Award

Harrow Campus Masterplan Consultancy

THE UNIVERSITY OF WESTMINSTER

This public procurement record has 2 releases in its history.

Award

30 Aug 2024 at 10:48

Tender

10 Feb 2023 at 13:16

Summary of the contracting process

The University of Westminster is currently in the award stage for a comprehensive procurement process titled "Harrow Campus Masterplan Consultancy." This project falls under the industry category of construction consultancy services and is part of the broader Northwick Park Masterplan. The procurement involves the expertise of multiple consultants for various phases and buildings at the Harrow Campus, located in the UKI region. Key deadlines include submitting planning applications by January 2026. The university utilised a restricted procedure for selecting suppliers, and significant stages included the tender period ending on 13th March 2023 and contracts being signed on 29th August 2023.

This procurement offers significant opportunities for businesses specialising in construction consultancy to collaborate with a reputable educational institution. Large companies capable of providing architectural, engineering, and project management services are well-suited to compete in this tender. The framework also includes roles like civil engineers, cost managers, and BREEAM consultants, offering a diverse range of opportunities for multidisciplinary firms. Successfully participating in this project could not only ensure business growth but also foster long-term collaboration with the University of Westminster.

Find more tenders on our Open Data Platform.
How relevant is this notice?

D3 Tenders Premium

Win More Public Sector Contracts

AI-powered tender discovery, pipeline management, and market intelligence — everything you need to grow your public sector business.

Notice Title

Harrow Campus Masterplan Consultancy

Notice Description

Consultancy support on the Harrow Campus Masterplan Project. The University of Westminster Harrow Campus is part of the wider Northwick Park Masterplan, for which there are 4 landowners that collectively own the land. The information about the One Public Estate masterplan (OPE) is included as an appendix to the scope document. The OPE masterplan has an outline planning permission, and the planning strategy is to apply for approval of reserve matters .The application should be submitted within 3 years of the outline permission therefore no later than January 2026. The consultants will be for all phases and all buildings , but the team will be appointed initially for RIBA stage 1 for all buildings. Then the appointment will be initially for the buildings included in reserve matters first application. Full scope details can be found in Harrow Campus Masterplan Scope for Design Team.

Lot Information

Harrow Campus Masterplan Consultancy - Architect

Architect Consultancy support on the Harrow Campus Masterplan Project. The University of Westminster Harrow Campus is part of the wider Northwick Park Masterplan, for which there are 4 landowners that collectively own the land. The information about the One Public Estate masterplan (OPE) is included as an appendix to the scope document. The OPE masterplan has an outline planning permission, and the planning strategy is to apply for approval of reserve matters .The application should be submitted within 3 years of the outline permission therefore no later than January 2026. The consultants will be for all phases and all buildings , but the team will be appointed initially for RIBA stage 1 for all buildings. Then the appointment will be initially for the buildings included in reserve matters first application. Full scope details can be found in Harrow Campus Masterplan Scope for Design Team.

Harrow Campus Masterplan Consultancy - Planning Consultant

Planning Consultancy support on the Harrow Campus Masterplan Project. The University of Westminster Harrow Campus is part of the wider Northwick Park Masterplan, for which there are 4 landowners that collectively own the land. The information about the One Public Estate masterplan (OPE) is included as an appendix to the scope document. The OPE masterplan has an outline planning permission, and the planning strategy is to apply for approval of reserve matters .The application should be submitted within 3 years of the outline permission therefore no later than January 2026. The consultants will be for all phases and all buildings , but the team will be appointed initially for RIBA stage 1 for all buildings. Then the appointment will be initially for the buildings included in reserve matters first application. Full scope details can be found in Harrow Campus Masterplan Scope for Design Team.

Harrow Campus Masterplan Consultancy - Services (M&E)

Services (M&E) Consultancy support on the Harrow Campus Masterplan Project. The University of Westminster Harrow Campus is part of the wider Northwick Park Masterplan, for which there are 4 landowners that collectively own the land. The information about the One Public Estate masterplan (OPE) is included as an appendix to the scope document. The OPE masterplan has an outline planning permission, and the planning strategy is to apply for approval of reserve matters .The application should be submitted within 3 years of the outline permission therefore no later than January 2026. The consultants will be for all phases and all buildings , but the team will be appointed initially for RIBA stage 1 for all buildings. Then the appointment will be initially for the buildings included in reserve matters first application. Full scope details can be found in Harrow Campus Masterplan Scope for Design Team.

Harrow Campus Masterplan Consultancy - Civil Engineer

Civil Engineer Consultancy support on the Harrow Campus Masterplan Project. The University of Westminster Harrow Campus is part of the wider Northwick Park Masterplan, for which there are 4 landowners that collectively own the land. The information about the One Public Estate masterplan (OPE) is included as an appendix to the scope document. The OPE masterplan has an outline planning permission, and the planning strategy is to apply for approval of reserve matters .The application should be submitted within 3 years of the outline permission therefore no later than January 2026. The consultants will be for all phases and all buildings , but the team will be appointed initially for RIBA stage 1 for all buildings. Then the appointment will be initially for the buildings included in reserve matters first application. Full scope details can be found in Harrow Campus Masterplan Scope for Design Team.

