can be found in Harrow Campus Masterplan Scope for Design Team.",
"value": {
"amount": 15000000,
"currency": "GBP"
},
"contractPeriod": {
"startDate": "2023-05-14T00:00:00+01:00",
"endDate": "2028-12-31T23:59:59Z"
},
"hasRenewal": false,
"secondStage": {
"minimumCandidates": 4,
"maximumCandidates": 8
},
"submissionTerms": {
"variantPolicy": "notAllowed"
},
"hasOptions": false,
"status": "cancelled",
"awardCriteria": {
"criteria": [
{
"type": "price"
}
]
}
},
{
"id": "5",
"title": "Harrow Campus Masterplan Consultancy - Fire Consultant",
"description": "Fire Consultancy support on the Harrow Campus Masterplan Project. The University of Westminster Harrow Campus is part of the wider Northwick Park Masterplan, for which there are 4 landowners that collectively own the land. The information about the One Public Estate masterplan (OPE) is included as an appendix to the scope document. The OPE masterplan has an outline planning permission, and the planning strategy is to apply for approval of reserve matters .The application should be submitted within 3 years of the outline permission therefore no later than January 2026. The consultants will be for all phases and all buildings , but the team will be appointed initially for RIBA stage 1 for all buildings. Then the appointment will be initially for the buildings included in reserve matters first application. Full scope details can be found in Harrow Campus Masterplan Scope for Design Team.",
"value": {
"amount": 15000000,
"currency": "GBP"
},
"contractPeriod": {
"startDate": "2023-05-14T00:00:00+01:00",
"endDate": "2028-12-31T23:59:59Z"
},
"hasRenewal": false,
"secondStage": {
"minimumCandidates": 4,
"maximumCandidates": 8
},
"submissionTerms": {
"variantPolicy": "notAllowed"
},
"hasOptions": false,
"status": "cancelled",
"awardCriteria": {
"criteria": [
{
"type": "price"
}
]
}
},
{
"id": "6",
"title": "Harrow Campus Masterplan Consultancy - Project Manager",
"description": "Project Manager support on the Harrow Campus Masterplan Project. The University of Westminster Harrow Campus is part of the wider Northwick Park Masterplan, for which there are 4 landowners that collectively own the land. The information about the One Public Estate masterplan (OPE) is included as an appendix to the scope document. The OPE masterplan has an outline planning permission, and the planning strategy is to apply for approval of reserve matters .The application should be submitted within 3 years of the outline permission therefore no later than January 2026. The consultants will be for all phases and all buildings , but the team will be appointed initially for RIBA stage 1 for all buildings. Then the appointment will be initially for the buildings included in reserve matters first application. Full scope details can be found in Harrow Campus Masterplan Scope for Design Team.",
"value": {
"amount": 15000000,
"currency": "GBP"
},
"contractPeriod": {
"startDate": "2023-05-14T00:00:00+01:00",
"endDate": "2028-12-31T23:59:59Z"
},
"hasRenewal": false,
"secondStage": {
"minimumCandidates": 4,
"maximumCandidates": 8
},
"submissionTerms": {
"variantPolicy": "notAllowed"
},
"hasOptions": false,
"status": "cancelled",
"awardCriteria": {
"criteria": [
{
"type": "price"
}
]
}
},
{
"id": "7",
"title": "Harrow Campus Masterplan Consultancy - Cost Manager",
