Notice Information
Notice Title
UK Manufacturing Technology for Next Generation Wind Turbines: Composites Phase 2B
Notice Description
Department for Energy Security and Net Zero has appointed the Offshore Renewable Energy Catapult (OREC) to carry out the work described in Section II.2.4 of this notice. OREC will work in close collaboration with the National Composites Centre (NCC) to deliver the scope of the project. OREC and NCC are members of the UK Catapult Network and are centres of excellence responsible for offshore wind and composite materials respectively. This collaboration is therefore a unique offering of all of the skills and capabilities needed to deliver this project.
Lot Information
Lot 1
Department for Energy Security and Net Zero has procured work under Phase 2B of the 'UK Manufacturing Technology for Next Generation Wind Turbines'. This is a continuation of Joule Phase 1, which investigated the potential for incorporating radically new composite-based components and lightweight designs in 20MW+ offshore wind turbines and Joule Phase 2, which developed more detailed design concepts for a range of composite components within an offshore wind turbine. Engagement with the industry during Phase 2 has highlighted a number of risks with progressing to openly tendered Phase 3, and this Phase 2B has been designed to address those risks and will further progress the technical design and verification of a composite tower product and establish the basis and strategy for the tower's potential commercial exploitation to best benefit the UK supply chain in the potential Phase 3.
Procurement Information
Department for Energy Security and Net Zero (DESNZ) was looking for a Delivery Partner (DP) with a number of characteristics, which would enable effective delivery of the scope of the programme. The DP is required to have deep technical expertise and operational knowledge in offshore wind and composite industries; ability to engage with the market and the supply chain in a neutral way. The Catapult network was set up to be neutral and in the benefit of UK PLC therefore OREC/NCC's participation in a potential Phase 3 will remain neutral, fair and supports the applicants/successful suppliers in a non-competitive way. While developing the business case for this programme, DESNZ has considered various procurement route options. DESNZ market analysis was informed by holding a market engagement event to seek market input. The technical challenge of this programme is to apply the innovation in both the design and manufacturing of composite components in areas of the wind turbine systems, which have historically not utilised composites. The DESNZ market analysis has indicated that there is no single organisation able to deliver the niche yet demanding technical scope of Phase 2B, it also showed evidence that a consortium of OREC/NCC has the technical capability to deliver Phase 2B and that a different DP would likely have to subcontract OREC/NCC services to deliver the programme. NCC is the UK's leading authority on the design and manufacture of composite structures, OREC is the UK's leading authority on offshore wind, including the component design, validation and supply chain growth of the industry. The combination of the NCC and OREC represents the key technology areas required to deliver the programme, combining composite and offshore wind design, manufacturing and supply chain knowledge. The partnership is actively working on other composites / offshore wind programmes and previously delivered Phase 1 and Phase 2 of this programme. As defined by UK Government, the role of Catapults is to engage with industry to drive and support adoption of new technologies. OREC/NCC are technology and solution agnostic, they work with full supply chain without ties to particular suppliers or manufacturers and they are not-for-profit. The justification for the Single Tender Action (STA) is therefore that competition is absent due to technical reasons, and to provide the combination of skills, integration and neutrality a STA to OREC/NCC, is the most suitable procurement route to achieve the objectives and outcomes of Phase 2B of the programme.
