Notice Information
Notice Title
Design Services New Maritime Museum & Archive ED-03-13
Notice Description
The Maritime Museum and Archive Project is for a new museum to be located in existing listed buildings at Ebrington in Derry~Londonderry. Derry City and Strabane District Council is the Contracting Authority. In 2015, following a Public Procurement Exercise under the Restricted Procedure for the Appointment of a Multi Disciplinary Consultant Team for the delivery of the Maritime Museum and Archive Project, Todd Architects were the successful Economic Operator and were duly appointed for, the sum of PS490,400.00, for the provision of architectural led integrated consultancy team professional consultancy services. At the time of their appointment, it was expected that the project would be completed in 2019. In 2018 the project was put on hold prior to the procurement of the Contractor, as the Contracting Authority was awaiting funding. At that time, the Integrated Consultant Team ("ICT") had completed RIBA Stages 1-3 and 85% of RIBA Stage 4. The project was on hold from 2018 until late 2023 due to funding issues. Funding is now in place for the completion of the project and such is required to be utilised very urgently. The original project completion was due in 2019. Currently it is anticipated that completion will occur in 2026.
Lot Information
Lot 1
The Maritime Museum and Archive Project is for a new museum to be located in existing listed buildings at Ebrington in Derry~Londonderry. Derry City and Strabane District Council is the Contracting Authority. In 2015, following a Public Procurement Exercise under the Restricted Procedure for the Appointment of a Multi Disciplinary Consultant Team for the delivery of the Maritime Museum and Archive Project, Todd Architects were selected as the successful Economic Operator and were duly appointed, for the sum of PS490,400.00, for the provision of architectural led integrated consultancy team professional consultancy services. At the time of their appointment, it was expected that the project would be completed in 2019. In 2018 the project was put on hold prior to the procurement of the Contractor, as the Contracting Authority was awaiting funding. At that time, the ICT had completed RIBA Stages 1-3 and 85% of RIBA Stage 4. The project was on hold from 2018 until late 2023. Funding is now in place for the completion of the stated project. The original project completion was due in 2019. Currently it is anticipated that the completion will occur in 2026. Derry City and Strabane District Council, the Contracting Authority, intends that the ICT appointed in 2015, complete the commission for which they were appointed. There have been a number of consequences as a result of the prolonged stand still of the project. During this time, there have been changes in legislation, in particular building control. Additionally, the statutory approvals for the project have lapsed and other changes have occurred, that could not have been reasonably been foreseen, that have impacted the project. Additionally, the project has been adversely affected by the extremely high rate of construction inflation during recent years. Neither the high rate of construction inflation nor the protracted period of standstill of the project could have been reasonably foreseen by the appointed consultant at the time of tendering for the project in 2015. Derry City and Strabane District Council, the Contracting Authority, is minded to amend the contract with Todd Architects, by the introduction of the X1 clause to the NEC3 PSC to address the inflationary impact on fees for the remainder of the contract. The scope of the project and the work that Todd Architects is required to perform has not materially changed. The original appointment was made using a NEC3 Option A Professional Services Contract that did not include an X1 Clause (Price Adjustment for inflation clause). At the time of appointment of Todd Architects, it was expected that the project would be complete by 2019. The anticipated completion date is currently 2026, some seven years later. During this time there have been unprecedented inflationary rises. In order to mitigate this significant increase, it is reasonable and necessary to apply the X1 clause for the remainder of the project. The Contracting Authority is minded that the proposed change to the contract is in accordance with regulation 72 of the Public Procurement Regulations Contracts. In this regard, it states that: 72.-(1) Contracts and framework agreements may be modified without a new procurement procedure in accordance with this Part in any of the following cases:- (e) where the modifications, irrespective of their value, are not substantial within the meaning of paragraph (8); The Contracting Authority is of the opinion that had the X1 clause been included in the original tender, the tender selection would have remained unchanged. It would not have attracted additional participants to the tender process, nor would it have changed the candidates selected, nor the outcome of the tender selection. Under the terms of the Public Procurement Regulations 72, a Voluntary Ex- Ante Transparency VEAT notice is required to cover a variation to the contract between Derry City and Strabane District Council, the Contracting Authority and the Integrated Consultant Team led by Todd Architects for the Maritime Museum Project in Derry~Londonderry. Derry City and Strabane District Council, the Contracting Authority is therefore publishing this Voluntary Ex Ante Transparency Notice to cover a variation to the stated contract and for additional tasks to be carried out necessary as a result of changes in legislation and lapses in statutory approvals. It should be noted that the scope of the original commission has not changed.
