Notice Information
Notice Title
FRAM833/23
Notice Description
The University would like to establish a contract for the supply and installation of an equipment upgrade within the Elgar Concert Hall. The University's procurement will consist of three Lots as detailed below, and at its discretion will award a contract to a single supplier for all Lots, or a different supplier for each of the Lots: * Lot 1 - PA System * Lot 2 - Mixing Console & Stage Boxes * Lot 3 - Lighting Systems
Lot Information
PA System
Audio Visual is a key component in delivering good teaching and operations at the University of Birmingham. The University has a strong in-house Audio-Visual team that sets design standards applicable throughout the institution, handles most design and sign-off tasks, provides professional advice, and maintains a large collection of over 350 spaces. The University requires a supplier of Audio-Visual kit who can provide an upgrade for the existing equipment installed within the Elgar Concert Hall. The Elgar Concert Hall is situated within the University's Bramall Music Building, which is an extension of the Aston Webb Building, and sits alongside the Great Hall. The Bramall opened its doors in June 2012 and includes a 450-seat concert hall (The Elgar Concert Hall) designed by renowned acoustician Nicholas Edwards of Acoustic Dimensions (Symphony Hall Birmingham, Symphony Centre Dallas, Royal Shakespeare Theatre). For further information, please visit: https://www.birmingham.ac.uk/bramall/index.aspx The concert hall and its acoustics can be configured for rehearsals and performances ranging from solo recitals to full symphony orchestra, 200-strong University Choir, multi-projector video and music-theatre presentations, and the electroacoustic studios' 100-channel sound diffusion system. New requirements for the upgrade will need to be compatible with existing equipment within the Elgar Concert Hall, and it is a mandatory requirement that delivery of equipment and installation or configuration will take place during the University's Christmas closed period, to ensure teaching is not affected. For the PA System, the University currently owns a stock of various D&B Audiotechnik speakers (E12, E8, E6, E3, V10P, B6, B4) and amplifiers (D12, D6, D40, EPac), used for front/side/foldback fills as required, and a small stock of monitor wedges (M6). Any system design will need to integrate with the above existing equipment. Equipment will need to be delivered, received, and installed by no later than 14th January 2024.
Mixing Console & Stage BoxesAudio Visual is a key component in delivering good teaching and operations at the University of Birmingham. The University has a strong in-house Audio-Visual team that sets design standards applicable throughout the institution, handles most design and sign-off tasks, provides professional advice, and maintains a large collection of over 350 spaces. The University requires a supplier of Audio-Visual kit who can provide an upgrade for the existing equipment installed within the Elgar Concert Hall. The Elgar Concert Hall is situated within the University's Bramall Music Building, which is an extension of the Aston Webb Building, and sits alongside the Great Hall. The Bramall opened its doors in June 2012 and includes a 450-seat concert hall (The Elgar Concert Hall) designed by renowned acoustician Nicholas Edwards of Acoustic Dimensions (Symphony Hall Birmingham, Symphony Centre Dallas, Royal Shakespeare Theatre). For further information, please visit: https://www.birmingham.ac.uk/bramall/index.aspx The concert hall and its acoustics can be configured for rehearsals and performances ranging from solo recitals to full symphony orchestra, 200-strong University Choir, multi-projector video and music-theatre presentations, and the electroacoustic studios' 100-channel sound diffusion system. New requirements for the upgrade will need to be compatible with existing equipment within the Elgar Concert Hall, and it is a mandatory requirement that delivery of equipment and installation or configuration will take place during the University's Christmas closed period, to ensure teaching is not affected. The University currently owns a Yamaha CL3 with associated RIO stageboxes, connected via Dante. We require any console supplied to be compatible with the existing equipment. Equipment will need to be delivered, received, and installed by no later than 14th January 2024.