Harrow Campus Masterplan Consultancy - Fire Consultant

Fire Consultancy support on the Harrow Campus Masterplan Project. The University of Westminster Harrow Campus is part of the wider Northwick Park Masterplan, for which there are 4 landowners that collectively own the land. The information about the One Public Estate masterplan (OPE) is included as an appendix to the scope document. The OPE masterplan has an outline planning permission, and the planning strategy is to apply for approval of reserve matters .The application should be submitted within 3 years of the outline permission therefore no later than January 2026. The consultants will be for all phases and all buildings , but the team will be appointed initially for RIBA stage 1 for all buildings. Then the appointment will be initially for the buildings included in reserve matters first application. Full scope details can be found in Harrow Campus Masterplan Scope for Design Team.

Harrow Campus Masterplan Consultancy - Project Manager

Project Manager support on the Harrow Campus Masterplan Project. The University of Westminster Harrow Campus is part of the wider Northwick Park Masterplan, for which there are 4 landowners that collectively own the land. The information about the One Public Estate masterplan (OPE) is included as an appendix to the scope document. The OPE masterplan has an outline planning permission, and the planning strategy is to apply for approval of reserve matters .The application should be submitted within 3 years of the outline permission therefore no later than January 2026. The consultants will be for all phases and all buildings , but the team will be appointed initially for RIBA stage 1 for all buildings. Then the appointment will be initially for the buildings included in reserve matters first application. Full scope details can be found in Harrow Campus Masterplan Scope for Design Team.

Harrow Campus Masterplan Consultancy - Cost Manager

Cost Manager support on the Harrow Campus Masterplan Project. The University of Westminster Harrow Campus is part of the wider Northwick Park Masterplan, for which there are 4 landowners that collectively own the land. The information about the One Public Estate masterplan (OPE) is included as an appendix to the scope document. The OPE masterplan has an outline planning permission, and the planning strategy is to apply for approval of reserve matters .The application should be submitted within 3 years of the outline permission therefore no later than January 2026. The consultants will be for all phases and all buildings , but the team will be appointed initially for RIBA stage 1 for all buildings. Then the appointment will be initially for the buildings included in reserve matters first application. Full scope details can be found in Harrow Campus Masterplan Scope for Design Team.

Harrow Campus Masterplan Consultancy - Acoustics and BREEAM

Acoustic and BREEAM Consultancy support on the Harrow Campus Masterplan Project. The University of Westminster Harrow Campus is part of the wider Northwick Park Masterplan, for which there are 4 landowners that collectively own the land. The information about the One Public Estate masterplan (OPE) is included as an appendix to the scope document. The OPE masterplan has an outline planning permission, and the planning strategy is to apply for approval of reserve matters .The application should be submitted within 3 years of the outline permission therefore no later than January 2026. The consultants will be for all phases and all buildings , but the team will be appointed initially for RIBA stage 1 for all buildings. Then the appointment will be initially for the buildings included in reserve matters first application. Full scope details can be found in Harrow Campus Masterplan Scope for Design Team.

Acoustician

The University is seeking a suitably experienced supplier/s to provide Consultancy support on the Harrow Campus Masterplan Project. The University of Westminster Harrow Campus is part of the wider Northwick Park Masterplan, for which there are 4 landowners that collectively own the land. The information about the One Public Estate masterplan (OPE) is included as an appendix to the scope document. The OPE masterplan has an outline planning permission, and the planning strategy is to apply for approval of reserve matters .The application should be submitted within 3 years of the outline permission therefore no later than January 2026. The tender for the consultants will be for all phases and all buildings , but the team will be appointed initially for RIBA stage 1 for all buildings. Then the appointment will be initially for the buildings included in reserve matters first application. Full scope details can be found in Harrow Campus Masterplan Scope for Design Team.

Principal designer

The University is seeking a suitably experienced supplier/s to provide Consultancy support on the Harrow Campus Masterplan Project. The University of Westminster Harrow Campus is part of the wider Northwick Park Masterplan, for which there are 4 landowners that collectively own the land. The information about the One Public Estate masterplan (OPE) is included as an appendix to the scope document. The OPE masterplan has an outline planning permission, and the planning strategy is to apply for approval of reserve matters .The application should be submitted within 3 years of the outline permission therefore no later than January 2026. The tender for the consultants will be for all phases and all buildings , but the team will be appointed initially for RIBA stage 1 for all buildings. Then the appointment will be initially for the buildings included in reserve matters first application. Full scope details can be found in Harrow Campus Masterplan Scope for Design Team.