"description": "Cost Manager support on the Harrow Campus Masterplan Project. The University of Westminster Harrow Campus is part of the wider Northwick Park Masterplan, for which there are 4 landowners that collectively own the land. The information about the One Public Estate masterplan (OPE) is included as an appendix to the scope document. The OPE masterplan has an outline planning permission, and the planning strategy is to apply for approval of reserve matters .The application should be submitted within 3 years of the outline permission therefore no later than January 2026. The consultants will be for all phases and all buildings , but the team will be appointed initially for RIBA stage 1 for all buildings. Then the appointment will be initially for the buildings included in reserve matters first application. Full scope details can be found in Harrow Campus Masterplan Scope for Design Team.",
"value": {
"amount": 15000000,
"currency": "GBP"
},
"contractPeriod": {
"startDate": "2023-05-14T00:00:00+01:00",
"endDate": "2028-12-31T23:59:59Z"
},
"hasRenewal": false,
"secondStage": {
"minimumCandidates": 4,
"maximumCandidates": 8
},
"submissionTerms": {
"variantPolicy": "notAllowed"
},
"hasOptions": false,
"status": "cancelled",
"awardCriteria": {
"criteria": [
{
"type": "price"
}
]
}
},
{
"id": "8",
"title": "Harrow Campus Masterplan Consultancy - Acoustics and BREEAM",
"description": "Acoustic and BREEAM Consultancy support on the Harrow Campus Masterplan Project. The University of Westminster Harrow Campus is part of the wider Northwick Park Masterplan, for which there are 4 landowners that collectively own the land. The information about the One Public Estate masterplan (OPE) is included as an appendix to the scope document. The OPE masterplan has an outline planning permission, and the planning strategy is to apply for approval of reserve matters .The application should be submitted within 3 years of the outline permission therefore no later than January 2026. The consultants will be for all phases and all buildings , but the team will be appointed initially for RIBA stage 1 for all buildings. Then the appointment will be initially for the buildings included in reserve matters first application. Full scope details can be found in Harrow Campus Masterplan Scope for Design Team.",
"value": {
"amount": 15000000,
"currency": "GBP"
},
"contractPeriod": {
"startDate": "2023-05-14T00:00:00+01:00",
"endDate": "2028-12-31T23:59:59Z"
},
"hasRenewal": false,
"secondStage": {
"minimumCandidates": 4,
"maximumCandidates": 8
},
"submissionTerms": {
"variantPolicy": "notAllowed"
},
"hasOptions": false,
"status": "cancelled",
"awardCriteria": {
"criteria": [
{
"type": "price"
}
]
}
},
{
"id": "9",
"title": "Acoustician",
"description": "The University is seeking a suitably experienced supplier/s to provide Consultancy support on the Harrow Campus Masterplan Project. The University of Westminster Harrow Campus is part of the wider Northwick Park Masterplan, for which there are 4 landowners that collectively own the land. The information about the One Public Estate masterplan (OPE) is included as an appendix to the scope document. The OPE masterplan has an outline planning permission, and the planning strategy is to apply for approval of reserve matters .The application should be submitted within 3 years of the outline permission therefore no later than January 2026. The tender for the consultants will be for all phases and all buildings , but the team will be appointed initially for RIBA stage 1 for all buildings. Then the appointment will be initially for the buildings included in reserve matters first application. Full scope details can be found in Harrow Campus Masterplan Scope for Design Team.",