Lighting SystemAudio Visual is a key component in delivering good teaching and operations at the University of Birmingham. The University has a strong in-house Audio-Visual team that sets design standards applicable throughout the institution, handles most design and sign-off tasks, provides professional advice, and maintains a large collection of over 350 spaces. The University requires a supplier of Audio-Visual kit who can provide an upgrade for the existing equipment installed within the Elgar Concert Hall. The Elgar Concert Hall is situated within the University's Bramall Music Building, which is an extension of the Aston Webb Building, and sits alongside the Great Hall. The Bramall opened its doors in June 2012 and includes a 450-seat concert hall (The Elgar Concert Hall) designed by renowned acoustician Nicholas Edwards of Acoustic Dimensions (Symphony Hall Birmingham, Symphony Centre Dallas, Royal Shakespeare Theatre). For further information, please visit: https://www.birmingham.ac.uk/bramall/index.aspx The concert hall and its acoustics can be configured for rehearsals and performances ranging from solo recitals to full symphony orchestra, 200-strong University Choir, multi-projector video and music-theatre presentations, and the electroacoustic studios' 100-channel sound diffusion system. New requirements for the upgrade will need to be compatible with existing equipment within the Elgar Concert Hall, and it is a mandatory requirement that delivery of equipment and installation or configuration will take place during the University's Christmas closed period, to ensure teaching is not affected. The profile fixtures which the University currently owns are ETC Source 4's, and any replacement fixtures supplied must retain compatibility with our current lens stock. Please note: We recommend suppliers utilise the opportunity to visit the Elgar Concert Hall as compatibility with our current stage and control room panels may or may not be possible depending on the solutions offered. Equipment will need to be delivered, received, and installed by no later than 14th January 2024.
Notice Details
Publication & Lifecycle
- Open Contracting ID
- ocds-h6vhtk-03edec
- Publication Source
- Find A Tender Service
- Latest Notice
- https://www.find-tender.service.gov.uk/Notice/005675-2024
- Current Stage
- Award
- All Stages
- Tender, Award
Procurement Classification
- Notice Type
- Tender Notice
- Procurement Type
- Standard
- Procurement Category
- Goods
- Procurement Method
- Open
- Procurement Method Details
- Open procedure
- Tender Suitability
- Not specified
- Awardee Scale
- SME
Common Procurement Vocabulary (CPV)
- CPV Divisions
31 - Electrical machinery, apparatus, equipment and consumables; lighting
32 - Radio, television, communication, telecommunication and related equipment
-
- CPV Codes
31527260 - Lighting systems
32321200 - Audio-visual equipment
32342420 - Studio mixing console
Notice Value(s)
- Tender Value
- £450,000 £100K-£500K
- Lots Value
- Not specified
- Awards Value
- Not specified
- Contracts Value
- £363,349 £100K-£500K
Notice Dates
- Publication Date
- 21 Feb 20242 years ago
- Submission Deadline
- 8 Sep 2023Expired
- Future Notice Date
- Not specified
- Award Date
- 17 Nov 20232 years ago
- Contract Period
- 22 Oct 2023 - 14 Jan 2024 1-6 months
- Recurrence
- Not specified
Notice Status
- Tender Status
- Complete
- Lots Status
- Cancelled
- Awards Status
- Active
- Contracts Status
- Active
Buyer & Supplier
Contracting Authority (Buyer)
- Main Buyer
- THE UNIVERSITY OF BIRMINGHAM
- Contact Name
- Graham Price
- Contact Email
- g.a.price@bham.ac.uk
- Contact Phone
- Not specified
Buyer Location
- Locality
- BIRMINGHAM
- Postcode
- B15 2TT
- Post Town
- Birmingham
- Country
- England
-
- Major Region (ITL 1)
- TLG West Midlands (England)
- Basic Region (ITL 2)
- TLG3 West Midlands
- Small Region (ITL 3)
- TLG31 Birmingham
- Delivery Location
- TLG31 Birmingham
-
- Local Authority
- Birmingham
- Electoral Ward
- Edgbaston
- Westminster Constituency
- Birmingham Edgbaston
Further Information
Open Contracting Data Standard (OCDS)
View full OCDS Record for this contracting process
The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.