Publication & Lifecycle

Open Contracting ID
ocds-h6vhtk-03a4b2
Publication Source
Find A Tender Service
Latest Notice
https://www.find-tender.service.gov.uk/Notice/027729-2024
Current Stage
Award
All Stages
Tender, Award

Procurement Classification

Notice Type
Tender Notice
Procurement Type
Standard
Procurement Category
Services
Procurement Method
Selective
Procurement Method Details
Restricted procedure
Tender Suitability
Not specified
Awardee Scale
Large

Common Procurement Vocabulary (CPV)

CPV Divisions

71 - Architectural, construction, engineering and inspection services


CPV Codes

71000000 - Architectural, construction, engineering and inspection services

71530000 - Construction consultancy services

Notice Value(s)

Tender Value
£15,000,000 £10M-£100M
Lots Value
£15,000,000 £10M-£100M
Awards Value
Not specified
Contracts Value
Not specified

Notice Dates

Publication Date
30 Aug 20241 years ago
Submission Deadline
13 Mar 2023Expired
Future Notice Date
Not specified
Award Date
28 Aug 20232 years ago
Contract Period
13 May 2023 - 31 Dec 2028 Over 5 years
Recurrence
Not specified

Notice Status

Tender Status
Complete
Lots Status
Active, Cancelled
Awards Status
Active
Contracts Status
Active

Contracting Authority (Buyer)

Main Buyer
THE UNIVERSITY OF WESTMINSTER
Contact Name
Steve Phelps
Contact Email
phelpss@westminster.ac.uk
Contact Phone
+44 7725138435

Buyer Location

Locality
LONDON
Postcode
W1B 2HW
Post Town
West London
Country
England

Major Region (ITL 1)
TLI London
Basic Region (ITL 2)
TLI3 Inner London - West
Small Region (ITL 3)
TLI35 Westminster and City of London
Delivery Location
TLI London

Local Authority
Westminster
Electoral Ward
West End
Westminster Constituency
Cities of London and Westminster

Supplier Information

Number of Suppliers
8
Supplier Names

BURO HAPPOLD

CAMPBELL REITH HILL

EXIGERE

HOARE LEA

PRP ARCHITECTURE

SPHERE25

TROUP BYWATERS + ANDERS

TURNER & TOWNSEND

Open Contracting Data Standard (OCDS)

View full OCDS Record for this contracting process

Download

The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.

