Notice Information
Notice Title
Overhead lines and associated equipment and services
Notice Description
This procurement event relates to procurement of overhead lines and associated equipment and services. National Grid (NG) are seeking to procure the nominated equipment and for certain lots options and opportunities to cover aligned installation, testing, commissioning and maintenance activities. NG is seeking to appoint suppliers with capacity and capability to deliver overhead lines and associated equipment and services. This procurement has been broken down into lots to best reflect the spread of capacity and capability in the market: NG typically has several projects requiring overhead lines equipment which can vary in location / site type. The contractual arrangement will comprise of UK and US framework agreements with call off contracts. The contract principles paper (see VI.3) describes those arrangements at a high level. The estimated total value in II.1.5 includes the US lots, the estimated values of which have been converted from USD to GBP at a rate of PS1 = $1.33.
Lot Information
HVAC Cable systems >= 275kV and above (UK)
This Lot includes the supply of HVAC Cable systems >= 275kV and above for use in the UK, and associated supplies, services and other activities as applicable. Additional information: As explained in the most recent periodic indicative notice (see Iv.2.1), the registration process for ARIBA can take up to two weeks, so interested parties that have not already done so should register via this link https://support.ariba.com/item/view/174948 as soon as possible to maximise the response time that is available to them.
Renewal: At the end of the initial 60-month period, options for extending for a maximum of 36 months in one or more renewal periods. The duration of call-off contracts may be longer than 8 years and may overlap and extend beyond the end of the main framework agreements
AC Cables and Accessories (66kV - 274kV) (UK)This Lot includes the supply of AC Cables and accessories (66kV - 274kV) for use in the UK, and associated supplies, services and other activities as applicable. Additional information: As explained in the most recent periodic indicative notice (see Iv.2.1), the registration process for ARIBA can take up to two weeks, so interested parties that have not already done so should register via this link https://support.ariba.com/item/view/174948 as soon as possible to maximise the response time that is available to them.
Renewal: At the end of the initial 60-month period, options for extending for a maximum of 36 months in one or more renewal periods. The duration of call-off contracts may be longer than 8 years and may overlap and extend beyond the end of the main framework agreements.
AC Cables and Accessories (2kV - 65kV) (UK)This Lot includes the supply of AC Cables and accessories (2kV - 65kV) for use in the UK, and associated supplies. Accessories specified by National Grid's UK distribution business (NGED) under their existing frameworks are excluded from this scope. Additional information: As explained in the most recent periodic indicative notice (see Iv.2.1), the registration process for ARIBA can take up to two weeks, so interested parties that have not already done so should register via this link https://support.ariba.com/item/view/174948 as soon as possible to maximise the response time that is available to them
Renewal: At the end of the initial 60-month period, options for extending for a maximum of 36 months in one or more renewal periods. The duration of call-off contracts may be longer than 8 years and may overlap and extend beyond the end of the main framework agreements.
AC Cables <=1kV and below (UK)This Lot includes the supply of AC Cables <=1kV and below for use in the UK, and associated supplies, services and other activities as applicable. Additional information: As explained in the most recent periodic indicative notice (see Iv.2.1), the registration process for ARIBA can take up to two weeks, so interested parties that have not already done so should register via this link https://support.ariba.com/item/view/174948 as soon as possible to maximise the response time that is available to them
Renewal: At the end of the initial 60-month period, options for extending for a maximum of 36 months in one or more renewal periods. The duration of call-off contracts may be longer than 8 years and may overlap and extend beyond the end of the main framework agreements.
Cables >= 69kV - HV/EHVAC Cable systems (69kV and above) (US)This Lot includes the supply of HV/EHVAC Cable systems (69kV and above) for use in the US, and associated supplies, services and other activities as applicable. Additional information: As explained in the most recent periodic indicative notice (see Iv.2.1), the registration process for ARIBA can take up to two weeks, so interested parties that have not already done so should register via this link https://support.ariba.com/item/view/174948 as soon as possible to maximise the response time that is available to them
Renewal: At the end of the initial 60-month period, options for extending for a maximum of 36 months in one or more renewal periods. The duration of call-off contracts may be longer than 8 years and may overlap and extend beyond the end of the main framework agreements.
AC Cables 2kV - 68kV (US)This Lot includes the supply of AC Cables 2kV - 68kV for use in the US, and associated supplies, services and other activities as applicable. Additional information: As explained in the most recent periodic indicative notice (see Iv.2.1), the registration process for ARIBA can take up to two weeks, so interested parties that have not already done so should register via this link https://support.ariba.com/item/view/174948 as soon as possible to maximise the response time that is available to them
Renewal: At the end of the initial 60-month period, options for extending for a maximum of 36 months in one or more renewal periods. The duration of call-off contracts may be longer than 8 years and may overlap and extend beyond the end of the main framework agreements.