Notice Details
Publication & Lifecycle
- Open Contracting ID
- ocds-h6vhtk-03df67
- Publication Source
- Find A Tender Service
- Latest Notice
- https://www.find-tender.service.gov.uk/Notice/031176-2023
- Current Stage
- Award
- All Stages
- Award
Procurement Classification
- Notice Type
- Award Notice
- Procurement Type
- Standard
- Procurement Category
- Services
- Procurement Method
- Limited
- Procurement Method Details
- Award procedure without prior publication of a call for competition
- Tender Suitability
- Not specified
- Awardee Scale
- Large
Common Procurement Vocabulary (CPV)
- CPV Divisions
71 - Architectural, construction, engineering and inspection services
-
- CPV Codes
71314000 - Energy and related services
Notice Value(s)
- Tender Value
- Not specified
- Lots Value
- Not specified
- Awards Value
- Not specified
- Contracts Value
- £4,700,000 £1M-£10M
Notice Dates
- Publication Date
- 23 Oct 20232 years ago
- Submission Deadline
- Not specified
- Future Notice Date
- Not specified
- Award Date
- 5 Jul 20232 years ago
- Contract Period
- Not specified - Not specified
- Recurrence
- Not specified
Notice Status
- Tender Status
- Complete
- Lots Status
- Cancelled
- Awards Status
- Active
- Contracts Status
- Active
Buyer & Supplier
Contracting Authority (Buyer)
- Main Buyer
- DEPARTMENT FOR ENERGY SECURITY AND NET ZERO
- Contact Name
- Not specified
- Contact Email
- renewables.innovation@beis.gov.uk
- Contact Phone
- Not specified
Buyer Location
- Locality
- LONDON
- Postcode
- SW1H 0ET
- Post Town
- South West London
- Country
- England
-
- Major Region (ITL 1)
- TLI London
- Basic Region (ITL 2)
- TLI3 Inner London - West
- Small Region (ITL 3)
- TLI35 Westminster and City of London
- Delivery Location
- Not specified
-
- Local Authority
- Westminster
- Electoral Ward
- St James's
- Westminster Constituency
- Cities of London and Westminster
Further Information
Open Contracting Data Standard (OCDS)
View full OCDS Record for this contracting process
The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.
{
"tag": [
"compiled"
],
"id": "ocds-h6vhtk-03df67-2023-10-23T11:52:32+01:00",
"date": "2023-10-23T11:52:32+01:00",
"ocid": "ocds-h6vhtk-03df67",
"initiationType": "tender",
"tender": {
"id": "prj_2024",
"legalBasis": {
"id": "32014L0024",
"scheme": "CELEX"
},
"title": "UK Manufacturing Technology for Next Generation Wind Turbines: Composites Phase 2B",
"status": "complete",
"classification": {
"scheme": "CPV",
"id": "71314000",
"description": "Energy and related services"
},
"mainProcurementCategory": "services",
"description": "Department for Energy Security and Net Zero has appointed the Offshore Renewable Energy Catapult (OREC) to carry out the work described in Section II.2.4 of this notice. OREC will work in close collaboration with the National Composites Centre (NCC) to deliver the scope of the project. OREC and NCC are members of the UK Catapult Network and are centres of excellence responsible for offshore wind and composite materials respectively. This collaboration is therefore a unique offering of all of the skills and capabilities needed to deliver this project.",
"lots": [
{
"id": "1",
"description": "Department for Energy Security and Net Zero has procured work under Phase 2B of the 'UK Manufacturing Technology for Next Generation Wind Turbines'. This is a continuation of Joule Phase 1, which investigated the potential for incorporating radically new composite-based components and lightweight designs in 20MW+ offshore wind turbines and Joule Phase 2, which developed more detailed design concepts for a range of composite components within an offshore wind turbine. Engagement with the industry during Phase 2 has highlighted a number of risks with progressing to openly tendered Phase 3, and this Phase 2B has been designed to address those risks and will further progress the technical design and verification of a composite tower product and establish the basis and strategy for the tower's potential commercial exploitation to best benefit the UK supply chain in the potential Phase 3.",
"hasOptions": false,
"awardCriteria": {
"criteria": [
{
"type": "price"
}
]
},
"status": "cancelled"
}
],
"items": [
{
"id": "1",
"deliveryAddresses": [
{
"region": "UK"
},
{
"region": "UK"
}
],
"relatedLot": "1"
}
],