{
    "tag": [
        "compiled"
    ],
    "id": "ocds-h6vhtk-03a4b2-2024-08-30T11:48:17+01:00",
    "date": "2024-08-30T11:48:17+01:00",
    "ocid": "ocds-h6vhtk-03a4b2",
    "initiationType": "tender",
    "tender": {
        "id": "DN655895",
        "legalBasis": {
            "id": "32014L0024",
            "scheme": "CELEX"
        },
        "title": "Harrow Campus Masterplan Consultancy",
        "status": "complete",
        "classification": {
            "scheme": "CPV",
            "id": "71530000",
            "description": "Construction consultancy services"
        },
        "mainProcurementCategory": "services",
        "description": "Consultancy support on the Harrow Campus Masterplan Project. The University of Westminster Harrow Campus is part of the wider Northwick Park Masterplan, for which there are 4 landowners that collectively own the land. The information about the One Public Estate masterplan (OPE) is included as an appendix to the scope document. The OPE masterplan has an outline planning permission, and the planning strategy is to apply for approval of reserve matters .The application should be submitted within 3 years of the outline permission therefore no later than January 2026. The consultants will be for all phases and all buildings , but the team will be appointed initially for RIBA stage 1 for all buildings. Then the appointment will be initially for the buildings included in reserve matters first application. Full scope details can be found in Harrow Campus Masterplan Scope for Design Team.",
        "value": {
            "amount": 15000000,
            "currency": "GBP"
        },
        "lotDetails": {
            "awardCriteriaDetails": "Lot Exclusions - In order to maintain independence of service, the University will not award any combination of the following lots to a single supplier: Lot 1: Architect, Lot 6: Project Manager, Lot 7: Cost Manager Suppliers may be selected for tender, if they successfully pass the SSQ stage for any lot. In this case, at tender evaluation the University will either: * Take the supplier preference into account, and/or * Award any conflicting lots to the closest 2nd place bidder"
        },
        "lots": [
            {
                "id": "1",
                "title": "Harrow Campus Masterplan Consultancy - Architect",
                "description": "Architect Consultancy support on the Harrow Campus Masterplan Project. The University of Westminster Harrow Campus is part of the wider Northwick Park Masterplan, for which there are 4 landowners that collectively own the land. The information about the One Public Estate masterplan (OPE) is included as an appendix to the scope document. The OPE masterplan has an outline planning permission, and the planning strategy is to apply for approval of reserve matters .The application should be submitted within 3 years of the outline permission therefore no later than January 2026. The consultants will be for all phases and all buildings , but the team will be appointed initially for RIBA stage 1 for all buildings. Then the appointment will be initially for the buildings included in reserve matters first application. Full scope details can be found in Harrow Campus Masterplan Scope for Design Team.",
                "value": {
                    "amount": 15000000,
                    "currency": "GBP"
                },
                "contractPeriod": {
                    "startDate": "2023-05-15T00:00:00+01:00",
                    "endDate": "2028-12-31T23:59:59Z"
                },
                "hasRenewal": false,
                "secondStage": {
                    "minimumCandidates": 4,
                    "maximumCandidates": 8
                },
                "submissionTerms": {
                    "variantPolicy": "notAllowed"
                },
                "hasOptions": false,
                "status": "cancelled",
                "awardCriteria": {
                    "criteria": [
                        {
                            "type": "price"
                        }
                    ]
                }
            },
            {
                "id": "2",
                "title": "Harrow Campus Masterplan Consultancy - Planning Consultant",
                "description": "Planning Consultancy support on the Harrow Campus Masterplan Project. The University of Westminster Harrow Campus is part of the wider Northwick Park Masterplan, for which there are 4 landowners that collectively own the land. The information about the One Public Estate masterplan (OPE) is included as an appendix to the scope document. The OPE masterplan has an outline planning permission, and the planning strategy is to apply for approval of reserve matters .The application should be submitted within 3 years of the outline permission therefore no later than January 2026. The consultants will be for all phases and all buildings , but the team will be appointed initially for RIBA stage 1 for all buildings. Then the appointment will be initially for the buildings included in reserve matters first application. Full scope details can be found in Harrow Campus Masterplan Scope for Design Team.",
                "value": {
                    "amount": 15000000,
                    "currency": "GBP"
                },
                "contractPeriod": {
                    "startDate": "2023-05-14T00:00:00+01:00",
                    "endDate": "2028-12-31T23:59:59Z"
                },
                "hasRenewal": false,
                "secondStage": {
                    "minimumCandidates": 4,
                    "maximumCandidates": 8
                },
                "submissionTerms": {
                    "variantPolicy": "notAllowed"
                },
                "hasOptions": false,
                "status": "cancelled",
                "awardCriteria": {
                    "criteria": [
                        {
                            "type": "price"
                        }
                    ]
                }
            },
            {
                "id": "3",
                "title": "Harrow Campus Masterplan Consultancy - Services (M&E)",
                "description": "Services (M&E) Consultancy support on the Harrow Campus Masterplan Project. The University of Westminster Harrow Campus is part of the wider Northwick Park Masterplan, for which there are 4 landowners that collectively own the land. The information about the One Public Estate masterplan (OPE) is included as an appendix to the scope document. The OPE masterplan has an outline planning permission, and the planning strategy is to apply for approval of reserve matters .The application should be submitted within 3 years of the outline permission therefore no later than January 2026. The consultants will be for all phases and all buildings , but the team will be appointed initially for RIBA stage 1 for all buildings. Then the appointment will be initially for the buildings included in reserve matters first application. Full scope details can be found in Harrow Campus Masterplan Scope for Design Team.",
                "value": {
                    "amount": 15000000,
                    "currency": "GBP"
                },
                "contractPeriod": {
                    "startDate": "2023-05-14T00:00:00+01:00",
                    "endDate": "2028-12-31T23:59:59Z"
                },
                "hasRenewal": false,
                "secondStage": {
                    "minimumCandidates": 4,
                    "maximumCandidates": 8
                },
                "submissionTerms": {
                    "variantPolicy": "notAllowed"
                },
                "hasOptions": false,
                "status": "cancelled",