"value": {
"amount": 15000000,
"currency": "GBP"
},
"contractPeriod": {
"startDate": "2023-05-14T00:00:00+01:00",
"endDate": "2028-12-31T23:59:59Z"
},
"hasRenewal": false,
"secondStage": {
"minimumCandidates": 4,
"maximumCandidates": 8
},
"submissionTerms": {
"variantPolicy": "notAllowed"
},
"hasOptions": false,
"status": "active"
},
{
"id": "10",
"title": "Principal designer",
"description": "The University is seeking a suitably experienced supplier/s to provide Consultancy support on the Harrow Campus Masterplan Project. The University of Westminster Harrow Campus is part of the wider Northwick Park Masterplan, for which there are 4 landowners that collectively own the land. The information about the One Public Estate masterplan (OPE) is included as an appendix to the scope document. The OPE masterplan has an outline planning permission, and the planning strategy is to apply for approval of reserve matters .The application should be submitted within 3 years of the outline permission therefore no later than January 2026. The tender for the consultants will be for all phases and all buildings , but the team will be appointed initially for RIBA stage 1 for all buildings. Then the appointment will be initially for the buildings included in reserve matters first application. Full scope details can be found in Harrow Campus Masterplan Scope for Design Team.",
"value": {
"amount": 15000000,
"currency": "GBP"
},
"contractPeriod": {
"startDate": "2023-05-14T00:00:00+01:00",
"endDate": "2028-12-31T23:59:59Z"
},
"hasRenewal": false,
"secondStage": {
"minimumCandidates": 4,
"maximumCandidates": 8
},
"submissionTerms": {
"variantPolicy": "notAllowed"
},
"hasOptions": false,
"status": "active"
}
],
"items": [
{
"id": "1",
"additionalClassifications": [
{
"scheme": "CPV",
"id": "71530000",
"description": "Construction consultancy services"
}
],
"deliveryAddresses": [
{
"region": "UKI"
},
{
"region": "UKI"
}
],
"deliveryLocation": {
"description": "Harrow"
},
"relatedLot": "1"
},
{
"id": "2",
"additionalClassifications": [
{
"scheme": "CPV",
"id": "71530000",
"description": "Construction consultancy services"
}
],
"deliveryAddresses": [
{
"region": "UKI"
},
{
"region": "UKI"
}
],
"deliveryLocation": {
"description": "Harrow"
},
"relatedLot": "2"
},
{
"id": "3",
"additionalClassifications": [
{
"scheme": "CPV",
"id": "71530000",
"description": "Construction consultancy services"
}
],
"deliveryAddresses": [
{
"region": "UKI"
},
{
"region": "UKI"
}
],
"deliveryLocation": {
"description": "Harrow"
},
"relatedLot": "3"
},
{
"id": "4",
"additionalClassifications": [
{
"scheme": "CPV",
"id": "71530000",
"description": "Construction consultancy services"
}
],
"deliveryAddresses": [
{
"region": "UKI"
},
{
"region": "UKI"
}
],
"deliveryLocation": {
"description": "Harrow"
},
"relatedLot": "4"
},
{
"id": "5",
"additionalClassifications": [
{
"scheme": "CPV",
"id": "71530000",
"description": "Construction consultancy services"
}
],
"deliveryAddresses": [
{
"region": "UKI"
},
{
"region": "UKI"
}
],
"deliveryLocation": {
"description": "Harrow"
},
"relatedLot": "5"
},
{
"id": "6",
"additionalClassifications": [
{
"scheme": "CPV",
"id": "71530000",
"description": "Construction consultancy services"
}
],
"deliveryAddresses": [
{
"region": "UKI"
},
{
"region": "UKI"
}
],
"deliveryLocation": {
"description": "Harrow"
},
"relatedLot": "6"
},
{
"id": "7",