Procurement Information
Under Public Procurement Regulations 72, a Voluntary Ex- Ante Transparency notice is required to cover a variation to the contract between Derry City & Strabane District Council, the Contracting Authority and the ICT led by Todd Architects for the Maritime Museum Project. The Contracting Authority is publishing this VEAT Notice to cover variation to the contract and for additional tasks to be carried out necessary as a result of changes in legislation and lapses in statutory approvals. The scope of the original commission has not changed. In 2015, following a Public Procurement Exercise for the Appointment of a Multi Disciplinary Consultant Team for delivery of the Maritime Museum, Todd Architects were appointed for the sum of PS490,400.00. At the time of appointment project completion was intended to be in 2019. In 2018 the project was put on hold, awaiting funding. At that time, the ICT had completed RIBA Stages 1-3 and 85% RIBA Stage 4. The project was on hold until late 2023. Funding is now in place for the completion of the project but must be utilised urgently. Currently it is anticipated that completion will be 2026. The Contracting Authority, intends that the ICT appointed in 2015, complete the commission for which it was appointed. There have been a number of consequences as a result of the prolonged stand still of the project. During this time, there have been changes in legislation, in particular building control, the statutory approvals for the project have lapsed and other changes have occurred that could not have been reasonably been foreseen, that have impacted the project. Additionally, the project has been adversely affected by extremely high rates of inflation during recent years. Neither the high rates of inflation nor the protracted period of standstill of the project could have been reasonably foreseen by the appointed consultant at the time of tendering in 2015. The Contracting Authority, is minded to amend the contract, by the introduction of the X1 clause to the NEC3 PSC to address the inflationary impact on fees for the remainder of the contract. The original appointment used a NEC3 Option A PSC that did not include an X1 Clause (Price Adjustment for inflation clause). At the time of appointment of the ICT, project completion was 2019. The anticipated completion date is currently 2026, some 7years later. During this time there have been unprecedented construction industry inflationary rises. In order to mitigate this significant increase, it is reasonable and necessary to apply the X1 clause for the remainder of the project. The Contracting Authority is minded that the proposed change to the contract is in accordance with regulation 72 of the Public Procurement Regulations Contracts. In this regard, it states that: 72.-(1) Contracts and framework agreements may be modified without a new procurement procedure in accordance with this Part in any of the following cases:- (e) where the modifications, irrespective of their value, are not substantial within the meaning of paragraph (8); The Contracting Authority is of the opinion that had the X1 clause been included in the original tender, the tender selection would have remained unchanged from that concluded in 2015. Having considered all the issues the Contracting Authority is of the view that the introduction of the X1 clause does not render the contract materially different in character from the one initially concluded; the modification would not have attracted additional participants to the tender process, nor would it have changed the candidates selected, or the ultimate outcome of the tender selection. Further the modification does not change the economic balance of the contract in favour of the ICT and nor does the modification extend the scope of the contract considerably. Consequently, having considered the matter the Contracting Authority is of the view that this matter comes within the scope of Regulation 72(1)(e) and the related Regulation 72(8).
Notice Details
Publication & Lifecycle
- Open Contracting ID
- ocds-h6vhtk-045589
- Publication Source
- Find A Tender Service
- Latest Notice
- https://www.find-tender.service.gov.uk/Notice/013638-2024
- Current Stage
- Award
- All Stages
- Award
Procurement Classification
- Notice Type
- Award Notice
- Procurement Type
- Standard
- Procurement Category
- Services
- Procurement Method
- Limited
- Procurement Method Details
- Award procedure without prior publication of a call for competition
- Tender Suitability
- Not specified
- Awardee Scale
- SME
Common Procurement Vocabulary (CPV)
- CPV Divisions
71 - Architectural, construction, engineering and inspection services
-
- CPV Codes
71220000 - Architectural design services
71541000 - Construction project management services
Notice Value(s)
- Tender Value
- Not specified
- Lots Value
- Not specified
- Awards Value
- Not specified
- Contracts Value
- £812,906 £500K-£1M
Notice Dates
- Publication Date
- 26 Apr 20241 years ago
- Submission Deadline
- Not specified
- Future Notice Date
- Not specified
- Award Date
- 19 Oct 201510 years ago
- Contract Period
- Not specified - Not specified
- Recurrence
- Not specified
Notice Status
- Tender Status
- Complete
- Lots Status
- Not Specified
- Awards Status
- Active
- Contracts Status
- Active
Buyer & Supplier
Contracting Authority (Buyer)
- Main Buyer
- DERRY CITY & STRABANE DISTRICT COUNCIL
- Contact Name
- Colin Killeen
- Contact Email
- tenders@derrystrabane.com
- Contact Phone
- +44 2871253253
Buyer Location
- Locality
- DERRY
- Postcode
- BT48 7NN
- Post Town
- Northern Ireland
- Country
- Northern Ireland
-
- Major Region (ITL 1)
- TLN Northern Ireland
- Basic Region (ITL 2)
- TLN0 Northern Ireland
- Small Region (ITL 3)
- TLN0A Derry City and Strabane
- Delivery Location
- TLN0A Derry City and Strabane
-
- Local Authority
- Derry City and Strabane
- Electoral Ward
- Northland
- Westminster Constituency
- Foyle
Further Information
Open Contracting Data Standard (OCDS)
View full OCDS Record for this contracting process
The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.