"procurementMethod": "limited",
"procurementMethodDetails": "Award procedure without prior publication of a call for competition",
"coveredBy": [
"GPA"
],
"procurementMethodRationaleClassifications": [
{
"scheme": "TED_PT_AWARD_CONTRACT_WITHOUT_CALL",
"id": "D_TECHNICAL",
"description": "The works, supplies or services can be provided only by a particular economic operator due to absence of competition for technical reasons"
}
],
"procurementMethodRationale": "Department for Energy Security and Net Zero (DESNZ) was looking for a Delivery Partner (DP) with a number of characteristics, which would enable effective delivery of the scope of the programme. The DP is required to have deep technical expertise and operational knowledge in offshore wind and composite industries; ability to engage with the market and the supply chain in a neutral way. The Catapult network was set up to be neutral and in the benefit of UK PLC therefore OREC/NCC's participation in a potential Phase 3 will remain neutral, fair and supports the applicants/successful suppliers in a non-competitive way. While developing the business case for this programme, DESNZ has considered various procurement route options. DESNZ market analysis was informed by holding a market engagement event to seek market input. The technical challenge of this programme is to apply the innovation in both the design and manufacturing of composite components in areas of the wind turbine systems, which have historically not utilised composites. The DESNZ market analysis has indicated that there is no single organisation able to deliver the niche yet demanding technical scope of Phase 2B, it also showed evidence that a consortium of OREC/NCC has the technical capability to deliver Phase 2B and that a different DP would likely have to subcontract OREC/NCC services to deliver the programme. NCC is the UK's leading authority on the design and manufacture of composite structures, OREC is the UK's leading authority on offshore wind, including the component design, validation and supply chain growth of the industry. The combination of the NCC and OREC represents the key technology areas required to deliver the programme, combining composite and offshore wind design, manufacturing and supply chain knowledge. The partnership is actively working on other composites / offshore wind programmes and previously delivered Phase 1 and Phase 2 of this programme. As defined by UK Government, the role of Catapults is to engage with industry to drive and support adoption of new technologies. OREC/NCC are technology and solution agnostic, they work with full supply chain without ties to particular suppliers or manufacturers and they are not-for-profit. The justification for the Single Tender Action (STA) is therefore that competition is absent due to technical reasons, and to provide the combination of skills, integration and neutrality a STA to OREC/NCC, is the most suitable procurement route to achieve the objectives and outcomes of Phase 2B of the programme."
},
"awards": [
{
"id": "019305-2023-con_4302-1",
"relatedLots": [
"1"
],
"status": "active",
"hasSubcontracting": true,
"subcontracting": {
"minimumPercentage": 0.65,
"maximumPercentage": 0.65,
"description": "The contract will be with OREC, who will work in close collaboration with the NCC, subcontracting approximately half of the work to the NCC to lead on all activities related to the use of composite materials. Approx. 30% of the total contract value will go to the UK supply chain to deliver services such as supply of tooling and manufacture."
},
"suppliers": [
{
"id": "GB-FTS-86769",
"name": "Offshore Renewable Energy Catapult (OREC)"
}
]
},
{
"id": "031176-2023-con_4302-1",
"relatedLots": [
"1"
],
"title": "UK Manufacturing Technology for Next Generation Wind Turbines: Composites Phase 2B",
"status": "active",
"hasSubcontracting": true,
"subcontracting": {
"minimumPercentage": 0.65,
"maximumPercentage": 0.65,
"description": "The contract will be with OREC, who will work in close collaboration with the NCC, subcontracting approximately half of the work to the NCC to lead on all activities related to the use of composite materials. Approx. 30% of the total contract value will go to the UK supply chain to deliver services such as supply of tooling and manufacture."