AC Cables <=1kV and below (US)This Lot includes the supply of AC Cables <=1kV and below for use in the US, and associated supplies, services and other activities as applicable. Additional information: As explained in the most recent periodic indicative notice (see Iv.2.1), the registration process for ARIBA can take up to two weeks, so interested parties that have not already done so should register via this link https://support.ariba.com/item/view/174948 as soon as possible to maximise the response time that is available to them
Renewal: At the end of the initial 60-month period, options for extending for a maximum of 36 months in one or more renewal periods. The duration of call-off contracts may be longer than 8 years and may overlap and extend beyond the end of the main framework agreements.
Phase Conductor (US)This Lot includes the supply of phase conductors for use in the US, and associated supplies, services and other activities as applicable. Additional information: As explained in the most recent periodic indicative notice (see Iv.2.1), the registration process for ARIBA can take up to two weeks, so interested parties that have not already done so should register via this link https://support.ariba.com/item/view/174948 as soon as possible to maximise the response time that is available to them.
Renewal: At the end of the initial 60-month period, options for extending for a maximum of 36 months in one or more renewal periods. The duration of call-off contracts may be longer than 8 years and may overlap and extend beyond the end of the main framework agreements.
OPGW (US) - Fiber Optic Cable and Optical Ground Wire (US)This Lot includes the supply of fiber optic cable and optical ground wire for use in the US, and associated supplies, services and other activities as applicable. Additional information: As explained in the most recent periodic indicative notice (see Iv.2.1), the registration process for ARIBA can take up to two weeks, so interested parties that have not already done so should register via this link https://support.ariba.com/item/view/174948 as soon as possible to maximise the response time that is available to them.
Renewal: At the end of the initial 60-month period, options for extending for a maximum of 36 months in one or more renewal periods. The duration of call-off contracts may be longer than 8 years and may overlap and extend beyond the end of the main framework agreements.
Insulated Cable (US)This Lot includes the supply of insulated cables for use in the US, and associated supplies, services and other activities as applicable. Additional information: As explained in the most recent periodic indicative notice (see Iv.2.1), the registration process for ARIBA can take up to two weeks, so interested parties that have not already done so should register via this link https://support.ariba.com/item/view/174948 as soon as possible to maximise the response time that is available to them.
Renewal: At the end of the initial 60-month period, options for extending for a maximum of 36 months in one or more renewal periods. The duration of call-off contracts may be longer than 8 years and may overlap and extend beyond the end of the main framework agreements.
Composite Insulator (US)This Lot includes the supply of composite insulators for use in the US, and associated supplies, services and other activities as applicable. Additional information: As explained in the most recent periodic indicative notice (see Iv.2.1), the registration process for ARIBA can take up to two weeks, so interested parties that have not already done so should register via this link https://support.ariba.com/item/view/174948 as soon as possible to maximise the response time that is available to them.
Renewal: At the end of the initial 60-month period, options for extending for a maximum of 36 months in one or more renewal periods. The duration of call-off contracts may be longer than 8 years and may overlap and extend beyond the end of the main framework agreements.
Glass Insulator (US)This Lot includes the supply of glass insulators for use in the US, and associated supplies, services and other activities as applicable. Additional information: As explained in the most recent periodic indicative notice (see Iv.2.1), the registration process for ARIBA can take up to two weeks, so interested parties that have not already done so should register via this link https://support.ariba.com/item/view/174948 as soon as possible to maximise the response time that is available to them.
Renewal: At the end of the initial 60-month period, options for extending for a maximum of 36 months in one or more renewal periods. The duration of call-off contracts may be longer than 8 years and may overlap and extend beyond the end of the main framework agreements.
Porcelain Insulator (US)This Lot includes the supply of porcelain insulators for use in the US, and associated supplies, services and other activities as applicable. Additional information: As explained in the most recent periodic indicative notice (see Iv.2.1), the registration process for ARIBA can take up to two weeks, so interested parties that have not already done so should register via this link https://support.ariba.com/item/view/174948 as soon as possible to maximise the response time that is available to them.
Renewal: At the end of the initial 60-month period, options for extending for a maximum of 36 months in one or more renewal periods. The duration of call-off contracts may be longer than 8 years and may overlap and extend beyond the end of the main framework agreements.