"additionalClassifications": [
{
"scheme": "CPV",
"id": "71530000",
"description": "Construction consultancy services"
}
],
"deliveryAddresses": [
{
"region": "UKI"
},
{
"region": "UKI"
}
],
"deliveryLocation": {
"description": "Harrow"
},
"relatedLot": "7"
},
{
"id": "8",
"additionalClassifications": [
{
"scheme": "CPV",
"id": "71530000",
"description": "Construction consultancy services"
}
],
"deliveryAddresses": [
{
"region": "UKI"
},
{
"region": "UKI"
}
],
"deliveryLocation": {
"description": "Harrow"
},
"relatedLot": "8"
},
{
"id": "9",
"additionalClassifications": [
{
"scheme": "CPV",
"id": "71000000",
"description": "Architectural, construction, engineering and inspection services"
}
],
"deliveryAddresses": [
{
"region": "UKI"
}
],
"deliveryLocation": {
"description": "Harrow"
},
"relatedLot": "9"
},
{
"id": "10",
"additionalClassifications": [
{
"scheme": "CPV",
"id": "71000000",
"description": "Architectural, construction, engineering and inspection services"
}
],
"deliveryAddresses": [
{
"region": "UKI"
}
],
"deliveryLocation": {
"description": "Harrow"
},
"relatedLot": "10"
}
],
"participationFees": [
{
"id": "1",
"type": [
"document"
]
}
],
"submissionMethod": [
"electronicSubmission"
],
"submissionMethodDetails": "https://procontract.due-north.com",
"documents": [
{
"id": "economic",
"documentType": "economicSelectionCriteria"
},
{
"id": "technical",
"documentType": "technicalSelectionCriteria"
}
],
"procurementMethod": "selective",
"procurementMethodDetails": "Restricted procedure",
"tenderPeriod": {
"endDate": "2023-03-13T11:00:00Z"
},
"secondStage": {
"invitationDate": "2023-03-16T00:00:00Z"
},
"submissionTerms": {
"languages": [
"en"
]
},
"hasRecurrence": false,
"contractTerms": {
"electronicInvoicingPolicy": "allowed"
},
"coveredBy": [
"GPA"
]
},
"parties": [
{
"id": "GB-FTS-14980",
"name": "THE UNIVERSITY OF WESTMINSTER",
"identifier": {
"legalName": "THE UNIVERSITY OF WESTMINSTER",
"noIdentifierRationale": "notOnAnyRegister"
},
"address": {
"streetAddress": "309 Regent Street",
"locality": "LONDON",
"region": "UKI32",
"postalCode": "W1B2HW",
"countryName": "United Kingdom"
},
"contactPoint": {
"name": "Steve Phelps",
"telephone": "+44 7725138435",
"email": "phelpss@westminster.ac.uk",
"url": "https://procontract.due-north.com"
},
"roles": [
"buyer"
],
"details": {
"url": "https://www.westminster.ac.uk",
"buyerProfile": "https://procontract.due-north.com",
"classifications": [
{
"scheme": "TED_CA_TYPE",
"id": "BODY_PUBLIC",
"description": "Body governed by public law"
},
{
"scheme": "COFOG",
"id": "09",
"description": "Education"
}
]
}
},
{
"id": "GB-FTS-29332",
"name": "University of Westminster",
"identifier": {
"legalName": "University of Westminster"
},
"address": {
"locality": "London",
"countryName": "United Kingdom"
},
"roles": [
"reviewBody"
]
},
{
"id": "GB-COH-00977818",
"name": "THE UNIVERSITY OF WESTMINSTER",
"identifier": {
"legalName": "THE UNIVERSITY OF WESTMINSTER",
"id": "00977818",
"scheme": "GB-COH"
},
"address": {
"streetAddress": "309 Regent Street",
"locality": "LONDON",
"region": "UKI32",
"countryName": "United Kingdom"
},
"contactPoint": {
"name": "Steve Phelps",
"telephone": "+44 7725138435",
"email": "phelpss@westminster.ac.uk"
},
"roles": [
"buyer"
],
"details": {
"url": "https://www.westminster.ac.uk/",
"classifications": [
{
"scheme": "TED_CA_TYPE",
"id": "BODY_PUBLIC",
"description": "Body governed by public law"
},
{
"scheme": "COFOG",
"id": "09",
"description": "Education"
}
]
}
},
{