{
"tag": [
"compiled"
],
"id": "ocds-h6vhtk-03edec-2024-02-21T14:03:56Z",
"date": "2024-02-21T14:03:56Z",
"ocid": "ocds-h6vhtk-03edec",
"initiationType": "tender",
"tender": {
"id": "ocds-h6vhtk-03edec",
"legalBasis": {
"id": "32014L0024",
"scheme": "CELEX"
},
"title": "FRAM833/23",
"status": "complete",
"classification": {
"scheme": "CPV",
"id": "32321200",
"description": "Audio-visual equipment"
},
"mainProcurementCategory": "goods",
"description": "The University would like to establish a contract for the supply and installation of an equipment upgrade within the Elgar Concert Hall. The University's procurement will consist of three Lots as detailed below, and at its discretion will award a contract to a single supplier for all Lots, or a different supplier for each of the Lots: * Lot 1 - PA System * Lot 2 - Mixing Console & Stage Boxes * Lot 3 - Lighting Systems",
"value": {
"amount": 450000,
"currency": "GBP"
},
"lots": [
{
"id": "1",
"title": "PA System",
"description": "Audio Visual is a key component in delivering good teaching and operations at the University of Birmingham. The University has a strong in-house Audio-Visual team that sets design standards applicable throughout the institution, handles most design and sign-off tasks, provides professional advice, and maintains a large collection of over 350 spaces. The University requires a supplier of Audio-Visual kit who can provide an upgrade for the existing equipment installed within the Elgar Concert Hall. The Elgar Concert Hall is situated within the University's Bramall Music Building, which is an extension of the Aston Webb Building, and sits alongside the Great Hall. The Bramall opened its doors in June 2012 and includes a 450-seat concert hall (The Elgar Concert Hall) designed by renowned acoustician Nicholas Edwards of Acoustic Dimensions (Symphony Hall Birmingham, Symphony Centre Dallas, Royal Shakespeare Theatre). For further information, please visit: https://www.birmingham.ac.uk/bramall/index.aspx The concert hall and its acoustics can be configured for rehearsals and performances ranging from solo recitals to full symphony orchestra, 200-strong University Choir, multi-projector video and music-theatre presentations, and the electroacoustic studios' 100-channel sound diffusion system. New requirements for the upgrade will need to be compatible with existing equipment within the Elgar Concert Hall, and it is a mandatory requirement that delivery of equipment and installation or configuration will take place during the University's Christmas closed period, to ensure teaching is not affected. For the PA System, the University currently owns a stock of various D&B Audiotechnik speakers (E12, E8, E6, E3, V10P, B6, B4) and amplifiers (D12, D6, D40, EPac), used for front/side/foldback fills as required, and a small stock of monitor wedges (M6). Any system design will need to integrate with the above existing equipment. Equipment will need to be delivered, received, and installed by no later than 14th January 2024.",
"awardCriteria": {
"criteria": [
{
"name": "Compliance to the Specification",
"type": "quality",
"description": "20"
},
{
"name": "Aftersales and Technical Back-up",
"type": "quality",
"description": "20"
},
{
"name": "Delivery, Installation, and Training",
"type": "quality",
"description": "15"
},
{
"name": "Sustainability and Environmental",
"type": "quality",
"description": "5"
},
{
"name": "Standard Supplier Questionnaire",
"type": "quality",
"description": "10"
},
{
"type": "price",
"description": "30"
}
]
},
"contractPeriod": {
"startDate": "2023-10-23T00:00:00+01:00",
"endDate": "2024-01-14T23:59:59Z"
},
"hasRenewal": false,
"submissionTerms": {
"variantPolicy": "allowed"
},
"hasOptions": false,
"status": "cancelled"
},
{
"id": "2",
"title": "Mixing Console & Stage Boxes",