{
"tag": [
"compiled"
],
"id": "ocds-h6vhtk-045589-2024-04-26T15:21:15+01:00",
"date": "2024-04-26T15:21:15+01:00",
"ocid": "ocds-h6vhtk-045589",
"description": "Derry City & Strabane District Council will incorporate a standstill period at the point information on the award of the contract is communicated to suppliers by means of this VEAT notice. The Standstill period will be for a period of 10 calendar days expiring Midnight 7th May 2024",
"initiationType": "tender",
"tender": {
"id": "ocds-h6vhtk-045589",
"legalBasis": {
"id": "32014L0024",
"scheme": "CELEX"
},
"title": "Design Services New Maritime Museum & Archive ED-03-13",
"status": "complete",
"classification": {
"scheme": "CPV",
"id": "71220000",
"description": "Architectural design services"
},
"mainProcurementCategory": "services",
"description": "The Maritime Museum and Archive Project is for a new museum to be located in existing listed buildings at Ebrington in Derry~Londonderry. Derry City and Strabane District Council is the Contracting Authority. In 2015, following a Public Procurement Exercise under the Restricted Procedure for the Appointment of a Multi Disciplinary Consultant Team for the delivery of the Maritime Museum and Archive Project, Todd Architects were the successful Economic Operator and were duly appointed for, the sum of PS490,400.00, for the provision of architectural led integrated consultancy team professional consultancy services. At the time of their appointment, it was expected that the project would be completed in 2019. In 2018 the project was put on hold prior to the procurement of the Contractor, as the Contracting Authority was awaiting funding. At that time, the Integrated Consultant Team (\"ICT\") had completed RIBA Stages 1-3 and 85% of RIBA Stage 4. The project was on hold from 2018 until late 2023 due to funding issues. Funding is now in place for the completion of the project and such is required to be utilised very urgently. The original project completion was due in 2019. Currently it is anticipated that completion will occur in 2026.",
"lots": [
{
"id": "1",
"description": "The Maritime Museum and Archive Project is for a new museum to be located in existing listed buildings at Ebrington in Derry~Londonderry. Derry City and Strabane District Council is the Contracting Authority. In 2015, following a Public Procurement Exercise under the Restricted Procedure for the Appointment of a Multi Disciplinary Consultant Team for the delivery of the Maritime Museum and Archive Project, Todd Architects were selected as the successful Economic Operator and were duly appointed, for the sum of PS490,400.00, for the provision of architectural led integrated consultancy team professional consultancy services. At the time of their appointment, it was expected that the project would be completed in 2019. In 2018 the project was put on hold prior to the procurement of the Contractor, as the Contracting Authority was awaiting funding. At that time, the ICT had completed RIBA Stages 1-3 and 85% of RIBA Stage 4. The project was on hold from 2018 until late 2023. Funding is now in place for the completion of the stated project. The original project completion was due in 2019. Currently it is anticipated that the completion will occur in 2026. Derry City and Strabane District Council, the Contracting Authority, intends that the ICT appointed in 2015, complete the commission for which they were appointed. There have been a number of consequences as a result of the prolonged stand still of the project. During this time, there have been changes in legislation, in particular building control. Additionally, the statutory approvals for the project have lapsed and other changes have occurred, that could not have been reasonably been foreseen, that have impacted the project. Additionally, the project has been adversely affected by the extremely high rate of construction inflation during recent years. Neither the high rate of construction inflation nor the protracted period of standstill of the project could have been reasonably foreseen by the appointed consultant at the time of tendering for the project in 2015. Derry City and Strabane District Council, the Contracting Authority, is minded to amend the contract with Todd Architects, by the introduction of the X1 clause to the NEC3 PSC to address the inflationary impact on fees for the remainder of the contract. The scope of the project and the work that Todd Architects is required to perform has not materially changed. The original appointment was made using a NEC3 Option A Professional Services Contract that did not include an X1 Clause (Price Adjustment for inflation clause). At the time of appointment of Todd Architects, it was expected that the project would be complete by 2019. The anticipated completion date is currently 2026, some seven years later. During this time there have been unprecedented inflationary rises. In order to mitigate this significant increase, it is reasonable and necessary to apply the X1 clause for the remainder of the project. The Contracting Authority is minded that the proposed change to the contract is in accordance with regulation 72 of the Public Procurement Regulations Contracts. In this regard, it states that: 72.