"id": "GB-COH-OC431021",
"name": "PRP Architecture LLP",
"identifier": {
"legalName": "PRP Architecture LLP",
"id": "OC431021",
"scheme": "GB-COH"
},
"address": {
"locality": "Thames Ditton",
"region": "UK",
"countryName": "United Kingdom"
},
"roles": [
"supplier"
],
"details": {
"scale": "large"
}
},
{
"id": "GB-COH-OC423461",
"name": "Sphere25",
"identifier": {
"legalName": "Sphere25",
"id": "OC423461",
"scheme": "GB-COH"
},
"address": {
"locality": "Brentwood",
"region": "UK",
"countryName": "United Kingdom"
},
"roles": [
"supplier"
],
"details": {
"scale": "large"
}
},
{
"id": "GB-FTS-123032",
"name": "Troup Bywaters + Anders",
"identifier": {
"legalName": "Troup Bywaters + Anders",
"id": "N/A",
"schemeEntered": "Partnership"
},
"address": {
"locality": "London",
"region": "UK",
"countryName": "United Kingdom"
},
"roles": [
"supplier"
],
"details": {
"scale": "large"
}
},
{
"id": "GB-COH-OC300082",
"name": "Campbell Reith Hill LLP",
"identifier": {
"legalName": "Campbell Reith Hill LLP",
"id": "OC300082",
"scheme": "GB-COH"
},
"address": {
"locality": "London",
"region": "UK",
"countryName": "United Kingdom"
},
"roles": [
"supplier"
],
"details": {
"scale": "large"
}
},
{
"id": "GB-COH-2049511",
"name": "Buro Happold",
"identifier": {
"legalName": "Buro Happold",
"id": "2049511",
"scheme": "GB-COH"
},
"address": {
"locality": "Bath",
"region": "UK",
"countryName": "United Kingdom"
},
"roles": [
"supplier"
],
"details": {
"scale": "large"
}
},
{
"id": "GB-COH-2165592",
"name": "Turner & Townsend",
"identifier": {
"legalName": "Turner & Townsend",
"id": "2165592",
"scheme": "GB-COH"
},
"address": {
"locality": "Leeds",
"region": "UK",
"countryName": "United Kingdom"
},
"roles": [
"supplier"
],
"details": {
"scale": "large"
}
},
{
"id": "GB-COH-9049470",
"name": "Exigere LLP",
"identifier": {
"legalName": "Exigere LLP",
"id": "9049470",
"scheme": "GB-COH"
},
"address": {
"locality": "London",
"region": "UK",
"countryName": "United Kingdom"
},
"roles": [
"supplier"
],
"details": {
"scale": "large"
}
},
{
"id": "GB-COH-OC407254",
"name": "Hoare Lea",
"identifier": {
"legalName": "Hoare Lea",
"id": "OC407254",
"scheme": "GB-COH"
},
"address": {
"locality": "Bristol",
"region": "UK",
"countryName": "United Kingdom"
},
"roles": [
"supplier"
],
"details": {
"scale": "large"
}
}
],
"buyer": {
"id": "GB-COH-00977818",
"name": "THE UNIVERSITY OF WESTMINSTER"
},
"language": "en",
"awards": [
{
"id": "027729-2024-1",
"status": "active",
"suppliers": [
{
"id": "GB-COH-OC431021",
"name": "PRP Architecture LLP"
},
{
"id": "GB-COH-OC423461",
"name": "Sphere25"
},
{
"id": "GB-FTS-123032",
"name": "Troup Bywaters + Anders"
},
{
"id": "GB-COH-OC300082",
"name": "Campbell Reith Hill LLP"
},
{
"id": "GB-COH-2049511",
"name": "Buro Happold"
},
{
"id": "GB-COH-2165592",
"name": "Turner & Townsend"
},
{
"id": "GB-COH-9049470",
"name": "Exigere LLP"
},
{
"id": "GB-COH-OC407254",
"name": "Hoare Lea"
}
]
}
],
"contracts": [
{
"id": "027729-2024-1",
"awardID": "027729-2024-1",
"status": "active",
"dateSigned": "2023-08-29T00:00:00+01:00"
}
],
"bids": {
"statistics": [
{
"id": "5",
"measure": "bids",
"value": 45
},
{
"id": "3",
"measure": "lowestValidBidValue",
"value": 100000,
"currency": "GBP"
},
{
"id": "4",
"measure": "highestValidBidValue",
"value": 2000000,
"currency": "GBP"
},
{
"id": "1",
"measure": "lowestValidBidValue",
"value": 100000,
"currency": "GBP"
},
{
"id": "2",
"measure": "highestValidBidValue",
"value": 2000000,
"currency": "GBP"
}
]
}
}