Reclosers (All voltages) (US)This Lot includes the supply of reclosers (all voltages) for use in the US, and associated supplies, services and other activities as applicable. Additional information: As explained in the most recent periodic indicative notice (see Iv.2.1), the registration process for ARIBA can take up to two weeks, so interested parties that have not already done so should register via this link https://support.ariba.com/item/view/174948 as soon as possible to maximise the response time that is available to them.
Renewal: At the end of the initial 60-month period, options for extending for a maximum of 36 months in one or more renewal periods. The duration of call-off contracts may be longer than 8 years and may overlap and extend beyond the end of the main framework agreements.
Instrument Transformers (All voltages) (US)This Lot includes the supply of instrument transformers (all voltages) for use in the US, and associated supplies, services and other activities as applicable. Additional information: As explained in the most recent periodic indicative notice (see Iv.2.1), the registration process for ARIBA can take up to two weeks, so interested parties that have not already done so should register via this link https://support.ariba.com/item/view/174948 as soon as possible to maximise the response time that is available to them.
Renewal: At the end of the initial 60-month period, options for extending for a maximum of 36 months in one or more renewal periods. The duration of call-off contracts may be longer than 8 years and may overlap and extend beyond the end of the main framework agreements.
Switches and Disconnectors (US)This Lot includes the supply of switches and disconnectors for use in the US, and associated supplies, services and other activities as applicable. Additional information: As explained in the most recent periodic indicative notice (see Iv.2.1), the registration process for ARIBA can take up to two weeks, so interested parties that have not already done so should register via this link https://support.ariba.com/item/view/174948 as soon as possible to maximise the response time that is available to them.
Renewal: At the end of the initial 60-month period, options for extending for a maximum of 36 months in one or more renewal periods. The duration of call-off contracts may be longer than 8 years and may overlap and extend beyond the end of the main framework agreements.
Notice Details
Publication & Lifecycle
- Open Contracting ID
- ocds-h6vhtk-049955
- Publication Source
- Find A Tender Service
- Latest Notice
- https://www.find-tender.service.gov.uk/Notice/035643-2024
- Current Stage
- Tender
- All Stages
- Planning, Tender
Procurement Classification
- Notice Type
- Planning Notice
- Procurement Type
- Framework
- Procurement Category
- Goods
- Procurement Method
- Selective
- Procurement Method Details
- Negotiated procedure with prior call for competition
- Tender Suitability
- Not specified
- Awardee Scale
- Not specified
Common Procurement Vocabulary (CPV)
- CPV Divisions
31 - Electrical machinery, apparatus, equipment and consumables; lighting
32 - Radio, television, communication, telecommunication and related equipment
-
- CPV Codes
31000000 - Electrical machinery, apparatus, equipment and consumables; lighting
31200000 - Electricity distribution and control apparatus
31300000 - Insulated wire and cable
31320000 - Power distribution cables
31340000 - Insulated cable accessories
31341000 - Insulated cable reels
31650000 - Insulating fittings
31682400 - Overhead electrical equipment
31700000 - Electronic, electromechanical and electrotechnical supplies
32560000 - Fibre-optic materials
51112000 - Installation services of electricity distribution and control equipment
Notice Value(s)
- Tender Value
- £2,540,699,248 £1B-£10B
- Lots Value
- £3,132,860,000 £1B-£10B
- Awards Value
- Not specified
- Contracts Value
- Not specified
Notice Dates
- Publication Date
- 4 Nov 20241 years ago
- Submission Deadline
- 4 Nov 2024Expired
- Future Notice Date
- 26 Sep 2024Expired
- Award Date
- Not specified
- Contract Period
- Not specified - Not specified
- Recurrence
- Not specified
Notice Status
- Tender Status
- Active
- Lots Status
- Active
- Awards Status
- Not Specified
- Contracts Status
- Not Specified
Buyer & Supplier
Contracting Authority (Buyer)
- Main Buyer
- NATIONAL GRID UK LIMITED
- Additional Buyers
- Contact Name
- Available with D3 Tenders Premium →
- Contact Email
- Available with D3 Tenders Premium →
- Contact Phone
- Available with D3 Tenders Premium →
Buyer Location
- Locality
- LONDON
- Postcode
- WC2N 5EH
- Postcode Area
- Central London
- Country
- England
-
- Major Region (ITL 1)
- TLI London
- Basic Region (ITL 2)
- TLI3 Inner London - West
- Small Region (ITL 3)
- TLI35 Westminster and City of London
- Delivery Location
- Not specified
-
- Local Authority
- Westminster
- Electoral Ward
- St James's
- Westminster Constituency
- Cities of London and Westminster
Further Information
Open Contracting Data Standard (OCDS)