-(1) Contracts and framework agreements may be modified without a new procurement procedure in accordance with this Part in any of the following cases:- (e) where the modifications, irrespective of their value, are not substantial within the meaning of paragraph (8); The Contracting Authority is of the opinion that had the X1 clause been included in the original tender, the tender selection would have remained unchanged. It would not have attracted additional participants to the tender process, nor would it have changed the candidates selected, nor the outcome of the tender selection. Under the terms of the Public Procurement Regulations 72, a Voluntary Ex- Ante Transparency VEAT notice is required to cover a variation to the contract between Derry City and Strabane District Council, the Contracting Authority and the Integrated Consultant Team led by Todd Architects for the Maritime Museum Project in Derry~Londonderry. Derry City and Strabane District Council, the Contracting Authority is therefore publishing this Voluntary Ex Ante Transparency Notice to cover a variation to the stated contract and for additional tasks to be carried out necessary as a result of changes in legislation and lapses in statutory approvals. It should be noted that the scope of the original commission has not changed.",
"awardCriteria": {
"criteria": [
{
"name": "Methodology",
"type": "quality",
"description": "21"
},
{
"name": "Programme",
"type": "quality",
"description": "7"
},
{
"name": "Resources",
"type": "quality",
"description": "17.5"
},
{
"name": "Coordination with Interpretative Designer",
"type": "quality",
"description": "17.5"
},
{
"name": "Cost Management",
"type": "quality",
"description": "7"
},
{
"type": "price",
"description": "30"
}
]
},
"hasOptions": false
}
],
"items": [
{
"id": "1",
"additionalClassifications": [
{
"scheme": "CPV",
"id": "71541000",
"description": "Construction project management services"
}
],
"deliveryAddresses": [
{
"region": "UKN0A"
}
],
"deliveryLocation": {
"description": "Ebrington, Derry ~ Londonderry"
},
"relatedLot": "1"
}
],
"procurementMethod": "limited",
"procurementMethodDetails": "Award procedure without prior publication of a call for competition",
"coveredBy": [
"GPA"
],
"reviewDetails": "As per PCR2015",
"procurementMethodRationaleClassifications": [
{
"scheme": "TED_PT_AWARD_CONTRACT_WITHOUT_CALL",
"id": "D_OUTSIDE_SCOPE",
"description": "The procurement falls outside the scope of application of the directive"
}
],
"procurementMethodRationale": "Under Public Procurement Regulations 72, a Voluntary Ex- Ante Transparency notice is required to cover a variation to the contract between Derry City & Strabane District Council, the Contracting Authority and the ICT led by Todd Architects for the Maritime Museum Project. The Contracting Authority is publishing this VEAT Notice to cover variation to the contract and for additional tasks to be carried out necessary as a result of changes in legislation and lapses in statutory approvals. The scope of the original commission has not changed. In 2015, following a Public Procurement Exercise for the Appointment of a Multi Disciplinary Consultant Team for delivery of the Maritime Museum, Todd Architects were appointed for the sum of PS490,400.00. At the time of appointment project completion was intended to be in 2019. In 2018 the project was put on hold, awaiting funding. At that time, the ICT had completed RIBA Stages 1-3 and 85% RIBA Stage 4. The project was on hold until late 2023. Funding is now in place for the completion of the project but must be utilised urgently. Currently it is anticipated that completion will be 2026. The Contracting Authority, intends that the ICT appointed in 2015, complete the commission for which it was appointed. There have been a number of consequences as a result of the prolonged stand still of the project. During this time, there have been changes in legislation, in particular building control, the statutory