                "awardCriteria": {
                    "criteria": [
                        {
                            "type": "price"
                        }
                    ]
                }
            },
            {
                "id": "4",
                "title": "Harrow Campus Masterplan Consultancy - Civil Engineer",
                "description": "Civil Engineer Consultancy support on the Harrow Campus Masterplan Project. The University of Westminster Harrow Campus is part of the wider Northwick Park Masterplan, for which there are 4 landowners that collectively own the land. The information about the One Public Estate masterplan (OPE) is included as an appendix to the scope document. The OPE masterplan has an outline planning permission, and the planning strategy is to apply for approval of reserve matters .The application should be submitted within 3 years of the outline permission therefore no later than January 2026. The consultants will be for all phases and all buildings , but the team will be appointed initially for RIBA stage 1 for all buildings. Then the appointment will be initially for the buildings included in reserve matters first application. Full scope details can be found in Harrow Campus Masterplan Scope for Design Team.",
                "value": {
                    "amount": 15000000,
                    "currency": "GBP"
                },
                "contractPeriod": {
                    "startDate": "2023-05-14T00:00:00+01:00",
                    "endDate": "2028-12-31T23:59:59Z"
                },
                "hasRenewal": false,
                "secondStage": {
                    "minimumCandidates": 4,
                    "maximumCandidates": 8
                },
                "submissionTerms": {
                    "variantPolicy": "notAllowed"
                },
                "hasOptions": false,
                "status": "cancelled",
                "awardCriteria": {
                    "criteria": [
                        {
                            "type": "price"
                        }
                    ]
                }
            },
            {
                "id": "5",
                "title": "Harrow Campus Masterplan Consultancy - Fire Consultant",
                "description": "Fire Consultancy support on the Harrow Campus Masterplan Project. The University of Westminster Harrow Campus is part of the wider Northwick Park Masterplan, for which there are 4 landowners that collectively own the land. The information about the One Public Estate masterplan (OPE) is included as an appendix to the scope document. The OPE masterplan has an outline planning permission, and the planning strategy is to apply for approval of reserve matters .The application should be submitted within 3 years of the outline permission therefore no later than January 2026. The consultants will be for all phases and all buildings , but the team will be appointed initially for RIBA stage 1 for all buildings. Then the appointment will be initially for the buildings included in reserve matters first application. Full scope details can be found in Harrow Campus Masterplan Scope for Design Team.",
                "value": {
                    "amount": 15000000,
                    "currency": "GBP"
                },
                "contractPeriod": {
                    "startDate": "2023-05-14T00:00:00+01:00",
                    "endDate": "2028-12-31T23:59:59Z"
                },
                "hasRenewal": false,
                "secondStage": {
                    "minimumCandidates": 4,
                    "maximumCandidates": 8
                },
                "submissionTerms": {
                    "variantPolicy": "notAllowed"
                },
                "hasOptions": false,
                "status": "cancelled",
                "awardCriteria": {
                    "criteria": [
                        {
                            "type": "price"
                        }
                    ]
                }
            },
            {
                "id": "6",
                "title": "Harrow Campus Masterplan Consultancy - Project Manager",
                "description": "Project Manager support on the Harrow Campus Masterplan Project. The University of Westminster Harrow Campus is part of the wider Northwick Park Masterplan, for which there are 4 landowners that collectively own the land. The information about the One Public Estate masterplan (OPE) is included as an appendix to the scope document. The OPE masterplan has an outline planning permission, and the planning strategy is to apply for approval of reserve matters .The application should be submitted within 3 years of the outline permission therefore no later than January 2026. The consultants will be for all phases and all buildings , but the team will be appointed initially for RIBA stage 1 for all buildings. Then the appointment will be initially for the buildings included in reserve matters first application. Full scope details can be found in Harrow Campus Masterplan Scope for Design Team.",
                "value": {
                    "amount": 15000000,
                    "currency": "GBP"
                },
                "contractPeriod": {
                    "startDate": "2023-05-14T00:00:00+01:00",
                    "endDate": "2028-12-31T23:59:59Z"
                },
                "hasRenewal": false,
                "secondStage": {
                    "minimumCandidates": 4,
                    "maximumCandidates": 8
                },
                "submissionTerms": {
                    "variantPolicy": "notAllowed"
                },
                "hasOptions": false,
                "status": "cancelled",
                "awardCriteria": {
                    "criteria": [
                        {
                            "type": "price"
                        }
                    ]
                }
            },
            {
                "id": "7",
                "title": "Harrow Campus Masterplan Consultancy - Cost Manager",
                "description": "Cost Manager support on the Harrow Campus Masterplan Project. The University of Westminster Harrow Campus is part of the wider Northwick Park Masterplan, for which there are 4 landowners that collectively own the land. The information about the One Public Estate masterplan (OPE) is included as an appendix to the scope document. The OPE masterplan has an outline planning permission, and the planning strategy is to apply for approval of reserve matters .The application should be submitted within 3 years of the outline permission therefore no later than January 2026. The consultants will be for all phases and all buildings , but the team will be appointed initially for RIBA stage 1 for all buildings. Then the appointment will be initially for the buildings included in reserve matters first application. Full scope details can be found in Harrow Campus Masterplan Scope for Design Team.",
                "value": {
                    "amount": 15000000,
                    "currency": "GBP"
                },
                "contractPeriod": {
                    "startDate": "2023-05-14T00:00:00+01:00",
                    "endDate": "2028-12-31T23:59:59Z"
                },
                "hasRenewal": false,
                "secondStage": {
                    "minimumCandidates": 4,
                    "maximumCandidates": 8
                },
                "submissionTerms": {
                    "variantPolicy": "notAllowed"
                },
                "hasOptions": false,
                "status": "cancelled",
                "awardCriteria": {
                    "criteria": [
                        {
                            "type": "price"