"description": "Audio Visual is a key component in delivering good teaching and operations at the University of Birmingham. The University has a strong in-house Audio-Visual team that sets design standards applicable throughout the institution, handles most design and sign-off tasks, provides professional advice, and maintains a large collection of over 350 spaces. The University requires a supplier of Audio-Visual kit who can provide an upgrade for the existing equipment installed within the Elgar Concert Hall. The Elgar Concert Hall is situated within the University's Bramall Music Building, which is an extension of the Aston Webb Building, and sits alongside the Great Hall. The Bramall opened its doors in June 2012 and includes a 450-seat concert hall (The Elgar Concert Hall) designed by renowned acoustician Nicholas Edwards of Acoustic Dimensions (Symphony Hall Birmingham, Symphony Centre Dallas, Royal Shakespeare Theatre). For further information, please visit: https://www.birmingham.ac.uk/bramall/index.aspx The concert hall and its acoustics can be configured for rehearsals and performances ranging from solo recitals to full symphony orchestra, 200-strong University Choir, multi-projector video and music-theatre presentations, and the electroacoustic studios' 100-channel sound diffusion system. New requirements for the upgrade will need to be compatible with existing equipment within the Elgar Concert Hall, and it is a mandatory requirement that delivery of equipment and installation or configuration will take place during the University's Christmas closed period, to ensure teaching is not affected. The University currently owns a Yamaha CL3 with associated RIO stageboxes, connected via Dante. We require any console supplied to be compatible with the existing equipment. Equipment will need to be delivered, received, and installed by no later than 14th January 2024.",
"awardCriteria": {
"criteria": [
{
"name": "Compliance to the Specification",
"type": "quality",
"description": "20"
},
{
"name": "Aftersales and Technical Back-up",
"type": "quality",
"description": "20"
},
{
"name": "Delivery, Installation and Training",
"type": "quality",
"description": "15"
},
{
"name": "Sustainability and Environmental",
"type": "quality",
"description": "5"
},
{
"name": "Standard Supplier Questionnaire",
"type": "quality",
"description": "10"
},
{
"type": "price",
"description": "30"
}
]
},
"contractPeriod": {
"startDate": "2023-10-23T00:00:00+01:00",
"endDate": "2024-01-14T23:59:59Z"
},
"hasRenewal": false,
"submissionTerms": {
"variantPolicy": "allowed"
},
"hasOptions": false,
"status": "cancelled"
},
{
"id": "3",
"title": "Lighting System",
"description": "Audio Visual is a key component in delivering good teaching and operations at the University of Birmingham. The University has a strong in-house Audio-Visual team that sets design standards applicable throughout the institution, handles most design and sign-off tasks, provides professional advice, and maintains a large collection of over 350 spaces. The University requires a supplier of Audio-Visual kit who can provide an upgrade for the existing equipment installed within the Elgar Concert Hall. The Elgar Concert Hall is situated within the University's Bramall Music Building, which is an extension of the Aston Webb Building, and sits alongside the Great Hall. The Bramall opened its doors in June 2012 and includes a 450-seat concert hall (The Elgar Concert Hall) designed by renowned acoustician Nicholas Edwards of Acoustic Dimensions (Symphony Hall Birmingham, Symphony Centre Dallas, Royal Shakespeare Theatre). For further information, please visit: https://www.birmingham.ac.uk/bramall/index.aspx The concert hall and its acoustics can be configured for rehearsals and performances ranging from solo recitals to full symphony orchestra, 200-strong University Choir, multi-projector video and music-theatre presentations, and the electroacoustic studios' 100-channel sound diffusion system. New requirements for the upgrade will need to be compatible with existing equipment within the Elgar Concert Hall, and it is a mandatory requirement that delivery of equipment and installation or configuration will take place during the University's Christmas closed period, to ensure teaching is not affected. The profile fixtures which the University currently owns are ETC Source 4's, and any replacement fixtures supplied must retain compatibility with our current lens stock. Please note: We recommend suppliers utilise the opportunity to visit the Elgar Concert Hall as compatibility with our current stage and control room panels may or may not be possible depending on the solutions offered. Equipment will need to be delivered, received, and installed by no later than 14th January 2024.",
"awardCriteria": {
"criteria": [
{
"name": "Compliance to the Specification",
"type": "quality",
"description": "20"
},
{
"name": "Aftersales and Technical Back-up",
"type": "quality",
"description": "20"
},
{
"name": "Delivery, Installation, and Training",
"type": "quality",
"description": "15"
},
{
"name": "Sustainability and Environmental",