approvals for the project have lapsed and other changes have occurred that could not have been reasonably been foreseen, that have impacted the project. Additionally, the project has been adversely affected by extremely high rates of inflation during recent years. Neither the high rates of inflation nor the protracted period of standstill of the project could have been reasonably foreseen by the appointed consultant at the time of tendering in 2015. The Contracting Authority, is minded to amend the contract, by the introduction of the X1 clause to the NEC3 PSC to address the inflationary impact on fees for the remainder of the contract. The original appointment used a NEC3 Option A PSC that did not include an X1 Clause (Price Adjustment for inflation clause). At the time of appointment of the ICT, project completion was 2019. The anticipated completion date is currently 2026, some 7years later. During this time there have been unprecedented construction industry inflationary rises. In order to mitigate this significant increase, it is reasonable and necessary to apply the X1 clause for the remainder of the project. The Contracting Authority is minded that the proposed change to the contract is in accordance with regulation 72 of the Public Procurement Regulations Contracts. In this regard, it states that: 72.-(1) Contracts and framework agreements may be modified without a new procurement procedure in accordance with this Part in any of the following cases:- (e) where the modifications, irrespective of their value, are not substantial within the meaning of paragraph (8); The Contracting Authority is of the opinion that had the X1 clause been included in the original tender, the tender selection would have remained unchanged from that concluded in 2015. Having considered all the issues the Contracting Authority is of the view that the introduction of the X1 clause does not render the contract materially different in character from the one initially concluded; the modification would not have attracted additional participants to the tender process, nor would it have changed the candidates selected, or the ultimate outcome of the tender selection. Further the modification does not change the economic balance of the contract in favour of the ICT and nor does the modification extend the scope of the contract considerably. Consequently, having considered the matter the Contracting Authority is of the view that this matter comes within the scope of Regulation 72(1)(e) and the related Regulation 72(8)."
},
"awards": [
{
"id": "013638-2024-1",
"relatedLots": [
"1"
],
"title": "Design Services New Maritime Museum & Archive ED-03-13",
"status": "active",
"suppliers": [
{
"id": "GB-COH-NI021213",
"name": "Todd Architects"
}
]
}
],
"parties": [
{
"id": "GB-FTS-112156",
"name": "Derry City & Strabane District Council",
"identifier": {
"legalName": "Derry City & Strabane District Council",
"noIdentifierRationale": "notOnAnyRegister"
},
"address": {
"streetAddress": "98 Strand Road",
"locality": "Derry",
"region": "UKN0A",
"postalCode": "BT487NN",
"countryName": "United Kingdom"
},
"contactPoint": {
"name": "Colin Killeen",
"telephone": "+44 2871253253",
"email": "Tenders@derrystrabane.com"
},
"roles": [
"buyer"
],
"details": {
"url": "http://www.derrystrabane.com",
"classifications": [
{
"scheme": "TED_CA_TYPE",
"id": "REGIONAL_AUTHORITY",
"description": "Regional or local authority"
},
{
"scheme": "COFOG",
"id": "01",
"description": "General public services"
}
]
}
},
{
"id": "GB-COH-NI021213",
"name": "Todd Architects",
"identifier": {
"legalName": "Todd Architects",
"id": "NI021213",
"scheme": "GB-COH"
},
"address": {
"streetAddress": "2nd Floor Titanic House, 6 Queens Road",
"locality": "Belfast",
"region": "UKN06",
"postalCode": "BT3 9DT",
"countryName": "United Kingdom"
},
"roles": [
"supplier"
],
"details": {
"scale": "sme"
}
},
{
"id": "GB-FTS-80342",
"name": "The Royal Courts of Justice NI",
"identifier": {
"legalName": "The Royal Courts of Justice NI"
},
"address": {
"locality": "Belfast",
"countryName": "United Kingdom"
},
"roles": [
"reviewBody",
"mediationBody",
"reviewContactPoint"
]
}
],
"buyer": {
"id": "GB-FTS-112156",
"name": "Derry City & Strabane District Council"
},
"contracts": [
{
"id": "013638-2024-1",
"awardID": "013638-2024-1",
"title": "Design Services New Maritime Museum & Archive ED-03-13",
"status": "active",
"value": {
"amount": 812906.34,
"currency": "GBP"
},
"dateSigned": "2015-10-20T00:00:00+01:00"
}
],
"links": [
{
"rel": "prev",
"href": "https://ted.europa.eu/udl?uri=TED:NOTICE:419198-2014:TEXT:EN:HTML"
}
],
"language": "en"
}