                        }
                    ]
                }
            },
            {
                "id": "8",
                "title": "Harrow Campus Masterplan Consultancy - Acoustics and BREEAM",
                "description": "Acoustic and BREEAM Consultancy support on the Harrow Campus Masterplan Project. The University of Westminster Harrow Campus is part of the wider Northwick Park Masterplan, for which there are 4 landowners that collectively own the land. The information about the One Public Estate masterplan (OPE) is included as an appendix to the scope document. The OPE masterplan has an outline planning permission, and the planning strategy is to apply for approval of reserve matters .The application should be submitted within 3 years of the outline permission therefore no later than January 2026. The consultants will be for all phases and all buildings , but the team will be appointed initially for RIBA stage 1 for all buildings. Then the appointment will be initially for the buildings included in reserve matters first application. Full scope details can be found in Harrow Campus Masterplan Scope for Design Team.",
                "value": {
                    "amount": 15000000,
                    "currency": "GBP"
                },
                "contractPeriod": {
                    "startDate": "2023-05-14T00:00:00+01:00",
                    "endDate": "2028-12-31T23:59:59Z"
                },
                "hasRenewal": false,
                "secondStage": {
                    "minimumCandidates": 4,
                    "maximumCandidates": 8
                },
                "submissionTerms": {
                    "variantPolicy": "notAllowed"
                },
                "hasOptions": false,
                "status": "cancelled",
                "awardCriteria": {
                    "criteria": [
                        {
                            "type": "price"
                        }
                    ]
                }
            },
            {
                "id": "9",
                "title": "Acoustician",
                "description": "The University is seeking a suitably experienced supplier/s to provide Consultancy support on the Harrow Campus Masterplan Project. The University of Westminster Harrow Campus is part of the wider Northwick Park Masterplan, for which there are 4 landowners that collectively own the land. The information about the One Public Estate masterplan (OPE) is included as an appendix to the scope document. The OPE masterplan has an outline planning permission, and the planning strategy is to apply for approval of reserve matters .The application should be submitted within 3 years of the outline permission therefore no later than January 2026. The tender for the consultants will be for all phases and all buildings , but the team will be appointed initially for RIBA stage 1 for all buildings. Then the appointment will be initially for the buildings included in reserve matters first application. Full scope details can be found in Harrow Campus Masterplan Scope for Design Team.",
                "value": {
                    "amount": 15000000,
                    "currency": "GBP"
                },
                "contractPeriod": {
                    "startDate": "2023-05-14T00:00:00+01:00",
                    "endDate": "2028-12-31T23:59:59Z"
                },
                "hasRenewal": false,
                "secondStage": {
                    "minimumCandidates": 4,
                    "maximumCandidates": 8
                },
                "submissionTerms": {
                    "variantPolicy": "notAllowed"
                },
                "hasOptions": false,
                "status": "active"
            },
            {
                "id": "10",
                "title": "Principal designer",
                "description": "The University is seeking a suitably experienced supplier/s to provide Consultancy support on the Harrow Campus Masterplan Project. The University of Westminster Harrow Campus is part of the wider Northwick Park Masterplan, for which there are 4 landowners that collectively own the land. The information about the One Public Estate masterplan (OPE) is included as an appendix to the scope document. The OPE masterplan has an outline planning permission, and the planning strategy is to apply for approval of reserve matters .The application should be submitted within 3 years of the outline permission therefore no later than January 2026. The tender for the consultants will be for all phases and all buildings , but the team will be appointed initially for RIBA stage 1 for all buildings. Then the appointment will be initially for the buildings included in reserve matters first application. Full scope details can be found in Harrow Campus Masterplan Scope for Design Team.",
                "value": {
                    "amount": 15000000,
                    "currency": "GBP"
                },
                "contractPeriod": {
                    "startDate": "2023-05-14T00:00:00+01:00",
                    "endDate": "2028-12-31T23:59:59Z"
                },
                "hasRenewal": false,
                "secondStage": {
                    "minimumCandidates": 4,
                    "maximumCandidates": 8
                },
                "submissionTerms": {
                    "variantPolicy": "notAllowed"
                },
                "hasOptions": false,
                "status": "active"
            }
        ],
        "items": [
            {
                "id": "1",
                "additionalClassifications": [
                    {
                        "scheme": "CPV",
                        "id": "71530000",
                        "description": "Construction consultancy services"
                    }
                ],
                "deliveryAddresses": [
                    {
                        "region": "UKI"
                    },
                    {
                        "region": "UKI"
                    }
                ],
                "deliveryLocation": {
                    "description": "Harrow"
                },
                "relatedLot": "1"
            },
            {
                "id": "2",
                "additionalClassifications": [
                    {
                        "scheme": "CPV",
                        "id": "71530000",
                        "description": "Construction consultancy services"
                    }
                ],
                "deliveryAddresses": [
                    {
                        "region": "UKI"
                    },
                    {
                        "region": "UKI"
                    }
                ],
                "deliveryLocation": {
                    "description": "Harrow"
                },
                "relatedLot": "2"
            },
            {
                "id": "3",
                "additionalClassifications": [
                    {
                        "scheme": "CPV",
                        "id": "71530000",
                        "description": "Construction consultancy services"
                    }
                ],
                "deliveryAddresses": [
                    {
                        "region": "UKI"
                    },
                    {
                        "region": "UKI"
                    }
                ],
                "deliveryLocation": {
                    "description": "Harrow"
                },
                "relatedLot": "3"
            },
            {
                "id": "4",
                "additionalClassifications": [
                    {
                        "scheme": "CPV",