},
"suppliers": [
{
"id": "GB-FTS-95993",
"name": "Offshore Renewable Energy Catapult Development Limited"
}
]
}
],
"parties": [
{
"id": "GB-FTS-84716",
"name": "Department for Energy Security and Net Zero",
"identifier": {
"legalName": "Department for Energy Security and Net Zero"
},
"address": {
"locality": "London",
"region": "UK",
"postalCode": "SW1H 0ET",
"countryName": "United Kingdom"
},
"contactPoint": {
"email": "renewables.innovation@beis.gov.uk"
},
"roles": [
"buyer"
],
"details": {
"url": "https://www.gov.uk/government/organisations/department-for-energy-security-and-net-zero",
"classifications": [
{
"scheme": "TED_CA_TYPE",
"id": "MINISTRY",
"description": "Ministry or any other national or federal authority, including their regional or local subdivisions"
},
{
"scheme": "COFOG",
"id": "05",
"description": "Environmental protection"
}
]
}
},
{
"id": "GB-FTS-86769",
"name": "Offshore Renewable Energy Catapult (OREC)",
"identifier": {
"legalName": "Offshore Renewable Energy Catapult (OREC)"
},
"address": {
"locality": "Blyth",
"region": "UK",
"countryName": "United Kingdom"
},
"roles": [
"supplier"
],
"details": {
"scale": "large"
}
},
{
"id": "GB-FTS-79307",
"name": "Department for Energy Security and Net Zero",
"identifier": {
"legalName": "Department for Energy Security and Net Zero"
},
"address": {
"streetAddress": "1 Victoria Street",
"locality": "London",
"postalCode": "SW1H 0ET",
"countryName": "United Kingdom"
},
"roles": [
"reviewBody"
]
},
{
"id": "GB-FTS-94110",
"name": "Department for Energy Security and Net Zero",
"identifier": {
"legalName": "Department for Energy Security and Net Zero"
},
"address": {
"streetAddress": "3-8 Whitehall Place",
"locality": "London",
"region": "UK",
"postalCode": "SW1A 2EG",
"countryName": "United Kingdom"
},
"contactPoint": {
"email": "renewables.innovation@beis.gov.uk"
},
"roles": [
"buyer",
"centralPurchasingBody",
"reviewBody"
],
"details": {
"url": "https://www.gov.uk/government/organisations/department-for-energy-security-and-net-zero",
"classifications": [
{
"scheme": "TED_CA_TYPE",
"id": "MINISTRY",
"description": "Ministry or any other national or federal authority, including their regional or local subdivisions"
},
{
"scheme": "COFOG",
"id": "05",
"description": "Environmental protection"
}
]
}
},
{
"id": "GB-FTS-95993",
"name": "Offshore Renewable Energy Catapult Development Limited",
"identifier": {
"legalName": "Offshore Renewable Energy Catapult Development Limited"
},
"address": {
"streetAddress": "Offshore House, Albert Street, Blyth",
"locality": "Northumberland",
"region": "UK",
"postalCode": "NE24 1LZ",
"countryName": "United Kingdom"
},
"roles": [
"supplier"
],
"details": {
"scale": "large"
}
}
],
"buyer": {
"id": "GB-FTS-94110",
"name": "Department for Energy Security and Net Zero"
},
"contracts": [
{
"id": "019305-2023-con_4302-1",
"awardID": "019305-2023-con_4302-1",
"status": "active",
"value": {
"amount": 4700000,
"currency": "GBP"
},
"dateSigned": "2023-07-06T00:00:00+01:00"
},
{
"id": "031176-2023-con_4302-1",
"awardID": "031176-2023-con_4302-1",
"title": "UK Manufacturing Technology for Next Generation Wind Turbines: Composites Phase 2B",
"status": "active",
"value": {
"amount": 4700000,
"currency": "GBP"
},
"dateSigned": "2023-10-23T00:00:00+01:00"
}
],
"links": [
{
"rel": "canonical",
"href": "https://www.gov.uk/government/organisations/department-for-energy-security-and-net-zero"
}
],
"language": "en",
"bids": {
"statistics": [
{
"id": "1",
"measure": "bids",
"relatedLot": "1",
"value": 1
}
]
}
}