"type": "quality",
"description": "5"
},
{
"type": "price",
"description": "30"
}
]
},
"contractPeriod": {
"startDate": "2023-10-23T00:00:00+01:00",
"endDate": "2024-01-14T23:59:59Z"
},
"hasRenewal": false,
"submissionTerms": {
"variantPolicy": "allowed"
},
"hasOptions": false,
"status": "cancelled"
}
],
"items": [
{
"id": "1",
"additionalClassifications": [
{
"scheme": "CPV",
"id": "32321200",
"description": "Audio-visual equipment"
}
],
"deliveryAddresses": [
{
"region": "UKG31"
},
{
"region": "UKG31"
},
{
"region": "UKG31"
}
],
"relatedLot": "1"
},
{
"id": "2",
"additionalClassifications": [
{
"scheme": "CPV",
"id": "32342420",
"description": "Studio mixing console"
}
],
"deliveryAddresses": [
{
"region": "UKG31"
},
{
"region": "UKG31"
},
{
"region": "UKG31"
}
],
"relatedLot": "2"
},
{
"id": "3",
"additionalClassifications": [
{
"scheme": "CPV",
"id": "31527260",
"description": "Lighting systems"
}
],
"deliveryAddresses": [
{
"region": "UKG31"
},
{
"region": "UKG31"
},
{
"region": "UKG31"
}
],
"relatedLot": "3"
}
],
"submissionMethod": [
"electronicSubmission"
],
"submissionMethodDetails": "https://in-tendorganiser.co.uk/universityofbirmingham/aspx/",
"procurementMethod": "open",
"procurementMethodDetails": "Open procedure",
"coveredBy": [
"GPA"
],
"tenderPeriod": {
"endDate": "2023-09-08T12:00:00+01:00"
},
"submissionTerms": {
"languages": [
"en"
]
},
"awardPeriod": {
"startDate": "2023-09-08T12:01:00+01:00"
},
"bidOpening": {
"date": "2023-09-08T12:01:00+01:00"
},
"hasRecurrence": false,
"amendments": [
{
"id": "1",
"unstructuredChanges": [
{
"oldValue": {
"text": "Value Excluding VAT: PS450,000"
},
"newValue": {
"text": "Value excluding VAT: PS360,000"
},
"where": {
"section": "II.1.5",
"label": "Estimated Total Vale"
}
}
]
}
]
},
"parties": [
{
"id": "GB-COH-RC000645",
"name": "THE UNIVERSITY OF BIRMINGHAM",
"identifier": {
"legalName": "THE UNIVERSITY OF BIRMINGHAM",
"id": "RC000645",
"scheme": "GB-COH"
},
"address": {
"streetAddress": "Edgbaston",
"locality": "BIRMINGHAM",
"region": "UKG31",
"postalCode": "B152TT",
"countryName": "United Kingdom"
},
"contactPoint": {
"name": "Graham Price",
"email": "g.a.price@bham.ac.uk",
"url": "https://in-tendorganiser.co.uk/universityofbirmingham/aspx/"
},
"roles": [
"buyer"
],
"details": {
"url": "https://intranet.birmingham.ac.uk/index.aspx",
"classifications": [
{
"scheme": "TED_CA_TYPE",
"id": "BODY_PUBLIC",
"description": "Body governed by public law"
},
{
"scheme": "COFOG",
"id": "09",
"description": "Education"
}
]
}
},
{
"id": "GB-FTS-18346",
"name": "University of Birmingham",
"identifier": {
"legalName": "University of Birmingham"
},
"address": {
"locality": "Birmingham",
"postalCode": "B15 2TT",
"countryName": "United Kingdom"
},
"roles": [
"reviewBody"
]
},
{
"id": "GB-COH-OC383379",
"name": "SOUTHBY PRODUCTIONS LLP",
"identifier": {
"legalName": "SOUTHBY PRODUCTIONS LLP",
"id": "OC383379",
"scheme": "GB-COH"
},
"address": {
"locality": "High Wycombe",
"region": "UKI7",
"countryName": "United Kingdom"
},
"roles": [
"supplier"
],
"details": {
"scale": "sme"
}
},
{
"id": "GB-FTS-73658",
"name": "University of Birmingham",
"identifier": {
"legalName": "University of Birmingham"
},
"address": {
"locality": "Edgbaston",
"countryName": "United Kingdom"
},
"roles": [
"reviewBody"
]
},
{
"id": "GB-COH-13771164",
"name": "22live Limited",
"identifier": {
"legalName": "22live Limited",
"id": "13771164",
"scheme": "GB-COH"
},
"address": {
"locality": "Redditch",
"region": "UKG12",
"countryName": "United Kingdom"
},
"roles": [
"supplier"
],
"details": {
"scale": "sme"
}
}
],
"buyer": {
"id": "GB-COH-RC000645",
"name": "THE UNIVERSITY OF BIRMINGHAM"
},
"language": "en",
"awards": [
{
"id": "005665-2024-1",
"status": "active",
"suppliers": [
{
"id": "GB-COH-OC383379",
"name": "SOUTHBY PRODUCTIONS LLP"
}
]
},
{
"id": "005675-2024-1",
"title": "Mixing Console & Stage Boxes",
"status": "active",
"suppliers": [
{
"id": "GB-COH-13771164",
"name": "22live Limited"
}
]
}
],
"contracts": [
{
"id": "005665-2024-1",
"awardID": "005665-2024-1",
"status": "active",
"value": {
"amount": 323346.04,
"currency": "GBP"
},
"dateSigned": "2023-11-29T00:00:00Z"
},
{
"id": "005675-2024-1",
"awardID": "005675-2024-1",
"title": "Mixing Console & Stage Boxes",
"status": "active",
"value": {
"amount": 40003.8,
"currency": "GBP"
},
"dateSigned": "2023-11-17T00:00:00Z"
}
],
"bids": {
"statistics": [
{
"id": "1",
"measure": "bids",
"value": 6
},
{
"id": "2",
"measure": "bids",
"value": 6
}
]
}
}