                        "id": "71530000",
                        "description": "Construction consultancy services"
                    }
                ],
                "deliveryAddresses": [
                    {
                        "region": "UKI"
                    },
                    {
                        "region": "UKI"
                    }
                ],
                "deliveryLocation": {
                    "description": "Harrow"
                },
                "relatedLot": "4"
            },
            {
                "id": "5",
                "additionalClassifications": [
                    {
                        "scheme": "CPV",
                        "id": "71530000",
                        "description": "Construction consultancy services"
                    }
                ],
                "deliveryAddresses": [
                    {
                        "region": "UKI"
                    },
                    {
                        "region": "UKI"
                    }
                ],
                "deliveryLocation": {
                    "description": "Harrow"
                },
                "relatedLot": "5"
            },
            {
                "id": "6",
                "additionalClassifications": [
                    {
                        "scheme": "CPV",
                        "id": "71530000",
                        "description": "Construction consultancy services"
                    }
                ],
                "deliveryAddresses": [
                    {
                        "region": "UKI"
                    },
                    {
                        "region": "UKI"
                    }
                ],
                "deliveryLocation": {
                    "description": "Harrow"
                },
                "relatedLot": "6"
            },
            {
                "id": "7",
                "additionalClassifications": [
                    {
                        "scheme": "CPV",
                        "id": "71530000",
                        "description": "Construction consultancy services"
                    }
                ],
                "deliveryAddresses": [
                    {
                        "region": "UKI"
                    },
                    {
                        "region": "UKI"
                    }
                ],
                "deliveryLocation": {
                    "description": "Harrow"
                },
                "relatedLot": "7"
            },
            {
                "id": "8",
                "additionalClassifications": [
                    {
                        "scheme": "CPV",
                        "id": "71530000",
                        "description": "Construction consultancy services"
                    }
                ],
                "deliveryAddresses": [
                    {
                        "region": "UKI"
                    },
                    {
                        "region": "UKI"
                    }
                ],
                "deliveryLocation": {
                    "description": "Harrow"
                },
                "relatedLot": "8"
            },
            {
                "id": "9",
                "additionalClassifications": [
                    {
                        "scheme": "CPV",
                        "id": "71000000",
                        "description": "Architectural, construction, engineering and inspection services"
                    }
                ],
                "deliveryAddresses": [
                    {
                        "region": "UKI"
                    }
                ],
                "deliveryLocation": {
                    "description": "Harrow"
                },
                "relatedLot": "9"
            },
            {
                "id": "10",
                "additionalClassifications": [
                    {
                        "scheme": "CPV",
                        "id": "71000000",
                        "description": "Architectural, construction, engineering and inspection services"
                    }
                ],
                "deliveryAddresses": [
                    {
                        "region": "UKI"
                    }
                ],
                "deliveryLocation": {
                    "description": "Harrow"
                },
                "relatedLot": "10"
            }
        ],
        "participationFees": [
            {
                "id": "1",
                "type": [
                    "document"
                ]
            }
        ],
        "submissionMethod": [
            "electronicSubmission"
        ],
        "submissionMethodDetails": "https://procontract.due-north.com",
        "documents": [
            {
                "id": "economic",
                "documentType": "economicSelectionCriteria"
            },
            {
                "id": "technical",
                "documentType": "technicalSelectionCriteria"
            }
        ],
        "procurementMethod": "selective",
        "procurementMethodDetails": "Restricted procedure",
        "tenderPeriod": {
            "endDate": "2023-03-13T11:00:00Z"
        },
        "secondStage": {
            "invitationDate": "2023-03-16T00:00:00Z"
        },
        "submissionTerms": {
            "languages": [
                "en"
            ]
        },
        "hasRecurrence": false,
        "contractTerms": {
            "electronicInvoicingPolicy": "allowed"
        },
        "coveredBy": [
            "GPA"
        ]
    },
    "parties": [
        {
            "id": "GB-FTS-14980",
            "name": "THE UNIVERSITY OF WESTMINSTER",
            "identifier": {
                "legalName": "THE UNIVERSITY OF WESTMINSTER",
                "noIdentifierRationale": "notOnAnyRegister"
            },
            "address": {
                "streetAddress": "309 Regent Street",
                "locality": "LONDON",
                "region": "UKI32",
                "postalCode": "W1B2HW",
                "countryName": "United Kingdom"
            },
            "contactPoint": {
                "name": "Steve Phelps",
                "telephone": "+44 7725138435",
                "email": "phelpss@westminster.ac.uk",
                "url": "https://procontract.due-north.com"
            },
            "roles": [
                "buyer"
            ],
            "details": {
                "url": "https://www.westminster.ac.uk",
                "buyerProfile": "https://procontract.due-north.com",
                "classifications": [
                    {
                        "scheme": "TED_CA_TYPE",
                        "id": "BODY_PUBLIC",
                        "description": "Body governed by public law"
                    },
                    {
                        "scheme": "COFOG",
                        "id": "09",
                        "description": "Education"
                    }
                ]
            }
        },
        {
            "id": "GB-FTS-29332",
            "name": "University of Westminster",
            "identifier": {
                "legalName": "University of Westminster"
            },
            "address": {
                "locality": "London",
                "countryName": "United Kingdom"
            },
            "roles": [
                "reviewBody"
            ]
        },
        {
            "id": "GB-COH-00977818",
            "name": "THE UNIVERSITY OF WESTMINSTER",
            "identifier": {
                "legalName": "THE UNIVERSITY OF WESTMINSTER",
                "id": "00977818",
                "scheme": "GB-COH"
            },
            "address": {
                "streetAddress": "309 Regent Street",
                "locality": "LONDON",
                "region": "UKI32",
                "countryName": "United Kingdom"
            },
            "contactPoint": {
                "name": "Steve Phelps",
                "telephone": "+44 7725138435",
                "email": "phelpss@westminster.ac.uk"
            },
            "roles": [
                "buyer"
            ],
            "details": {
                "url": "https://www.westminster.ac.uk/",
                "classifications": [
                    {
                        "scheme": "TED_CA_TYPE",
                        "id": "BODY_PUBLIC",
                        "description": "Body governed by public law"
                    },
                    {
                        "scheme": "COFOG",
                        "id": "09",
                        "description": "Education"
                    }
                ]
            }
        },
        {
            "id": "GB-COH-OC431021",
            "name": "PRP Architecture LLP",
            "identifier": {
                "legalName": "PRP Architecture LLP",
                "id": "OC431021",
                "scheme": "GB-COH"
            },
            "address": {
                "locality": "Thames Ditton",
                "region": "UK",
                "countryName": "United Kingdom"
            },
            "roles": [
                "supplier"
            ],
            "details": {
                "scale": "large"
            }
        },
        {
            "id": "GB-COH-OC423461",
            "name": "Sphere25",
            "identifier": {
                "legalName": "Sphere25",
                "id": "OC423461",
                "scheme": "GB-COH"
            },
            "address": {
                "locality": "Brentwood",
                "region": "UK",
                "countryName": "United Kingdom"
            },
            "roles": [
                "supplier"
            ],
            "details": {
                "scale": "large"
            }
        },
        {
            "id": "GB-FTS-123032",
            "name": "Troup Bywaters + Anders",
            "identifier": {
                "legalName": "Troup Bywaters + Anders",
                "id": "N/A",
                "schemeEntered": "Partnership"
            },
            "address": {
                "locality": "London",
                "region": "UK",
                "countryName": "United Kingdom"
            },
            "roles": [
                "supplier"
            ],
            "details": {
                "scale": "large"
            }
        },
        {
            "id": "GB-COH-OC300082",
            "name": "Campbell Reith Hill LLP",
            "identifier": {
                "legalName": "Campbell Reith Hill LLP",
                "id": "OC300082",
                "scheme": "GB-COH"
            },
            "address": {
                "locality": "London",
                "region": "UK",
                "countryName": "United Kingdom"
            },
            "roles": [
                "supplier"
            ],
            "details": {
                "scale": "large"
            }
        },
        {
            "id": "GB-COH-2049511",
            "name": "Buro Happold",
            "identifier": {
                "legalName": "Buro Happold",
                "id": "2049511",
                "scheme": "GB-COH"
            },
            "address": {
                "locality": "Bath",
                "region": "UK",
                "countryName": "United Kingdom"
            },
            "roles": [
                "supplier"
            ],
            "details": {
                "scale": "large"
            }
        },
        {
            "id": "GB-COH-2165592",
            "name": "Turner & Townsend",
            "identifier": {
                "legalName": "Turner & Townsend",
                "id": "2165592",
                "scheme": "GB-COH"
            },
            "address": {
                "locality": "Leeds",
                "region": "UK",
                "countryName": "United Kingdom"
            },
            "roles": [
                "supplier"
            ],
            "details": {
                "scale": "large"
            }
        },
        {
            "id": "GB-COH-9049470",
            "name": "Exigere LLP",
            "identifier": {
                "legalName": "Exigere LLP",
                "id": "9049470",
                "scheme": "GB-COH"
            },
            "address": {
                "locality": "London",
                "region": "UK",
                "countryName": "United Kingdom"
            },
            "roles": [
                "supplier"
            ],
            "details": {
                "scale": "large"
            }
        },
        {
            "id": "GB-COH-OC407254",
            "name": "Hoare Lea",
            "identifier": {
                "legalName": "Hoare Lea",
                "id": "OC407254",
                "scheme": "GB-COH"
            },
            "address": {
                "locality": "Bristol",
                "region": "UK",
                "countryName": "United Kingdom"
            },
            "roles": [
                "supplier"
            ],
            "details": {
                "scale": "large"
            }
        }
    ],
    "buyer": {
        "id": "GB-COH-00977818",
        "name": "THE UNIVERSITY OF WESTMINSTER"
    },
    "language": "en",
    "awards": [
        {
            "id": "027729-2024-1",
            "status": "active",
            "suppliers": [
                {
                    "id": "GB-COH-OC431021",
                    "name": "PRP Architecture LLP"
                },
                {
                    "id": "GB-COH-OC423461",
                    "name": "Sphere25"
                },
                {
                    "id": "GB-FTS-123032",
                    "name": "Troup Bywaters + Anders"
                },
                {
                    "id": "GB-COH-OC300082",
                    "name": "Campbell Reith Hill LLP"
                },
                {
                    "id": "GB-COH-2049511",
                    "name": "Buro Happold"
                },
                {
                    "id": "GB-COH-2165592",
                    "name": "Turner & Townsend"
                },
                {
                    "id": "GB-COH-9049470",
                    "name": "Exigere LLP"
                },
                {
                    "id": "GB-COH-OC407254",
                    "name": "Hoare Lea"
                }
            ]
        }
    ],
    "contracts": [
        {
            "id": "027729-2024-1",
            "awardID": "027729-2024-1",
            "status": "active",
            "dateSigned": "2023-08-29T00:00:00+01:00"
        }
    ],
    "bids": {
        "statistics": [
            {
                "id": "5",
                "measure": "bids",
                "value": 45
            },
            {
                "id": "3",
                "measure": "lowestValidBidValue",
                "value": 100000,
                "currency": "GBP"
            },
            {
                "id": "4",
                "measure": "highestValidBidValue",
                "value": 2000000,
                "currency": "GBP"
            },
            {
                "id": "1",
                "measure": "lowestValidBidValue",
                "value": 100000,
                "currency": "GBP"
            },
            {
                "id": "2",
                "measure": "highestValidBidValue",
                "value": 2000000,
                "currency": "GBP"
            }
        ]
    }
}